Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20202G4211998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198L6191997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20203F6391997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198T4151997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Jm Farley Nuclear Plant ML20211N7221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20216J3151997-08-31031 August 1997 Monthly Operating Repts for August 1997 for Jfnp ML20210K5981997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20141H3191997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Joseph M Farley Nuclear Plant Units 1 & 2 ML20148K6081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Joseph M Farley Nuclear Plant ML20141E3121997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20137T1841997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20136G4731997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Jm Farley Plant Units 1 & 2 ML20138K5881997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20133F4791996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20132C0631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20134K7141996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20128Q1161996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Jm Farley Nuclear Plant,Units 1 & 2 ML20117M1291996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20115D6821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20117M2721996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20111D1401996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Jm Farley Plant Units 1 & 2 ML20101R6271996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Jm Farley Nuclear Plant ML20106H0791996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Jm Farley Nuclear Plant ML20097D5651996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Jm Farley Nuclear Plant ML20096C0921995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Jm Farley Nuclear Plant Units 1 & 2 ML20095E9451995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Joseph M Farley Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P0761999-10-0606 October 1999 Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
,,.......
, . , - , .. D:vi + ry Southern Nuclear Mce Pi..,. ..st Operating Company
, farky Pruject R0. Bcx 1295 Birmingham. Alabama 35201 Tel 205.992.5131 July 13, 1999 SOUTHERN h Docket Nos.: 50-348 COMFANY 50 364 '""E'" '* Y'" #" #
NEL-99-0267 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the June 1999 Monthly Operating Reports for Joseph M. Fr.rley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you .'iave any questions, please advise.
Respectfully submitted, Dave Morey RWC:mor
Enclosures:
- 1. June Monthly Operating Report for Plant Farley Unit 1
- 2. June Monthly Operating Report for Plant Farley Unit 2
/ lk g g 71 g g g ,-
PDR
c e
- Page 2
.U. S. Nuclear Regulatory Commission ec: Southern uclear Operating Company Mr. L. M. Stinson, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
I Mr. L. M. Padovan, Licensing Project Manager- Farley .
U. S. Nuclear -Regulatory Commission, Region 11 Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident inspector- Farley I
l t:- !
OPERATING DATA REPORT DOCKET NO.: 50-348 UNIT NAME: J. M. Farlet- Unit 1 DATE: July 8,1999 COMPLETED BY: W. L. Marlar TELEPHONE: ('>34) 814-4554 OPERATING. STATUS
- 1. Reporting Period: JUNE 1999
- 2. Design Electrical Rating (Net MWe): 854
- 3. Maximum Dependable Capacity (Net MWe): 847 This3fonth YeattoDate Cumulative i
- 4. Number Of Hours Reactor Was Critical: 720.0 4,305.2 153.208.4
- 5. Hours Generator On-line: 720.0 4,278.6 151,038.3
- 6. Unit L.; serve Shutdown Hours: 0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWH): 600,920.0 3,538,233.0 119,072,550.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SA FETY VALVES Date i Tag No. i hvent Description There were re challenges to Pressurizer PORV or Pressurizer Safety Valves.
)
i El-1
\ .-
, UNIT SHUTDOWNS DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: July 8,1999 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JUNE 1999 TELEPHONE: (334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date S: Scheduled , (Hours) (1) (2) Comments
- I There were no unit shutdowns during the month.
I gi) au A w N. g) MLilluu.
A Equipment Failure (Explain) 1 Manual D - Maintenance or Test 2 ManualTrip/ Scram C - Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E Operator Training / License Examination 5 -Other (Explain)
F Administrative G OperationalError(Explain)
II- Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT On 990619 at 0702, Unit I was ramped down to 95% power for Steam Dump Testing. The Unit was returned to 100% power on 990619 at 2000.
I I
El-2 l
l I
J
' ' ' ~
OPERATING DATA REPORT F DOCKET NO.: 50-364 UNIT NAME: J. M. Farley Unit 2 DATE: July 8,1999 COMPLETED BY: W. L Marlar TELEPilONE: (334) 814-4554 _ _
OPERATING STATUS
- 1. Reporting Period: JUNE 1999
- 2. Design Electrical Rating (Net MWe): .
855
- 3. Maximum Dependable Capacity (Net MWe): 852 This_ Month Yeatto Date Cumulative
- 4. Number Of Hours Reactor Was Critical: 662.4 4,285.4 136,753.8
- 5. Hours Generator On-line: 650.2 4,273.2 134,918.6
- 6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWH): 530,406.0 3,098,662.0 107,197,948.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l
Date i Tag No, i Event Description '
There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
E2-1
- UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: _
July 8,1999 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JUNEl999 TELEPiiONE: (334) 814-4554 l
Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions l No. Date S: Scheduled (Ilours) (1) (2) Comments )
1 99 % 12 F 69.8 A 2 SEE BELOW i
{
)
1 (1) KLASUN. 4) MW HUU. j A - Equipment Failure (Explain) 1 - Manual i
!!- Maintenance or Test 2 ManualTrip/ scram C Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 -other (Explain)
F Administrative ;
o operational Error (Explain)
II other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT Unit 2 was manuaFy tripped on 06-12-99 because of decreasing Condenser Vacuum. The loss of vacuum was later found to se caused by a broken steam dump drain line.
The broken section ofline was replaced and the unit was restarted and connected to the grid at 1937 on 6-15-99.
E2-2
Text
,,.......
, . , - , .. D:vi + ry Southern Nuclear Mce Pi..,. ..st Operating Company
, farky Pruject R0. Bcx 1295 Birmingham. Alabama 35201 Tel 205.992.5131 July 13, 1999 SOUTHERN h Docket Nos.: 50-348 COMFANY 50 364 '""E'" '* Y'" #" #
NEL-99-0267 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the June 1999 Monthly Operating Reports for Joseph M. Fr.rley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you .'iave any questions, please advise.
Respectfully submitted, Dave Morey RWC:mor
Enclosures:
- 1. June Monthly Operating Report for Plant Farley Unit 1
- 2. June Monthly Operating Report for Plant Farley Unit 2
/ lk g g 71 g g g ,-
PDR
c e
- Page 2
.U. S. Nuclear Regulatory Commission ec: Southern uclear Operating Company Mr. L. M. Stinson, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
I Mr. L. M. Padovan, Licensing Project Manager- Farley .
U. S. Nuclear -Regulatory Commission, Region 11 Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident inspector- Farley I
l t:- !
OPERATING DATA REPORT DOCKET NO.: 50-348 UNIT NAME: J. M. Farlet- Unit 1 DATE: July 8,1999 COMPLETED BY: W. L. Marlar TELEPHONE: ('>34) 814-4554 OPERATING. STATUS
- 1. Reporting Period: JUNE 1999
- 2. Design Electrical Rating (Net MWe): 854
- 3. Maximum Dependable Capacity (Net MWe): 847 This3fonth YeattoDate Cumulative i
- 4. Number Of Hours Reactor Was Critical: 720.0 4,305.2 153.208.4
- 5. Hours Generator On-line: 720.0 4,278.6 151,038.3
- 6. Unit L.; serve Shutdown Hours: 0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWH): 600,920.0 3,538,233.0 119,072,550.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SA FETY VALVES Date i Tag No. i hvent Description There were re challenges to Pressurizer PORV or Pressurizer Safety Valves.
)
i El-1
\ .-
, UNIT SHUTDOWNS DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: July 8,1999 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JUNE 1999 TELEPHONE: (334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date S: Scheduled , (Hours) (1) (2) Comments
- I There were no unit shutdowns during the month.
I gi) au A w N. g) MLilluu.
A Equipment Failure (Explain) 1 Manual D - Maintenance or Test 2 ManualTrip/ Scram C - Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E Operator Training / License Examination 5 -Other (Explain)
F Administrative G OperationalError(Explain)
II- Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT On 990619 at 0702, Unit I was ramped down to 95% power for Steam Dump Testing. The Unit was returned to 100% power on 990619 at 2000.
I I
El-2 l
l I
J
' ' ' ~
OPERATING DATA REPORT F DOCKET NO.: 50-364 UNIT NAME: J. M. Farley Unit 2 DATE: July 8,1999 COMPLETED BY: W. L Marlar TELEPilONE: (334) 814-4554 _ _
OPERATING STATUS
- 1. Reporting Period: JUNE 1999
- 2. Design Electrical Rating (Net MWe): .
855
- 3. Maximum Dependable Capacity (Net MWe): 852 This_ Month Yeatto Date Cumulative
- 4. Number Of Hours Reactor Was Critical: 662.4 4,285.4 136,753.8
- 5. Hours Generator On-line: 650.2 4,273.2 134,918.6
- 6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWH): 530,406.0 3,098,662.0 107,197,948.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l
Date i Tag No, i Event Description '
There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
E2-1
- UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: _
July 8,1999 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JUNEl999 TELEPiiONE: (334) 814-4554 l
Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions l No. Date S: Scheduled (Ilours) (1) (2) Comments )
1 99 % 12 F 69.8 A 2 SEE BELOW i
{
)
1 (1) KLASUN. 4) MW HUU. j A - Equipment Failure (Explain) 1 - Manual i
!!- Maintenance or Test 2 ManualTrip/ scram C Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 -other (Explain)
F Administrative ;
o operational Error (Explain)
II other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT Unit 2 was manuaFy tripped on 06-12-99 because of decreasing Condenser Vacuum. The loss of vacuum was later found to se caused by a broken steam dump drain line.
The broken section ofline was replaced and the unit was restarted and connected to the grid at 1937 on 6-15-99.
E2-2