IR 05000338/2023001
| ML23118A017 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 05/02/2023 |
| From: | Matthew Fannon Division Reactor Projects II |
| To: | Stoddard D Dominion Energy Co |
| References | |
| IR 2023001 | |
| Download: ML23118A017 (12) | |
Text
SUBJECT:
NORTH ANNA POWER STATION - INTEGRATED INSPECTION REPORT 05000338/2023001 AND 05000339/2023001
Dear Daniel Stoddard:
On March 31, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at North Anna Power Station. On April 20, 2023, the NRC inspectors discussed the results of this inspection with Lisa Hilbert, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Matthew S. Fannon, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 05000338 and 05000339 License Nos. NPF-4 and NPF-7
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000338 and 05000339
License Numbers:
Report Numbers:
05000338/2023001 and 05000339/2023001
Enterprise Identifier:
I-2023-001-0026
Licensee:
Dominion Energy (Virginia Electric Company)
Facility:
North Anna Power Station
Location:
Mineral, VA
Inspection Dates:
January 1, 2023 to March 31, 2023
Inspectors:
K. Carrington, Senior Resident Inspector
D. Turpin, Resident Inspector
A. Wilson, Senior Project Engineer
Approved By:
Matthew S. Fannon, Chief
Reactor Projects Branch 4
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at North Anna Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 operated at or near rated thermal power for the entire inspection period.
Unit 2 operated at or near rated thermal power for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1 auxiliary service water pump following planned maintenance, on January 12, 2023
- (2) Unit 1 "B" main control room chiller (1-HV-E-4B) system during planned maintenance, on January 13, 2023
- (3) Unit 1 "A" low head safety injection (LHSI) system during "B" LHSI system planned maintenance, on February 22, 2023
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Fire Area 7C-1, Unit 1, 1-III battery room, on January 24, 2023
- (2) Fire Area 8, Unit 1 turbine building (mechanical equipment room), on January 26, 2023
- (3) Fire Zone 6-1, Unit 1 emergency switchgear instrument rack and air conditioning rooms, on February 23, 2023
- (4) Fire Area 6-2, Unit 2 emergency switchgear instrument rack and air conditioning rooms, on February 23, 2023
71111.06 - Flood Protection Measures
Flooding Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated internal flooding mitigation protections in the Unit 1 cable spreading room.
71111.07A - Heat Exchanger/Sink Performance
Annual Review (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness and performance of:
- (1) Unit 1 "A" spent fuel pit cooling system heat exchanger, 1-FC-E-1A, on January 31, 2023
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the main control room during the Unit 1 "J" emergency diesel generator (EDG) trip, on January 25, 2023, and during the Unit 2 "A" low pressure heater drain pump trip, on March 13, 2023.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator requalification training in the control room simulator, on March 7, 2023.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:
- (1) Unit 1 and Unit 2 auxiliary feedwater system (AFW)
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 1 and 2 elevated risk associated with planned maintenance and testing on the Unit 2 "J" EDG system, Unit 2 control room heating and ventilation system, Unit 2 train "B" slave relay system, Unit 1 "A" boric acid transfer pump system, and the common "1A" fuel pit cooling system, the week of January 16, 2023
- (2) Unit 1 elevated risk associated with channel III protection system testing and emergent troubleshooting of the Unit 1 ultrasonic flowmeter, on January 23, 2023
- (3) Unit 1 elevated risk associated with planned maintenance and testing on the I-I battery charger system, Unit 1 "A" charging pump system, Unit 1 "A" spent fuel pit cooling heat exchanger system, and the common station blackout diesel system, the week of January 30, 2023
- (4) Unit 1 elevated risk associated with emergent maintenance on the Unit 1 "J" EDG due to high lube oil temperature trip during testing, on January 26, 2023
- (5) Units 1 and 2 yellow risk during primary grade system planned maintenance, the week of March 7, 2023
- (6) Unit 1 and Unit 2 elevated risk associated with planned maintenance on the Unit 1 "J" EDG system, Unit 2 main feed pump swap, and emergent maintenance on the common station blackout diesel system due to programmable logic controller issues, the week of March 27, 2023
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (2 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Operability Determination Correction Action (CA) 8587871, "Charging Pump Suction MOVs (Motor-operated Valves) Removed from JOG (Joint Owners Group) Program with Insufficient Basis, Revision 3," on January 6, 2023
- (2) Condition Report (CR) 1221151, "'B' Phase Directional Over Current Relay Failed As-found Testing," on March 9, 2023
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)
(1)1-OP-6.9, "Slow Start and Operation of 1J Diesel Generator," following Unit 1 "J" EDG trip on lube oil high temperature, on January 26, 2023 (2)1-PT-82.2B, "1J Diesel Generator Test (Simulated Loss of Off-site Power)," following Unit 1 "J" EDG 3-and 6-year preventive maintenance outage, on March 23, 2023 (3)1-PT-87.4J OTO1 (One-Time Only), "Station Battery Charger 1-IV Service Testing,"
following planned maintenance, on March 31, 2023
Surveillance Testing (IP Section 03.01) (5 Samples)
(1)2-PT-82.4A, "2H Diesel Generator Test (Start by ESF (Engineered Safety Feature)
Actuation)," on January 4, 2023 (2)2-PT-14.1, "U2 Charging Pump 1A Quarterly Test," on January 9, 2023 (3)1-PT-82.9H, "1H Diesel Generator Test (Local Operation)," on January 12, 2023 (4)1-PT-71.3Q, "1-FW-P-3B, 'B' Motor-Driven AFW Pump and Valve Test," on January 31, 2023 (5)2-PT-57.1B, "Emergency Core Cooling Subsystem - Low Head Safety Injection Pump (2-SI-P-1B)," on February 16, 2023
Inservice Testing (IST) (IP Section 03.01) (1 Sample)
(1)2-PT-71.3Q.1, "2-FW-P-3B, Motor-Driven AFW IST (Inservice Test) Comprehensive Pump and Valve Test," on January 17, 2023
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
- (1) The inspectors observed emergency preparedness drill "NJan23EPD" with simulator, operations support center, and technical support center participation, on January 10,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
- (1) Unit 1 (January 1, 2022 through December 31, 2022)
- (2) Unit 2 (January 1, 2022 through December 31, 2022)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (2 Samples)
- (1) Unit 1 (January 1, 2022 through December 31, 2022)
- (2) Unit 2 (January 1, 2022 through December 31, 2022)
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)
- (1) Unit 1 (January 1, 2022 through December 31, 2022)
- (2) Unit 2 (January 1, 2022 through December 31, 2022)
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)
- (1) Unit 1 (January 1, 2022 through December 31, 2022)
- (2) Unit 2 (January 1, 2022 through December 31, 2022)
BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)
- (1) Unit 1 (January 1, 2022 through December 31, 2022)
- (2) Unit 2 (January 1, 2022 through December 31, 2022)
71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
- (1) CR1218151, "Connection with Everbridge and WebEOC was Lost," on January 27,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On April 20, 2023, the inspectors presented the integrated inspection results to Lisa Hilbert, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR1217110
Gland Follower and Gland Stud Corrosion/degradation
01/11/2023
11715-DAR-078A
Service Water System
Rev. 6
11715-FB-040D
Flow/Valve Operating Numbers Diagram Air Conditioning
Condenser Water System North Anna Power Station Unit 2
Virginia Power
Rev. 47
11715-FM-078A
Service Water System
Rev. 67
11715-FM-078H
Service Water System
Rev. 33
11715-FM-078J
Service Water System
Rev. 5
Drawings
11715-FM-096A
Flow/Valve Operating Numbers Diagram, Safety Injection
System
Rev. 44
0-OP-49.9A
Valve Checkoff - Control Room A/C Service Water
Rev. 12
1-OP-21.06
Main Control and Relay Room Air Conditioning
Rev. 42
Procedures
1-OP-7.1A
Valve Checkoff - Low Head Safety Injection System
Rev. 1
Fire Plans
0-FS-CT-1
Cable Tray Spreading Room and Battery Room 2-1. 1-1, 2-
3, 1-3
Rev. 5
Miscellaneous
0-FS-TB-1
Turbine Building Fire Fighting Strategy
1-FS-S-3
Unit 1 Emergency Switchgear Instrument Rack and Air
Conditioning Rooms Service Building Elev. 254 Ft (S-54)
Safe Shutdown Equipment
Rev. 15
Procedures
2-FS-S-3
Unit 2 Emergency Switchgear Instrument Rack and Air
Conditioning Rooms Service Building Elev. 254 Ft (S-54)
Safe Shutdown Equipment
Rev. 11
Drawings
11715-FB-26F,
Sheet 1
Plumbing - Service Building Sh 6-North Anna Power Station
Units 1 & 2
Calibration
Records
1-ICP-EG-T-001J
1J Emergency Diesel Generator Thermocouple Modules
Calibration
01/26/2023
CR1218032
1J EDG Tripped on lube oil high temperature
01/25/2023
Corrective Action
Documents
CR1218100
Receive Lube Oil Temperature High Alarm during 1-PT-82J
01/26/2023
Drawings
11715-FM-107B
Valve Operating Numbers Diagram Emergency Diesel Lube
Oil System North Anna PowerStation Unit 1 Virginia Power
Rev 7
Miscellaneous
0-ICM-MIS-G-001
Repair, Replacement, or Re-installation of Components
01/26/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
1-PT-82J
1J Emergency Diesel Generator Slow Start Test
Work Orders
Thermocouple Module Calibration/Repair/Replacement
(Diesel Trip)
CA11038369
Perform MRule Functional Failure evaluation for card CD-
2 power LED light put
05/06/2022
CA11240820
Perform MRule Functional Failure evaluation for 1-HV-F-70A
found tripped with the breaker closed
09/22/2022
CA11254178
Perform MRule Functional Failure evaluation for NLP card
PQ-FW201A (CA-125) output is erratic
10/05/2022
CA11296011
Perform MRule Functional Failure evaluation for the pin
appears broke on the governor valve linkage
11/18/2022
Corrective Action
Documents
CA11358918
Terry Turbine TV (1-MS-TV-111A) did not close within
required time
01/05/2023
Engineering
Evaluations
ETE-NA-2021-
0038
Review of Routine Surveillances for Impact to Maintenance
Rule Unavailability
Rev. 0
Procedures
1-PT-214.5
Valve Inservice Inspection and Full Cycle Exercise
WO 59102647237 Actuator Diaphragm Replacement
09/24/2022
Work Orders
WO 59102647269 Actuator Diaphragm Replacement
09/24/2022
Corrective Action
Documents
CR1217626
Unit 1 UFM Alarm 1A-D6 Came in Several times Then
Cleared
01/19/2023
2-OP-31.1
Main Feedwater System
Rev. 64
Procedures
OP-NA-601
Protected Equipment
Rev. 17
Calculations
WL-128
Weak Link Report CN Report No. WL-128
Rev. 3
Operability
Evaluations
CA8587871
Charging Pump Suction MOVs Removed from JOG Program
with Insufficient Basis
Rev. 3
Calculations
CALC 59-02-PT-
14.1-06
Charging Pump 2-CH-P-1A
07/29/2011
CA8245587
Obtain and Review zonic Book Vibration Data During 2-FW-
P-3B PT
2/09/2020
CA8344984
STARTUP-trach WO 9203323996 (to status 85) for motor
replacement to document return to Full Qualifi
2/02/2021
CR1158406
2-FW-P-3B Motor Vibes High
10/15/2020
CR1176778
B Motor-Driven AFW Pump High vibes during PT
07/13/2021
Corrective Action
Documents
CR1217198
Minor Oil Seepage 1H EDG exhaust collector to turbo
01/12/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
charger control side
CR1217414
2-FW-P-3B-MOTOR has elevated vibes on MOTOR
OUTBOARD AXIAL point
01/17/2023
CR1217433
dpm Leak From Cap Below 2-FW-ICV-3330
01/17/2023
1-MOP-6.91
Emergency Diesel Generator 1-EE-EG-1J
1-OP-6.9
Slow Start and Operation of 1J Emergency Diesel Generator
1-PT-82.2B
1J Diesel Generator Test (Simulated Loss of Offsite Power)
Rev 64
OTO1
1-PT-82.9H
1H Emergency Diesel Generator Test (Local Operation)
1-PT-87.4J OTO1
Station Battery Charger 1-IV Service Testing
2-PT-14.1
Charging Pump 2-CH-P-1A
2-PT-57.1B
Emergency Core Cooling Subsystem - Low Head Safety
Injection Pump (2-SI-P-1B)
2-PT-71.3Q.1
2-FW-P-3B, Motor-Driven AFW IST Comprehensive Test
Procedures
2-PT-82.4A
2H Diesel Generator Test (Start by ESF Actuation)
Rev. 80
Work Orders
2D PT: 1-CH-P-1A (ISI)
1/10/2023
CA11275403
Engineering to review listed concern and recommend/initiate
required actions
2/14/2022
CR1207957
Non-conservative Change Made to MA-AA-105 Eliminated
50.59 Screen for Individual Scaffold Builds
09/16/2022
Corrective Action
Documents
CR1218151
01/26/2022
CFR 50.59 and 10 CFR 72.48 - Changes, Tests, and
Experiments
Rev. 17
EPIP-2.01
Notifications and Communications (With 12 Attachments)
Rev. 43
Procedures
Rev. 22