MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20205C7241985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20134F6881985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program. ML20042F1441989-12-31031 December 1989 New York Power Authority Annual Rept for 1989. W/900430 Ltr ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20151N7881988-07-31031 July 1988 Rev 1 to Charpy Toughness & Brittle Transition Temp Characterization of HAZ High Hardness Zone of Indian Point Unit 2 Steam Generator Girth Weld by Gleeble Weld Thermal Cycle Simulation ML20006B4741988-05-31031 May 1988 Nonproprietary Indian Point Unit 2 Evaluation for Tube Vibration Induced Fatigue. ML20151N7821988-05-31031 May 1988 Fracture Sensitivity Study of Girth Weld 6 Repaired Configuration,Indian Point Unit 2 ML20153F9161988-04-28028 April 1988 Changes,Tests & Experiments - 1986 ML20151T4681988-01-31031 January 1988 Experimental & Finite Element Evaluation of Spent Fuel Rack Damping & Stiffness 1999-02-09
[Table view] |
Text
. . . . . - -. - _ _ . _
- w. -
OPERATING DATA REPORT DOCKET NO. 50-286 DATE Anr 1- 1984 COMPLETED BY L- Ke11v TELEPHONE (914) 739-8200 OPERATING STATUS Notes
- 1. Unit Name:. Indian Point No. 3 Nuclear Power Plant
- 2. Reporting Period: March 1984
- 3. Licensed Thermal Power (MWt): 3025
- 4. Nameplate Rating (Gross MWe): 1013
- 5. Design Electrical Rating (Net MWe): 965 i 6. Maximum Dependable Capacity (Gross MWe): 1000
- 7. Maximum Dependable Capacity (Net .MWe): 965
- 8. If Changes Occur in Capacity Ratingi(Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr. to.Date Cumulative
- 11. Hours In Reporting Period 744 2184.0 66,505 736.3 1489.4 35,913.9
- 12. Number Of Hours Reactor Was Critical U 0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 723.2 1391.1 34,533.1 I !$. Unit Reserve Shutdown Hours 0 0 0 l 16. Gross Thermal Energy Generated (MWH) 2,058,008 3,601,249 90,026,894 684,050 1,166,715 27,533^,325
! 17. Cross Electrical Energy Generated (MWH) 658,648 1,119,099 26,363,277 l 18. Net Electrical Energy Generated (MWH)
- 19. ' Unit Service Factor 97.2 63.7 51.9 ,
- 20. Unit Availability Factor . 97.2 63.7 51.9 ,
91.7 53.1 41.1 21.~ Unit Capacity Factor (Using MDC Net) 91.7 53.1 41.1
- 22. Unit Capacity Factor (Using DER Net) a 36.1 24.1
- 23. Unit Forced Outage Rate l 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
l l
l 25 ' If Shut Down At End Of Report Period. Estimated Date of Startup: _
l 26 Units In Test Status tPrior to Commercial Operation): Forecast Achieved I INITIAL CRITICALITY l INITIA L ELECTRICITY -
COMMERCIAL OPERATION ' .
8404170138 840331 PDR ADOCK 05000286 i
R -
PDR . . . . , -. --
AVERAGE DAILY UNIT POWER LfVEL DOCKET NO. 50-286 Indian Point l UNIT No. 3 l DATE 04/01/84 1
COMPLETED BY L. Keliv .__
TELEPHONE (914) 739-8200 MONTH March 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) iMWe-Net)
I 926 ,
17 ono 2 925 18 786 3 928 19 915 4 930 20 929 5 928 21 930 6 930 929 22 7 o1n 23 olo 8 923 24 929 9 307 25 o99 10 422 26 920 11 925 27 o,,
l l 12 924 28 929 13 429 29 017 14 924 30 491
[ I5 931 31 923 16 928 INSTRUCTIONS .
On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt. E (9/77) 4
DOCKE1NO. 0 - 2 H 6 -
UNIT SilUTDOWNS /.ND POWER REDUCTIONS NO- 3 UNIT NAME DATE 4/'/84 COMPLETED BY L- KellV REPORT MONT11 March El.EPflONE 914-739-8200 c
.E g 'h jY3 Licensee 5, t Cause & Corrective No. Date s
g 3g s
s _g s & Event g,? {3 gO Action to Q :~z: $ t= l .;nort # mV o Present Recurrence 2 " =! U 6 l, l
l 05 840309 F 20.8 A 3 84-006-00 IA CKTBRK A Trip due to Bypass Breaker B cell switch contact malfunction while
( performing Reactor Protection Train B l Test (3PT-M13B) l f f al f
I 2 3 4 F: Forced Reason: Method: Exhibit F-Instsuctions S: Scheduled A Equipment Failure (Explain) I-Manual for Pieparation of Data B-Maintenance of Test 2-Manual Scram. Entiy Sheets foi 1.scensee C-Refueling 3- Automatic Scram. livent Repois (1.l Ril ale (NllRI:G-D-Regulatory Rest iction 4 Olher (Explain) Ol(il l li-Operator Tiaining & License lixamination F-Administrative 5 G4hwrational Ee ror (Explain) 1:stubit 11- Same Somcc 19/77) 11-01her (Explain)
MONTHLY MAINTENANCE REPORT March 1984 .,
MONTH WR# DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4244 '3/01/84 Charging Pump #31 Seal leak Repacked seals 4146 3/02/84 Steam Generator #34 Improper indication Adjusted limit switches Blow.Down Valves in control room PCV-1217, PCV-1217A 4184 3/02/84 Charging Pump #31 Erratic discharge Replaced valve assembly Discharge Valve pressure 4215 3/02/84 Waste Gas Compressor Control bellows Replaced bellows and
- 32 Recirculation Valve inoperative controller 4241 3/09/84 Component Cooling Inboard Pump seal Replaced mechanical seal Pump #33L leaks 4262 3/12/84 Steam Generator #33 Valve diaphragm ruptured Replaced diaphragm Blow Down Valve PCV-1216A '
3633 3/16/84 Fuel Storage Building Crane Aux. hoist inoperative Replaced electrical contacts 4228 3/16/84 Steam Generator #33 Valve does not open fully Repaired opening solenoid Blow Down Valve PCV-1216A valve fittings 4229 3/16/84 Steam Generator #34 Improper remote position Replaced limit switch Blow Down Valve PCV-1217 indication 4312 3/28/84 Control Room Thermostat inoperative Replaced thermostat Air Conditioner 4323 3/28/84 Accumulator Discharge Valve leaks Adjusted packing nut Valve 894C
. .., I.
N O
4 I 8 H T 9 T C 1 N A O
h M E c V r I a T M C E
R R
O C
4 T
.R N O O P I E T R C .
N
.C U F
& L A
.I M 9 Y
L
.H T
N O
M T
N E
M P
. I U
Q E
E T
A t D r o
p e
r o
t g
n i
h f t R o _
'z.
M N ,
y J
W 4
m
. .O
SUMMARY
OF OPERATIVE EXPERIENCE MARCH 1984 Indian Point Unit 3 was synchronized to the bus for a total of 723.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, providing a gross generation of 684,050 Mwe for this reporting period.
On March 9, at 0832 hours0.00963 days <br />0.231 hours <br />0.00138 weeks <br />3.16576e-4 months <br />, a turbine trip was initiated during monthly Reactor Protection System (RPS). testing. The cause for the turbine trip was found to be the inadvertent closure of a cell switch associated with Reactor Trip Bypass Breaker No. 52/BYB. Investigation determined that a misaligned catch plate in the breaker cubicle assembly led to the closure of the cell switch during testing. After the catch was realigned and the breaker was tested, the unit was returned to service at 0250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> on March 10.
i
' Indian Point 3 .
.* Nuclear Power Plant
! . P.O. Box 215 Buchanan, New Wrk 10511 914 739.8200
- > NewYorkPbwer
& Authority April 13, 1984 IP-LK-2048 Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk
Dear Sir:
. Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of March, 1984.
V truly ur ,
L y h S C.
John C. Brons Resident Manager LK/ ban Enclosures (12 Copies) cc: Dr. Thomas E. Murley, Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office l George Wilverding (SRC), WP0 J. P. Bayne, WP0 S. V. Fuller, NYO W. R. Yario, NYO s