March 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 - REPORT 05000338/2012001 AND 05000339/2012001
Dear Mr. Heacock:
On February 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of North Anna Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly Performance Indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, North Anna Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at North Anna Power Station, Units 1 and 2, during the most recent quarter, was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC determined that both units were in the Regulatory Response Column for the first three quarters of the assessment period because of a White finding in Mitigating Systems cornerstone, for a failure to establish and maintain Emergency Diesel Generator (EDG)
maintenance procedures associated with the 2H EDG jacket water cooling inlet jumper gasket.
A 95001 Supplemental Inspection was completed on September 13, 2012. Based on the results of this inspection, the NRC determined the performance of North Anna Power Station, Units 1 and 2, to be in the Licensee Response Column of the ROP Action Matrix in the 4th quarter of 2012. The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
We also plan on conducting three non-ROP inspections which include: Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2, an Initial Operating License Exam, and North Anna Independent Spent Fuel Storage Installation (ISFSI), seismic corrective action inspection.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Gerald McCoy at 404-997-4551 with any questions you may have regarding this letter.
Sincerely,
/RA/
Richard P. Croteau, Director Division of Reactor Projects
Docket Nos.: 50-338, 50-339 License Nos.: NPF-4, NPF-7
Enclosure:
North Anna Inspection / Activity Plan
(03/01/2013 - 06/30/2014)
cc w/encl: See page 3 The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
We also plan on conducting three non-ROP inspections which include: Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2, an Initial Operating License Exam, and North Anna Independent Spent Fuel Storage Installation (ISFSI), seismic corrective action inspection.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4551 with any questions you may have regarding this letter.
Sincerely,
/RA/
Richard P. Croteau, Director Division of Reactor Projects
Docket Nos.: 50-338, 50-339 License Nos.: NPF-4, NPF-7
Enclosure:
North Anna Inspection / Activity Plan
(03/01/2013 - 06/30/2014)
cc w/encl: See next page X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:_________________________
X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP
SIGNATURE SON:/RA/
GJM:/RA/
NAME SNinh GMcCoy
DATE 2/27/2013 2/27/2013
E-MAIL COPY?
YES NO YES NO
OFFICIAL RECORD COPY DOCUMENT NAME:
S:\\DRP\\PERIODIC ASSESSMENTS
&
REPORTS\\EOC & MID-CYCLE\\2012\\END OF CYCLE\\INPUT\\RPB5\\NORTH ANNA\\NORTH ANNA EOC LTR 2012.DOCX cc w/encl: See page 3
Mr. Gerald T. Bischof Site Vice President North Anna Power Station Virginia Electric & Power Company Electronic Mail Distribution
Fred Mladen Director, Station Safety & Licensing Virginia Electric and Power Company Electronic Mail Distribution
Michael Crist Plant Manager North Anna Power Station Virginia Electric & Power Company Electronic Mail Distribution
Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution
Tom Huber Director, Nuclear Licensing & Operations Support Innsbrook Technical Center Electronic Mail Distribution
Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209
Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission P.O. Box 490 Mineral, VA 23117
Donald R. Taylor Licensing Supervisor North Anna Power Station P. O. Box 402 Mineral, VA 23117-0402
Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution
Executive Vice President Old Dominion Electric Cooperative Electronic Mail Distribution
County Administrator Louisa County P.O. Box 160 Louisa, VA 23093
Doug Smith President (Public Correspondence Only)
Lake Anna Civil Association Electronic Mail Distribution Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Letter to David from Richard P. Croteau dated March 4, 2013
SUBJECT:
NORTH ANNA POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000338/2013 AND 05000339/2013
Distribution w/encl:
C. Evans L. Douglas OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMNorthAnna Resource ROP assessment Institute of Nuclear Power Operations (INPO)
North Anna Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 1 03/04/2013 08:40:49 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
- NA ISFSI SEISMIC CORRECTIVE ACTION INSP 1, 2 03/04/2013 03/05/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
- PROBLEM IDENTIFICATION AND RESOLUTION 1, 2 03/11/2013 03/15/2013 IP 71152B Problem Identification and Resolution 1, 2 03/25/2013 03/29/2013 IP 71152B Problem Identification and Resolution
- UNIT 2 INSERVICE INSPECTION
04/15/2013 04/19/2013 IP 7111108P Inservice Inspection Activities - PWR
- RP PUBLIC RAD SAFETY BASELINE 1, 2 04/22/2013 04/26/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/22/2013 04/26/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 04/22/2013 04/26/2013 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 04/22/2013 04/26/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 04/22/2013 04/26/2013 IP 71151 Performance Indicator Verification
- MERGENCY PREPAREDNESS INSPECTION 1, 2 06/24/2013 06/28/2013 IP 7111402 Alert and Notification System Testing 1, 2 06/24/2013 06/28/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/24/2013 06/28/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/24/2013 06/28/2013 IP 71151 Performance Indicator Verification
- UNIT 1 INSERVICE INSPECTION
09/16/2013 09/20/2013 IP 7111108P Inservice Inspection Activities - PWR
SGISI
- UNIT 1 SG INSERVICE INSPECTION
09/23/2013 09/27/2013 IP 7111108P Inservice Inspection Activities - PWR
TI-182
- TI-182 BURIED PIPING/TANK - PHASE 2 1, 2 12/02/2013 12/04/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping
OL EXAM
- INITIAL LICENSE EXAM PREP
05/19/2014 05/23/2014 V23425 NORTH ANNA/JUNE 2014 INITIAL EXAM AT POWER FACILITIES
OL EXAM
- INITIAL LICENSE EXAM WEEK 1
06/16/2014 06/20/2014 V23425 NORTH ANNA/JUNE 2014 INITIAL EXAM AT POWER FACILITIES
OL EXAM
- INITIAL LICENSE EXAM WEEK 2
06/23/2014 06/27/2014 V23425 NORTH ANNA/JUNE 2014 INITIAL EXAM AT POWER FACILITIES Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure