L-98-024, Discusses Change in Scheduled Completion Date for Commitment to Conduct Evaluation of Adequacy of Surveillance Procedures That Implement TS Requirements to Ensure That Procedures Properly Implemented Required Testing
| ML20202H033 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 01/30/1998 |
| From: | Jain S DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-98-024, L-98-24, NUDOCS 9802200279 | |
| Download: ML20202H033 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Duquesne @ Company my< f vPo <s'aiaa SNpp6ngport. PA 15077 0004 e
SOSHtL C. JAll4 (412) 393 5512 g,*,avgPr..*'*
January 30,199g r= (4i23 s43.aos.
Nuclear Power DMalon L-98-024 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Beaver Valley Power Station, Unit No. I and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Change in Scheduled Completion Date for Commitment
References:
BV-1, LER 97-011-00 dated June 9,1997 BV-2, LER 97-003-00 dated June 20,1997 BV-1, LER 97-013-00 dated July 10,1997 BV-1, LER 97-014-00 dated July 10,1997 Reply to Notice of Violation EA 97-255 dated /.igust 1,1997 BV-1, LER 97-026-00 dated September 13,1997 j
BV-1, LER 97-028-00 dated September 24,1997 BV-1, LER 97-030-00 dated October 8,1997 BV-1, LER 97-036-00 dated December 12,1997 In the correspondence referenced above, Duquesne Light Company (DLC) committed to conduct an evalcation of the adequacy of surveillance procedures that implement technical specification requirements to ensure that the procedures properly implemented the required testir.g. The schedule provided for the completion of this evaluation, including appropriate procedure revbions was January 30, 1998.
The majority of this effort has been completed, hawever, additional reviews remain to be completed. Recent fimdings during these reviews warrant the extension of scope and the need to extend the completion of this action to April 1,1998. Based on the fact that following the performance of surveillances that resulted from this review, equipment operability was found acceptable, DLC believes '. hat the extension request does not represent a challenge to plant safety.
kQDl a
9802200279 980130 PDR ADOCK 05000334 P
PDR g((lyggggg Q11ALITY
\\\\h lI.h \\II,kI,
}
E N E.R G V-Y
Beaver Valley Power St tion, Unit No. I and No. 2 Change in Scheduled Completior. Date for Commitment Page 2 The need and justification for this extension request has been discussed with NRC Region I staff.
If there are any questions concerning this matter, please contact Mr. J. Arias, Director, Safety & Licensing at (412) 393-5203.
Sincerely,
^^
- ^- _ _ _. _
Sushil C. Jain c:
Mr. D. S. Brinkman, Sr. Project Manager y
Mr. D. M. Kern, Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator 1