NUREG-0161, Requests Util Review Manual, Instructions for Preparation of Data Entry Sheets for LER File, NUREG-0161,July 1977 & Modify Nonroutine Occurrence Rept Formats by 770930.W/o Encl

From kanterella
(Redirected from NUREG-0161)
Jump to navigation Jump to search
Requests Util Review Manual, Instructions for Preparation of Data Entry Sheets for LER File, NUREG-0161,July 1977 & Modify Nonroutine Occurrence Rept Formats by 770930.W/o Encl
ML19319B484
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/14/1977
From: Stolz J
Office of Nuclear Reactor Regulation
To: Roe L
TOLEDO EDISON CO.
References
RTR-NUREG-0161, RTR-NUREG-161 NUDOCS 8001220894
Download: ML19319B484 (3)


Text

_

b.

8*

DV DISTRIBUTION-W/0 E'Jr' n URE Docket Fil NRC PDR

GLear, Local PDR LWR-#1 File SEP 141977 Dvassallo uccket rio. o0-346 FWilliams D

f' O JStolz i

LEngle owl Toleco Edison Co.mpany CThomas pqr 7

D A

Alin: Mr. Lowell E. Roe EHylton

_$.k vice eresicent, Facil1 ties ELD

-.D development IE (3)

Ecison Plaza HSmith 3cu aauison Avenue Toleca, unto Cu52 bcc: JRBuchanan, NSIC TBAbernathy, TIC Gentlemen:

ACRS (16)

SuiJECT: Ri:.PURTlaG r<EQUIREttt.NTS tuMIS-JESSE HuCLE.AR POWER STATION, UNIT No.1)

Tne purpose of tnis letter is to request enat you use a slightly moattieo torudt for reporting tnose noa-routine occurrences that are required by your tecnnical spect rications to De reported to the Conmission. You will recall that in October 1974, we startea on a prograra to upcate tne reporting requirexnts spect riec in tne technical specifications of power reactor licensees. Inis program was bro;gnt about in part oy tne Energy Reorgani-Zat1Cn Act of 1974 Section ZUd, WhiCd requires that Certain information aaout aonormal occurrences be reported quarterly to Congress and disseminatec to tne ;,uolic. A regulatory guice was prepared unich toentified tne required repcrts, oath rcutine and non-routine, and aescrioed the neeced infor:1ation.

i<egulatory Guice 1.1.0, " Reporting of Operating Information - Appendix A Tecnnical specifications" was the casts for tne recorting requirenients.

In our letter to you whicn issueo tecnnical specifications in conformance witn tne regulatory guide,.se requested tnat you use the format presented in tne guice and tne instructions found in " Instructions for Preparation of Jata Entry Sneats for Licensee Event Report (LER) File', 00E-SS-uul, Octooer 1;74.

Tne format for tne Licensee Event Report has been modified to mare tne LEds inore useful for evaluation purposes.

In addition, new instructions for completing tne LER have been prepared and may be founa in

  • Instructions for Preparation of Data Entry Sheets for Licensee Evant Report (LER) File" NUREG-0161, July 1977. Two copies of this new instructton manual are enclosed for your future use. For additional coples of tne instruction manual or blank LER forms, please contact our utrector of cianagement Information and Program Control.

Nk 60 orwic s >

summanes >

oars

  • NRC FOIOf 31s (9_.76) NRCM 0240 W us a.oovsamasaper rainytme orrecas so?

M R 0 01220 Of y [

[

$~

/\\

=-

SEP 141977 Toledo Edison Company '

Ine new instruction manual cci tains a facsimile of the revised LER and instructions wnica are very similar to those presertly being used.

One difference is tnat in adottion to the filied in LER form, we request that you provide a complete narrative report of the event for all 14 day follow-up reports. The narrative report snould contain suf ficient information to permit full understanding and enable a safety assessiaent of the event to be hiace. For tne 30 day report, a well written LER within the space limitations of tne LER may oe acequate.

Therefore, we request tnat you review the enclosed instruction manual and make plans to use the revise,1 form and instructions starting with tr.e first repcrtaole occurrence after Septer:ber 30, 1977. If you do not anticipate being aDie to use tne revised form, please notify us witnin 30 cays and your reasons therefore.

Sincerely, Original Siened by' John F.

nti Jonn F. 5:tolz, Chief s

Lignt Water Reactors Branen No.1 Division of Project Management Enclosurer:

" Instructions for Preparation of Data Entry Sneets for Licensee Event Report (LER) File' D #9D o b jl.

D ~%~

~

v

.L

_ JL

_.-)

1 E R-#1

_g.

81 ome.

D._

_ dst 9

9[9/77_.

9///77 9/l27,7 o m,,

_._ rec somu psf 4 NROE 024

  • w s. oovinssesssemierviseeynce isto.ese.eee

\\

.A

=

s SEP 141977 Toledo Edison <,ompany cc: Donald H. Hauser, Esq.

The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 Gerald Charnoff, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.

Washington, D. C.

20036 Leslie Henry, Esq.

Fuller Seney, Henry and Hodge 300 Madison Avenue Toledo, Ohio 43604 D**

]D o o Ju J

^'

s.

. r; -

..J A ovaname >

g.

~

j SATS W MRC PORM 318 (9 M) NEQt SMS..,

'8 w e coveenuswr paiemme oresca seto-emm

~.m...

.a

'