Monthly Operating Repts for June 1995 for Turkey Point Units 3 & 4.W/950713
ML17353A284
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/30/1995
From: Knorr J, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-205, NUDOCS 9508010117
Download: ML17353A284 (13)


Text

,, PRXORX TY 1 ~

(ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOQgET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000 s p 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly repts for June 1995 for Turkey Point Units 0 3 & /950713.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 1 1 NRR/DISP/PIPB 1 1 NRR/DOPS/OECB 1 1 RGN2 1 1 EXTERNAL LITCO BRYCE I J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RZDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN 5D8 (415 2083) TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEED!

4 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

4 SBLI 3]99'-95-205 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the June 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 95080iOii7 950630 PDR ADQCK 05000250 R PDR an fpL Group companY

1 t I4 0 ~

'II

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 6/01/95 662 6/02/95 669 6/03/95 673 6/04/95 675 6/05/95 674 6/06/95 674 6/07/95 672 6/08/95 669 6/09/95 660 6/10/95 656 6/11/95 659 6/12/95 660 6/13/95 664 6/14/95 672 6/15/95 669 6/16/95 597 6/17/95 336 6/18/95 440 6/19/95 673 6/20/95 670 6/21/95 679 6/22/95 683 6/23/95 681 6/24/95 677 6/25/95 672 6/26/95 668 6/27/95 665 6/28/95 662 6/29/95 661 6/30/95 662

DOCKET NO.

UNIT DATE TELEPHONE:

REPORT MONTH Unit 3 operated at essentially 100% reactor power until June 16, when the unit was reduced in power to 40% for a turbine valve test. While at reduced power, water bozes were cleaned. The unit was returned to 100% power on June 18, and remained at essentially that power level for the remainder of June.

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 7/ 7/95 PROVIDED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

l. UNIT NAME: TURKEY POINT
2. REPORTING PERIOD:

UNIT JUNE 1995 3

3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET  : 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MRL~ 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITE~UMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 4343 197840.6
12. NUMBER OF HOURS REACTOR 720.0 4307.7 133286.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 720.0 4303.0 131351. 7
15. UNIT RESERVE SHUTDOWN HO 0.,0 0.0 121.8
17. GROSS ELECTRICALrENERGY GENERATED (MWH) 490042 9333129 3034366

~99063 87795830

18. NET ELECTRICAL EAERGY GENERATED (MWH) 466379 2892166 83086593
19. UNIT SERVICE FACTOR 100.0 99.1 66.4
20. UNIT AVAILABILITYFA 100.0 99.1 66.5
21. CAPACITY FACTOR (USING MD 97.3 100.0 64.0
22. CAPACITY FACTOR (USING DER NET) 93.5 96.1 60.6
23. UNIT FORCED OUTAGE RATE 0.0 0.9 11.0
24. SHUTDOWNS SCHEDULED OVER REFUELING SCHEDULED FOR SEPTEMBER 1995
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE'EPORT MONTH No Date Type Duration (Hours)

Reason'ethod of Shutting Licensee Event Reportf Code'onponent Systen Code'ause & Corrective Action to Prevent Recurrence Down Reactor 03 950616 0.0 N/A HB VALVEX Turbine Valve Test 04 950617 0.0 NIA HH HTEXCH Haterbox Cleaning F Forced Reason Method Exhibit G - Instructions Exhibit 1 - Sane Source S Scheduled A Equipnent Failure 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scran Entry Sheets Licensee C Refueling 3 - Autonatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E operator Training & 5 - Load Reduction License Exaninat ion 9 - Other (Explain)

F - Adninistrative G - Operational Error (Explain)

H - other (Explain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 6/01/95 670 6/02/95 674 6/03/95 678 6/04/95 680 6/05/95 678 6/06/95 678 6/07/95 676 6/08/95 673 6/09/95 602 6/10/95 237 6/11/95 464 6/12/95 668 6/13/95 674 6/14/95 680 6/15/95 676 6/16/95 676 6/17/95 682 6/18/95 680 6/19/95 679 6/20/95 677 6/21/95 686 6/22/95 690 6/23/95 685 6/24/95 682 6/25/95 677 6/26/95 672 6/27/95 668 6/28/95 665 6/29/95 665 6/30/95 667

DOCKET NO.

UNIT DATE:

COMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 operated at essentially 100% reactor power until June 9, when power was reduced to 40% for turbine valve testing. The unit waterboxes were cleaned while the unit was operated at reduced power. The unit was returned to 100% power on June 11 and operated at essentially that power level through the end of the month.

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 7/ 7/95 PROVIDED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: JUNE 1995
3. LICENSED THERMAL POWER-(MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MRE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. ZF CHANGES OCCUR IN CAPACITY RATZNGS (ITEH~MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 4343 191572.0
12. NUMBER OF HOURS REACTOR 720.0 4221.1 129068.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 720.0 4212.6 124976.2
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 577.2 PHY726 PT3T683 254956392
17. GROSS ELECTRICAL ENERGY GENERATED (h&Gg 493023 2977120 84425770
18. NET ELECTRICAL ENERGY GENERATED (MWH) 469438 2837280 79916866
19. UNIT SERVICE FACTOR 100.0 97.0 65.2
20. UNIT AVAILABZLITYFA 100.0 97.0 65.5
21. CAPACITY FACTOR (USING MD 97.9 98.1 63.6
22. CAPACITY FACTOR (USING DER NET) 94.1 94.3 60.2
23. UNIT FORCED OUTAGE RATE 0.0 3.0 10.7
24. SHUTDOWNS SCHEDULED OVER NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTZMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY TELEPHONE:

REPORT MONTH No. Date Type Duration (Hours)

Reason Method of shutting Licensee Event Reportt Code'onponent System Code'ause C Corrective Action to Prevent Recurrenco bown Reactor 05 950609 0.0 N/A HB VALVEX Turbine Valve Test 06 950610 0.0 N/A HH HTEXCH Waterbox Cleaning F - Forced Reason Method Exhibit - Instructions Exhibit - Sa e Source S - Scheduled A - Equip ent Failure 1 - Manual G

for Preparation of Data 1

B Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C Refueling 3 - Autcctatic Scram Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)

E Operator Training 4 5 - Load Reduction License Exanination 9 - Other (Explain)

F G - Adhinistrative Operational Error (Explain)

H Other (Explain)