Monthly Operating Repts for Dec 1994 for Tps Units 3 & 4. W/950113 Ltr
ML17352A995
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/1994
From: Knorr J, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-015, L-95-15, NUDOCS 9501230297
Download: ML17352A995 (15)


Text

R.ICBM I RIDS PROCI'.SSIiG)

EY'CELERATED REGULATORY INFORMATION DISTR BUTION SYSTEM (RIDS)

'F~d/ /S DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Mo crating repts for Dec 1994 for TPS Units 3 & 4.

/950113 r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 CROTEAU,R 1 1

~ INTERNAL: AEOD/SPD/RRAB 1 1 ILE CENTER 01 1 1 NRR/DISP/PIPB 1 1 NRR DOPS/OECB 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 LIMNI NOTE TO ALL"RIDS" RECIPI EY'TS:

DESK, ROOKI P 1-37 EXT. 504-~083 ) TO F

< i PLEASE HELP US TO REDUCE iVSSTE! COYTACT'I'HE DOCL'iIEYTCONTROL I KTf; YOI.'R iAML' ROTI DISTRIBUTIOY LISTS I'OR DOCL'4!Ei'I'S )'OL'Oi "I'L'I'.D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

0 January 13, 1995 L-95-015 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the December 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, F. Plunkett Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant m n 9501230297 941231 an Fpg Gpoap company, R,,.

PDR ADOt K 05000250 PDR l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE Januar 13 1995 COMPLETED BY J. E. Knorr TELEPHONE 305-246-6757 MONTH DECEMBER 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/94 672 12/02/94 681 12/03/94 690 12/04/94 688 12/05/94 684 12/06/94 687 12/07/94 684 12/08/94'2/09/94 683 680 12/10/94 681 12/11/94 684 12/12/94 687 12/13/94 689 12/14/94 692 12/15/94 690 12/16/94 697 12/17/94 622 12/18/94 339 12/19/94 633 12/20/94 693 12/21/94 699 12/22/94 701 12/23/94 672 12/24/94 674 12/25/94 707 12/26/94 30 12/27/94 0 12/28/94 0 12/29/94 48 12/30/94 295 12/31/94 692

ro UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point 43 Januar 13 1995 DATE'OMPLETED J. E. Knorr BY'ELEPHONE:

305 246-6757 REPORT MONTH DECEMBER 1994 No. Date Duration Reasons Method Code'omponent System Cause S Corrective Action to (Hours) of Event Codes Prevent Racurranco Reactor'icensee Shutting Raportt Down 20 121694 0.0 N/A HA VALVEX Turbine Valve Tost 21 122694 82.0 LER HH INSTRU Automatic trip caused by I/P transducer 94-006 fa).lure F Forced Reason Method Exhibit G - Instructions Exhibit 1 - Same Source S Scheduled A - Equipmont Failure 1 Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Rogulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 6 5 - Load Reduction License Examination 9 Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

H~

I I

+4, L

opERATING DATA REpoRT DOCKEl'O 50 - 250 DATE 1/ 9/95 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. Uttl I NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: DECEMBER 1994
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE)t 693
6. MAXIhlUM DEPENDABLE CAPACITY (GROSS MWE)t 699
7. MaXIMUM DEPENDABLE CAPACITY (NET MwE)t 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE ll.

12.

HOURS IN REPORT PERIOD: 744 8760 193497. 6 NUMBER OF HOURS REACTOR WAS CRITICAL 717. 5 7718. 1 128978.4

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 662.0 7515.3 127048.7
15. UNIT RESERVE SjtUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1375950 16026096 264165934
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 449048 5179648 84761464 ttt. NET ELECTRICAL ENERGY GENERATED (MWH) 425419 4924922 80194427
19. UNIT SERVICE FACTOR 89.0 85.8 65.7
20. UNIT AVAILABILITYFACTOR 89.0 85.8 65.7
21. CAPACITY FACTOR (USING MDC NET) 85.9 84.4 63.2 22= CAPACITY FACTOR (USING DER NET) 82.5 81. 1 59.8
23. UNIT FORCED OUTAGE RATE 11.0 2.0 11.3
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE IF SHUT DOWN AT END OF REPORT PERIOD, ESTIhlATED DATE OF STARTUP t

SVMMARY OF OPERATING EXPERIENCE DOCKET NO ~

UNIT Turke Point 3 DATE: Januar 13 1995 COMPLETED J. E. Knorr BY'ELEPHONE'0-250 305 246-6757 REPORT MONTH DECEMBER 1994 Unit 3 started the month at essentially 100% power. On December 16, the unit was reduced to approximately 40% power for turbine valve testing. The unit was returned to essentially 100% power on December 18, and remained at that level until an automatic trip occurred on December 26 due to closure of the "C" main feedwater regulating valve. The trip is covered in LER 94-006.

The unit was returned to power operation on December 29 and operated at 100% power starting on December 31.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE Januar 13 1995 COMPLETED BY J. E. Knorr TELEPHONE 305-246-6757 MONTH DECEMBER 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/94 0 12/02/94 199 12/03/94 688 12/04/94 688 12/05/94 685 12/06/94 687 12/07/94 689 12/08/94 684 12/09/94 684 12/10/94 685 12/11/94 688 12/12/94 690 12/13/94 692 12/14/94 696 12/15/94 698 12/16/94 700 12/17/94 697 12/18/94 694 12/19/94 688 12/20/94 694 12/21/94 704 12/22/94 696 12/23/94 673 12/24/94 675 12/25/94 675 12/26/94 707 12/27/94 704 12/28/94 709 12/29/94 700 12/30/94 700 12/31/94 696

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turke Point $ 4 DATE: Januar 13 1995'.

COMPLETED BY: E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH DECEMBER 1994 No. Date Duration (Hours)

Reasons Method of Event System Code Code'ause Co"ponent 6 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reports 13 120194 33.6 LER EB ELECON Reactor Trip Due to Turbine Generator Ground 94-006 F - Forced Reason Method Exhibit G - instructions Exhibit 1 - Same Source S Scheduled A - Equipment Failure 1 Manual

- for Preparation of Data B Maintenance or Test 2 Manual Scram Entry Sheets Licensee C Refueling 3 - Automatic Scram Event Report (LER) File D Regulatory restriction 4 - continued (NUREG-0161)

E Operator Training 4 5 Load Reduction License Examination 9 Other (Explain)

F - Administrative G - Operational Error (Explain)

H Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 1/ 9/95 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

'I. UNIT NAME: TURKEY l'OItlT UNIT 4

2. REPORTING PERIOD: DECEMBER 1994
3. LICENSED THERMAL PQWER (MWT): 2200
4. NAMEPI.ATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE)t 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. tAAXItAUM DEPENDABLE CAPACITY (NET MWE): 666 8, IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT. GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -Y10- CUMULATIVE ll. tiouRS IN REPORT

12. Nl>MBER OF PERIOD: 744 8760 187229.0 HOURS REACTOR WAS CRITICAL 727. 1 7567.5 124847.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6 14, HOURS GENERATOR ON-LINE 710.4 7438.6 120763.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1550991 15864754 254924709
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 510143 5094680 81448650
18. NET El.ECTRICAL ENERGY GENERATED (MWH) 485850 4844354 77079586
19. UNI'I SERVICE FACTOR 95.5 84.9 64.5
20. UNI1 AVAILABILITYFACTOR 95.5 84.9 64.8
21. CAPACITY FACTOR (USING MDC NET) 98.1 83.0 62.8
22. CAPACITY FACTOR (USING DER NET) 94.2 79.8 59.4
23. UNIT FORCED DOTAGE RATE 4.5 3.9 10.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUPt

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT Turke Point 4 DATE: Januar 13 1995 TELEPHONE'0-251 COMPLETE BY: J. E. Knorr 305 246-6757 REPORT MONTH DECEMBER 1994 Unit 4 began the month shut down after a reactor trip which occurred on November 30. The unit was returned to the line on December 2, and reached 100 0 power on December 3. The unit remained at 100% power through the end of the month.

Ji V'