MONTHYEARML20196H4081998-11-0505 November 1998 Notice of Violation from Insp on 980713-31 & 0921-25. Violation Noted:As of 980712,AFW Pipe Supports Were Not Constructed IAW Details Shown on Design Drawings as Listed ML20148B6541997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Operators Failed to Verify That Unit 1 & 2 RCPs 1 Seal Leakoffs & Unit 2 Nr 46 Nuclear Power Range Chart Recorders Were Operational ML20137F7411997-03-21021 March 1997 Notice of Violation from Insp on 970112-0222.Violation Noted:As of 970213,radiation Monitors Installed in Fuel Handling & Storage Locations,Did Not Provide Full Coverage for Area Used for New Fuel Receipt ML20133G8881997-01-0606 January 1997 Notice of Violation from Insp on 961103-1207.Violation Noted:Licensee Failed to Ensure That Safeguards Area Walls Met Design Basis for Containing Pump Seal Leakage Described in Updated Final Safety Analysis Rept Section 15.4.1.8 ML20149M5831996-12-0202 December 1996 Notice of Violation from Insp on 960922-1102.Violation Noted:Rce Had Not Been Completed for Several Pump 1-CH-P-1A Seal Failures Which Occurred Between 960211 & 0718 ML20134G7971996-10-21021 October 1996 Notice of Violation from Insp on 960811-0921.Violation Noted:Procedure for Irradiated Fuel Damage While Refueling, 0-AP-30 Inadequate ML20134C6401996-09-0909 September 1996 Notice of Violation from Insp on 960810.Violation Noted: on 940802,inadequate Maint Procedure Was Used to Control Maint Activities Affecting Quality ML20059B2521993-12-14014 December 1993 Corrected NOV from Insp on 931017-1120,including Response Instruction ML20059B2751993-12-14014 December 1993 Notice of Violation from Insp on 931017-1120.Violation Noted:On 931029,periodic Test Procedure 2-PT-82H Was Not Implemented Correctly & While Performing Step 6.4.5,operator Incorrectly Placed Control Switch Breaker in pull-to-lock ML20056E8521993-08-0505 August 1993 Notice of Violation from Insp on 930620-0717.Violation Noted:Operating Procedure 1-OP-6.5.A Not Implemented Properly,In That While Performing Step 5.3.4.e,operator Failed to Fully Open EDG Exhaust Muffler Bypass Valve ML20056D1581993-07-13013 July 1993 Notice of Violation from Insp on 930509-0619.Violation Noted:Hydrogen Analyzer Determined to Be Inoperable from 930209 to 0509 W/O Implementing Requirements of Action Statement ML20056C0891993-03-15015 March 1993 Notice of Violation from Insp on 930117-0220.Violation Noted:Outer Personnel Airlock Door Emergency Escape Hatch Equalizing Valve Was Not Closed on 930116-17,while Inner Personnel Airlock Door Was Open ML20059K8041990-09-11011 September 1990 Notice of Violation from Insp on 900718-0818.Violation Noted:Equipment Control & Maint Procedures Failed to Adequately Control Removal of High Head Safety Injection Pump Cubicle Blocks ML20248B4901989-09-21021 September 1989 Notice of Violation from Insp on 890715-0822.Violation Noted:Surveillance Procedures 2-PT-36.5.3A & 3B, Ssps Output Slave Relay Trains A&B, Did Not Correctly Detail Interlock Conditions for Energization of K630 Relay ML20247D5391989-07-17017 July 1989 Notice of Violation from Insp on 890412-14 & 20-26.Violation Noted:Applied Pressure in Tests of Containment Isolation Valves Not in Same Direction as That When Valve Would Be Required to Perform Safety Function ML20246J9081989-06-29029 June 1989 Notice of Violation from Insp on 890418-0531.Violation Noted:Failure to Adequately Control Location of Fuel Assemblies During Fuel Movement Operations & Failure to Adequately Control Maint Operations ML20245D5271989-06-20020 June 1989 Notice of Violation from Insp on 890403-07.Violation Noted: Failure to Identify Conditions Adverse to Quality,Including Failure to Clean Main Control Panel & Terminal Block Section for Extended Period of Time,Resulting in Buildup of Dust ML20245D3451989-06-15015 June 1989 Notice of Violation from Insp on 890501-05.Violation Noted: Failure to Perform Adequate Surveys to Evaluate Extent of Radiation Hazards Present During Described 890409 & 0501 Cases ML20244E5521989-06-0909 June 1989 Notice of Violation from Insp on 890515-19.Violations Noted: on 890516,seven Film Packages in Feedwater Sys Had Incorrect Line Identification Permanently Radiographed on Films & on 890517,employee Observed Sleeping on Firewatch Duty ML20244E2461989-06-0707 June 1989 Notice of Violation from Insp on 890418-20.Violations Noted: Failure to Perform weld-repair in Accordance W/Asme Code Section IX Requirements & Failure to Establish Measures for Control & Identification Matls to Prevent Misapplication ML20244B8081989-05-17017 May 1989 Notice of Violation from Insp on 890321-0417 & 0425-0503. Violation Noted:Failure of Volt Breaker for Recirculation Spray Pump to Close within Allowed Tech Spec Time.All Capped Vent & Drain Valves Not Verified Closed Every 31 Days ML20246J3301989-04-21021 April 1989 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000.Violations Noted:Failure to Implement Portion of QA Program in That Conditions Adverse to Quality Not Promptly Identified & Corrected ML20245C4841989-04-18018 April 1989 Notice of Violation from Insp on 890203-0320.Violation Noted:Adequate Corrective Actions Not Taken to Preclude Repetition of Erratic Response by Condenser Air Ejector Radiation Monitor & Svc Water Valve Found in Open Position ML20245C0061989-04-17017 April 1989 Notice of Violation from Insp on 890320-24.Violations Noted: Unit 1 Auxiliary Bldg Piping Penetration Room,Posted High Radiation Area,Lacked Radiation Monitoring Device or Health Physics Coverage ML20155C2131988-09-26026 September 1988 Notice of Violation from Insp on 880815-19.Violations Noted:During Augmentation Callout Drill,Personnel Obtained & Used Outdated Revs of Telephone Directory & Personnel Could Not Meet 30-minute Response Requirement ML20155A1861988-09-15015 September 1988 Notice of Violation from Insp on 880716-0819.Violation Noted:Licensee Had Not Documented Wet Bulb Temp or Caculated Stay Time for Containment Entries Made on 880808 & 09 ML20154J3971988-09-13013 September 1988 Notice of Violation from Insp on 880718-22.Violation Noted: Solenoid Operated Valves Relocated W/O Initiating Rev to Plant post-fire Safe Shutdown Procedures Due to Failure to Perform Adequate Evaluation Per App R Design Guidelines ML20207G3511988-08-17017 August 1988 Notice of Violation from Insp on 880514-0610.Violation Noted:Both Diesel Generators Inoperable for Over 38 H on 880518-19,while Preventive Maint Performed on One Diesel Generator ML20151W7361988-08-10010 August 1988 Notice of Violation from Insp on 880606-10.Violation Noted: Failure to Perform Adequate Contamination Surveys of Equipment for Unrestricted Use ML20151H0321988-07-15015 July 1988 Notice of Violation from Insp on 880328-0401 & 0411-15. Violations Noted:Failure to Follow Procedures,In That All Operator Aids Not Surveyed for First,Second & Fourth Quarters of 1987 & First Quarter 1988 ML20155H3911988-05-26026 May 1988 Notice of Violation from Insp on 880125-29 & 0208-12. Violations Noted:Stroke Times for Listed Tech Spec Valves Increased by More than Section XI Limits of 25% or 50% W/O Corrective Action or Increased Test Frequency ML20153G6571988-05-0404 May 1988 Notice of Violation from Insp on 880224-0405.Violation Noted:Unit 1 Entered Mode 1 W/Nine Containment Isolation Valves Not Stroke Time Tested Following Maint ML20151V3571988-04-19019 April 1988 Notice of Violation from Insp on 871005-09.Violations Noted: Licensee Maint Procedures Deficient & Raychem Splices & Motors MOV-SW-103B,103C,104A,104B,104C,203C,213A,MOV 2350 & MOV 2890A Not in Compliance w/10CFR50.49(f) ML20151B4891988-03-31031 March 1988 Notice of Violation from Insp on 880116-0223.Violations Noted:Rcs Level Sandpipe Scale Installed W/O Procedural Guidance & Verification to Ensure Proper Installation & Failure to Follow Maint Procedure Resulted in RCS Leak ML20148E8751988-03-14014 March 1988 Notice of Violation from Insp on 880125-29 & 0208-12. Violation Noted:Failure to Adequately Implement Inservice Testing Program & Failure to Coduct Adequate Audits. Unresolved Item Noted Re Entry Into High Radiation Areas ML20151B8451988-03-0808 March 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Noncompliance Noted:Unit 2 Operated in Modes 1-3 with Inoperable Steam Flow Channel in Steam Lines a & B & Failure to Perform post-maint Test ML20149E5961988-01-15015 January 1988 Notice of Violation from Insp on 871120-1218.Violation Noted:Failure to Follow Radiation Work Permit Requirements of Health Physics Procedure 5.3.20 & Failure to Properly Implement post-maint Testing ML20195H1731988-01-0606 January 1988 Notice of Violation from Insp on 881019-23.Violations Noted: Fire Brigade Drill Requirements Not Implemented When All Shift Fire Brigades Failed to Participated in One Drill Per Quarter as Required by Fire Protection Program IR 07100020/20110191988-01-0404 January 1988 Notice of Violation from Insp on 871020-1119.Violations Noted:Emergency Diesel Generator 2J Electrically Overloaded Due to Inadequate Surveillance Procedure & Failure to Follow Procedures ML20236F9851987-10-26026 October 1987 Notice of Violation from Insp on 870825-27.Violations Noted: Individual Received Occupational Dose of 23.6 Rems to Skin of Whole Body Exceeding 1 Calendar Quarter Requirement,Per 10CFR20.101(a) & Whole Body Survey Not Performed ML20235U8321987-10-0505 October 1987 Notice of Violation from Insp on 870715-0814.Violations Noted:Health Physics Not Notified When Alarm Received on 870715,evaluations of Abnormal Conditions Not Performed & Dailu Channel & Monthly Source Checks Not Performed ML20235F9921987-09-23023 September 1987 Notice of Violation from Insp on 870817-21.Violation Noted: NRC Inspector,While Inspecting Sample of Terminations, Noticed That Three Terminations Damaged by short-circuit That Had Occurred in Past ML20237L1491987-08-18018 August 1987 Notice of Violation from Insp on 870621-0710.Violation Noted:Licensee Attempted to Perform Evolution W/Intent of Drawing Vacuum in Pressurizer W/O Procedure ML20236B2131987-07-21021 July 1987 Notice of Violation from Insp on 870504-0605.Violation Noted:Control Over safety-related Matls,Including Welding Consumables,Not Maintained ML20234D6861987-06-29029 June 1987 Notice of Violation from Insp on 870513-0616 ML20215L5751987-06-17017 June 1987 Notice of Violation from Insp on 870518 & 20-21 ML20215A4191987-05-28028 May 1987 Notice of Violation from Insp on 870511-15 ML20210A1841987-01-29029 January 1987 Notice of Violation from Insp on 861117-870111 ML20212C1011986-12-19019 December 1986 Notice of Violation from Insp on 861117-21 ML20215C4641986-12-0404 December 1986 Notice of Violation from Insp on 861013-1117 1998-11-05
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4081998-11-0505 November 1998 Notice of Violation from Insp on 980713-31 & 0921-25. Violation Noted:As of 980712,AFW Pipe Supports Were Not Constructed IAW Details Shown on Design Drawings as Listed ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance ML20155B0671998-10-0202 October 1998 NRC Operator Licensing Exam Repts 50-338/98-301 & 50-339/98-301 (Including Completed & Graded Tests) for Tests Administered on 980817-21 & 31-0903 IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20148B6541997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Operators Failed to Verify That Unit 1 & 2 RCPs 1 Seal Leakoffs & Unit 2 Nr 46 Nuclear Power Range Chart Recorders Were Operational IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7411997-03-21021 March 1997 Notice of Violation from Insp on 970112-0222.Violation Noted:As of 970213,radiation Monitors Installed in Fuel Handling & Storage Locations,Did Not Provide Full Coverage for Area Used for New Fuel Receipt ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970991997-02-21021 February 1997 SALP Repts 50-338/97-99 & 50-339/97-99 for 941225-970111 IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20133G8881997-01-0606 January 1997 Notice of Violation from Insp on 961103-1207.Violation Noted:Licensee Failed to Ensure That Safeguards Area Walls Met Design Basis for Containing Pump Seal Leakage Described in Updated Final Safety Analysis Rept Section 15.4.1.8 ML20133C9491996-12-27027 December 1996 EN-96-098:order Prohibiting Involvement in NRC Licensed Activities Will Be Issued on or About 970102 to Unlicensed Individual Formerly Employed as Contract Millwright.State of VA Will Be Notified ML20149M5831996-12-0202 December 1996 Notice of Violation from Insp on 960922-1102.Violation Noted:Rce Had Not Been Completed for Several Pump 1-CH-P-1A Seal Failures Which Occurred Between 960211 & 0718 IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support PNO-II-96-081, on 961112,Unit 2 Experienced Turbine Generator Trip from 100% Power.Investigation Into Cause of Turbine Generator Trip Revealed Ground Fault on Main Generator Stator Phase a Windings.Addl Followup Will Be Performed1996-11-13013 November 1996 PNO-II-96-081:on 961112,Unit 2 Experienced Turbine Generator Trip from 100% Power.Investigation Into Cause of Turbine Generator Trip Revealed Ground Fault on Main Generator Stator Phase a Windings.Addl Followup Will Be Performed ML20134G7971996-10-21021 October 1996 Notice of Violation from Insp on 960811-0921.Violation Noted:Procedure for Irradiated Fuel Damage While Refueling, 0-AP-30 Inadequate ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr ML20134C6401996-09-0909 September 1996 Notice of Violation from Insp on 960810.Violation Noted: on 940802,inadequate Maint Procedure Was Used to Control Maint Activities Affecting Quality IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059L0511994-01-0404 January 1994 EN-94-001:on 940107,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $15,000 Will Be Issued.Action Based on Two Previous Similar Severity Level IV Violations Issued on 901207 & 920515 ML20059B2521993-12-14014 December 1993 Corrected NOV from Insp on 931017-1120,including Response Instruction ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation ML20059B2751993-12-14014 December 1993 Notice of Violation from Insp on 931017-1120.Violation Noted:On 931029,periodic Test Procedure 2-PT-82H Was Not Implemented Correctly & While Performing Step 6.4.5,operator Incorrectly Placed Control Switch Breaker in pull-to-lock IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19933011993-11-12012 November 1993 Exam Rept 50-338/93-301 on 931008-15.Exam Results:Eight ROs & Six SROs Passed Written & Operating Exams.Exam for Both Units IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19933001993-10-20020 October 1993 Exam Repts 50-338/93-300 & 50-339/93-300 on 930825-0910 & 930921-24.Exam Results:Six SROs & Five ROs Received Written & Operating Exams.All Operators Passed Exams IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8521993-08-0505 August 1993 Notice of Violation from Insp on 930620-0717.Violation Noted:Operating Procedure 1-OP-6.5.A Not Implemented Properly,In That While Performing Step 5.3.4.e,operator Failed to Fully Open EDG Exhaust Muffler Bypass Valve ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1581993-07-13013 July 1993 Notice of Violation from Insp on 930509-0619.Violation Noted:Hydrogen Analyzer Determined to Be Inoperable from 930209 to 0509 W/O Implementing Requirements of Action Statement 1999-07-02
[Table view] |
Text
. . . _ _ ..
NOTICE OF VIOLATION Virginia Electric and Power Company Docket Nos. 50-338,50-339 North Anna Nuclear Plant License Nos. NPF-4, NPF-7 During an NRC inspection conducted at your North Anna facility, on July 13 through 31,1998, violations of NRC requirements were identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violations are listed below:
A. 10 CFR 50, Appendix B, Criterion V requires that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, i procedures, or drawings. The requirements for construction of safety related pipe supports were specified in the applicable Stone and Webster drawings, which showed required weld sizes and support configuration.
Contrary to the above, as of July 12,1998, AFW pipe supports were not constructed in accordance with details shown on the design drawings as specified below:
- 1. Drawing (Sketch) number MFSK-4289A-3 required 1/4" fillet welds on connections between steel members (angles or angles and wide flanges) for the upper box frames and Detail T box frame for pipe support SHP-R-187. The as-built weld sizes were measured as 1/8" or 3/16" at numerous locations on these l members. ;
1
- 2. Drawing (Sketch) number 7054 required 1/4" fillet welds on connections between I steel angle members for the three box members for the 3 inch diameter pipes on pipe support numbers SHP-R-188 and 189. The as-built welds were determined to be 1/8" at several locations at the top of the box frames.
- 3. Drawing (sketch) number 2-4233 required 1/4" fillet welds on connections between bill of materials (BOM) items 4 and 5 on pipe support 2SHP-R-34. The vertical weld at top, left connection measured 3/16". I
- 4. Drawing number 12050 ZFSK-2536A-2 required 5/16" fillet welds at connections of 4x4 tube steel posts to surface mounted plates attached to the tunnel ceiling on support 2SHP-R-15. The welds on the right side of left post and front and left i sides of the right post measured 1/4". j
- 5. Drawing number 11715-PSSK-102FA.3 required 1/4"" fillet welds at the l connection of BOM item 1 (6" wide flange) to base plate on pipe support 1-WAPD-R-198. The weld on the top web at right connection measured 3/16". I i
l Enclosure 1 9812090063 981105 PDR ADOCK 0500033G PM G
NOV 2
- 6. Drawing number 11715-PSSK-102FD.1 required 1/4" fillet welds at the connection of BOM items 2 (6" wide flanges) to the baseplate on pipe support 1-WAPD-R-22. The welds on the bottom and sides of the top wide flange measured 3/16". The drawing also specified no gap (a zero inch gap) at the bottom of the 6" inch diameter pipe. A gap existed.
- 7. Drawing number 11715-PSSK-102FD.4 required 1/4" fillet welds between BOM item 5 (stiffener plates) and the baseplate on pipe support 1-WAPD-A-18. The welds measured 3/16".
- 8. Drawing number 11715-PSSK-102FD.3 required 1/4" fillet welds for connection of BOM items 8 (steel angles) to BOM item 1 (wide flanges) per Section 1-1 and for connection of BOM item 9 (stiffener plate) to BOM item 6 (baseplate) on pipe support 1-WAPD-R-24. The welds measured 3/16" at right side of BOM item 9 i and on right and left sides of BOM item 8. 1 This is a Severity Level IV violation (Supplement 1)
B. 10 CFR 50, Appendix B, Criterion XVI, requires that measures shall be established to assure that conditions adverse to quality shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected.
l Virginia Power procedure VPAP-1601, Corrective Action, implements the requirements of 10 CFR 50, Appendix B, Criterion XVI, at the North Anna Power Station. Paragraph 6.3.3.a and 6.3.3.b of VPAP-1601 requires that corrective action be implemented in :
accordance with approved procedures, and verification of timely and proper corrective action measures.
Contrary to the above, corrective actions to resolve the AFW pipe support corrosion problems identified on September 29,1996, and documented in Deviation Report N 96- l 2135, were not effective. As of July 19,1998, the licensee failed to perform verification of timely and proper corrective actions performed to close DR N 96-2135. As a result, additional corrosion of the Unit 2 AFW tunnel pipe supports had occurred, resulting in potential operability concerns.
This is a Severity Level IV violation (Supplement I) applicable to Unit 2 only.
C. 10 CFR 50.55a(g) requires performance of inservice inspection of Class 1,2, and 3 pipe supports in accordance with ASME Section XI.
Contrary to the above, as of July 15,1998,10 Unit 1 and 39 Unit 2 Class 3 AFW system pipe supports were not included in the ASME Section XI inservice inspection program.
This is a Severity Level IV violation (Supplement 1).
Enclosure 1 l
t b 5
4 NOV 3 Regarding Violation A, pursuant to the provisions of 10 CFR 2.201, Virginal Electric and Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear l Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555, with a copy to the Regional Admini-strator, Region 11, and a copy to the NRC Resident inspector at North Anna, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This j
reply should be clearly marked as a " Reply to a Notice of Violation" and should include for j Violation A: (1) the reason for the violation, or, if contested, the basis for disputing the violation ;
or severity level, (2) the corrective steps that have been taken and the results achieved, (3) the !
j corrective steps that will be taken to avoid further violations, and (4) the date when full
! compliance will be achieved. Your response may reference or include previously docketed correspondence, if the correspondence adequately addresses the required response. Where 4
good cause is shown, consideration will be given to extending the response time. ;
j '
If you contest this enforcement action, you should also provide a copy of your response to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, j D.C. 20555-0001.
4 Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an adequate response, please provide the level of protection described in 10 CFR 73.21.
I Regarding Violations B and C, the NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence and the date when full compliance will be achieved will be adequately addressed on the docket in Inspection Report No. 50-338/98-05. However, you are required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to respond, follow the instructions for Violation A.
l Dated at Atlanta, Georgia this 5* day of November,1998 Enclosure 1 l 1