L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With

From kanterella
(Redirected from L-99-267)
Jump to navigation Jump to search
Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20209G066
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/30/1999
From: Marlar W, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NEL-99-0267, NEL-99-267, NUDOCS 9907190009
Download: ML20209G066 (6)


Text

,,.......

, . , - , .. D:vi + ry Southern Nuclear Mce Pi..,. ..st Operating Company

, farky Pruject R0. Bcx 1295 Birmingham. Alabama 35201 Tel 205.992.5131 July 13, 1999 SOUTHERN h Docket Nos.: 50-348 COMFANY 50 364 '""E'" '* Y'" #" #

NEL-99-0267 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the June 1999 Monthly Operating Reports for Joseph M. Fr.rley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you .'iave any questions, please advise.

Respectfully submitted, Dave Morey RWC:mor

Enclosures:

1. June Monthly Operating Report for Plant Farley Unit 1
2. June Monthly Operating Report for Plant Farley Unit 2

/ lk g g 71 g g g ,-

PDR

c e

- Page 2

.U. S. Nuclear Regulatory Commission ec: Southern uclear Operating Company Mr. L. M. Stinson, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.

I Mr. L. M. Padovan, Licensing Project Manager- Farley .

U. S. Nuclear -Regulatory Commission, Region 11 Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident inspector- Farley I

l t:-  !

OPERATING DATA REPORT DOCKET NO.: 50-348 UNIT NAME: J. M. Farlet- Unit 1 DATE: July 8,1999 COMPLETED BY: W. L. Marlar TELEPHONE: ('>34) 814-4554 OPERATING. STATUS

1. Reporting Period: JUNE 1999
2. Design Electrical Rating (Net MWe): 854
3. Maximum Dependable Capacity (Net MWe): 847 This3fonth YeattoDate Cumulative i
4. Number Of Hours Reactor Was Critical: 720.0 4,305.2 153.208.4
5. Hours Generator On-line: 720.0 4,278.6 151,038.3
6. Unit L.; serve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 600,920.0 3,538,233.0 119,072,550.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SA FETY VALVES Date i Tag No. i hvent Description There were re challenges to Pressurizer PORV or Pressurizer Safety Valves.

)

i El-1

\ .-

, UNIT SHUTDOWNS DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: July 8,1999 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JUNE 1999 TELEPHONE: (334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date S: Scheduled , (Hours) (1) (2) Comments

I There were no unit shutdowns during the month.

I gi) au A w N. g) MLilluu.

A Equipment Failure (Explain) 1 Manual D - Maintenance or Test 2 ManualTrip/ Scram C - Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E Operator Training / License Examination 5 -Other (Explain)

F Administrative G OperationalError(Explain)

II- Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT On 990619 at 0702, Unit I was ramped down to 95% power for Steam Dump Testing. The Unit was returned to 100% power on 990619 at 2000.

I I

El-2 l

l I

J

' ' ' ~

OPERATING DATA REPORT F DOCKET NO.: 50-364 UNIT NAME: J. M. Farley Unit 2 DATE: July 8,1999 COMPLETED BY: W. L Marlar TELEPilONE: (334) 814-4554 _ _

OPERATING STATUS

1. Reporting Period: JUNE 1999
2. Design Electrical Rating (Net MWe): .

855

3. Maximum Dependable Capacity (Net MWe): 852 This_ Month Yeatto Date Cumulative
4. Number Of Hours Reactor Was Critical: 662.4 4,285.4 136,753.8
5. Hours Generator On-line: 650.2 4,273.2 134,918.6
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 530,406.0 3,098,662.0 107,197,948.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l

Date i Tag No, i Event Description '

There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1

    • UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: _

July 8,1999 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JUNEl999 TELEPiiONE: (334) 814-4554 l

Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions l No. Date S: Scheduled (Ilours) (1) (2) Comments )

1 99 % 12 F 69.8 A 2 SEE BELOW i

{

)

1 (1) KLASUN. 4) MW HUU. j A - Equipment Failure (Explain) 1 - Manual i

!!- Maintenance or Test 2 ManualTrip/ scram C Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 -other (Explain)

F Administrative  ;

o operational Error (Explain)

II other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT Unit 2 was manuaFy tripped on 06-12-99 because of decreasing Condenser Vacuum. The loss of vacuum was later found to se caused by a broken steam dump drain line.

The broken section ofline was replaced and the unit was restarted and connected to the grid at 1937 on 6-15-99.

E2-2

Text

,,.......

, . , - , .. D:vi + ry Southern Nuclear Mce Pi..,. ..st Operating Company

, farky Pruject R0. Bcx 1295 Birmingham. Alabama 35201 Tel 205.992.5131 July 13, 1999 SOUTHERN h Docket Nos.: 50-348 COMFANY 50 364 '""E'" '* Y'" #" #

NEL-99-0267 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the June 1999 Monthly Operating Reports for Joseph M. Fr.rley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you .'iave any questions, please advise.

Respectfully submitted, Dave Morey RWC:mor

Enclosures:

1. June Monthly Operating Report for Plant Farley Unit 1
2. June Monthly Operating Report for Plant Farley Unit 2

/ lk g g 71 g g g ,-

PDR

c e

- Page 2

.U. S. Nuclear Regulatory Commission ec: Southern uclear Operating Company Mr. L. M. Stinson, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.

I Mr. L. M. Padovan, Licensing Project Manager- Farley .

U. S. Nuclear -Regulatory Commission, Region 11 Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident inspector- Farley I

l t:-  !

OPERATING DATA REPORT DOCKET NO.: 50-348 UNIT NAME: J. M. Farlet- Unit 1 DATE: July 8,1999 COMPLETED BY: W. L. Marlar TELEPHONE: ('>34) 814-4554 OPERATING. STATUS

1. Reporting Period: JUNE 1999
2. Design Electrical Rating (Net MWe): 854
3. Maximum Dependable Capacity (Net MWe): 847 This3fonth YeattoDate Cumulative i
4. Number Of Hours Reactor Was Critical: 720.0 4,305.2 153.208.4
5. Hours Generator On-line: 720.0 4,278.6 151,038.3
6. Unit L.; serve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 600,920.0 3,538,233.0 119,072,550.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SA FETY VALVES Date i Tag No. i hvent Description There were re challenges to Pressurizer PORV or Pressurizer Safety Valves.

)

i El-1

\ .-

, UNIT SHUTDOWNS DOCKET NO.: 50-348 UNIT NAME: J. M. Farley - Unit 1 DATE: July 8,1999 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JUNE 1999 TELEPHONE: (334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No. Date S: Scheduled , (Hours) (1) (2) Comments

I There were no unit shutdowns during the month.

I gi) au A w N. g) MLilluu.

A Equipment Failure (Explain) 1 Manual D - Maintenance or Test 2 ManualTrip/ Scram C - Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E Operator Training / License Examination 5 -Other (Explain)

F Administrative G OperationalError(Explain)

II- Other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT On 990619 at 0702, Unit I was ramped down to 95% power for Steam Dump Testing. The Unit was returned to 100% power on 990619 at 2000.

I I

El-2 l

l I

J

' ' ' ~

OPERATING DATA REPORT F DOCKET NO.: 50-364 UNIT NAME: J. M. Farley Unit 2 DATE: July 8,1999 COMPLETED BY: W. L Marlar TELEPilONE: (334) 814-4554 _ _

OPERATING STATUS

1. Reporting Period: JUNE 1999
2. Design Electrical Rating (Net MWe): .

855

3. Maximum Dependable Capacity (Net MWe): 852 This_ Month Yeatto Date Cumulative
4. Number Of Hours Reactor Was Critical: 662.4 4,285.4 136,753.8
5. Hours Generator On-line: 650.2 4,273.2 134,918.6
6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
7. Net Electrical Energy Generated (MWH): 530,406.0 3,098,662.0 107,197,948.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES l

Date i Tag No, i Event Description '

There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1

    • UNIT SHUTDOWNS DOCKET NO.: 50-364 UNIT NAME: J. M. Farley - Unit 2 DATE: _

July 8,1999 COMPLETED BY: W. L. Marlar REPORTING PERIOD: JUNEl999 TELEPiiONE: (334) 814-4554 l

Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions l No. Date S: Scheduled (Ilours) (1) (2) Comments )

1 99 % 12 F 69.8 A 2 SEE BELOW i

{

)

1 (1) KLASUN. 4) MW HUU. j A - Equipment Failure (Explain) 1 - Manual i

!!- Maintenance or Test 2 ManualTrip/ scram C Refueling 3 - Automatic Trip / Scram D Regulatory Restriction 4 - Continuation E - operator Training / License Examination 5 -other (Explain)

F Administrative  ;

o operational Error (Explain)

II other(Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT Unit 2 was manuaFy tripped on 06-12-99 because of decreasing Condenser Vacuum. The loss of vacuum was later found to se caused by a broken steam dump drain line.

The broken section ofline was replaced and the unit was restarted and connected to the grid at 1937 on 6-15-99.