Monthly Operating Repts for Aug 1994 for Turkey Point Units 1 & 2.W/940915 Ltr
ML17352A791
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/1994
From: Mowrey C, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-226, NUDOCS 9409210349
Download: ML17352A791 (15)


Text

PR.IC)R.I EY' ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET N FACIL:50-250 Turkey Point Plant, Unit. 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION MOWREY,C.L. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION for for j

SUBJECT:

Monthl 'ng repts Aug 1994 Turkey Point Units 1 & /940915 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL t SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CEggEQ 1 1 NRR/DORS/OEAB 1 1 NRR/PMAS/IRCB-E 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACI THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 504-2083 ) TO ELIilIINATEYOUR NAME FROif DISTRIBUTION LISTS I'OR DOCUMENTS YOU DONEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

C SEP 1~78q4 L-94-226 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the August 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/CLM Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant r.io () ~0 i3 940921034'V 940831 RDR ADOt K 05000250 PDR 7j c')

an FPL Group company

W k AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE Se tember 9 1994 COMPLETED BY C. L. Mowre TELEPHONE 305-246-6204 MONTH AUGUST 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 8/01/94 633 8/02/94 673 8/03/94 642 8/04/94 675 8/05/94 672 8/06/94 672 8/07/94 670 8/08/94 668 8/09/94 668 8/10/94 664 8/11/94 647 8/12/94 682 8/13/94 684 8/14/94 680 8/15/94 678 8/16/94 673 8/17/94 670 8/18/94 668 8/19/94 670 8/20/94 657 8/21/94 667 8/22/94 669 8/23/94 650 8/24/94 670 8/25/94 676 8/26/94 679 8/27/94 678 8/28/94 679 8/29/94 680 8/30/94 673 8/31/94 669

'b OPERATING DATA REPORT DOCKFT NO 50 - 250 DATE 9/ 9/94 COMPLETED BY C. L. MOWREY TELEPHONE 305/246/6204 OPERATING STATUS

1. UNIT NAME: TURKEY POINT
2. REPORTING PERIOD:
3. LICENSED THERMAL POWER (MWT)t NAMEPLAfE RATING (GROSS MWE):

UNIT 3 AUGUST 1994

5. DESIGN ELECTRICAL RATING (NET MWE):
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

2200

/60 693 699

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)t 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICli RESTRICTED, IF ANY (NET MWE)
10. RCASONS FOR RESTRICTIONS'F ANY:

MONTHLY -YTD- CUMULATIVE 11.. tiOURS IN REPORT PERIODE 744 5831 190568.6

12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4815. 6 126075.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4

)4. HOURS GENERATOR ON-LINE 744.0 4668.3 124201.7

15. UNIT RESERVE SttUTDOWN tiOURS 0.0 0.0 121. 8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1634168 9895436 258035274

'17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 523715 3187795 82769611

18. NET ELECTRICAL ENERGY GENERATED (MWH) 498867 3028853 78298358
19. Uttl T SERVICE I=ACTOR 100.0 80.1 65.2
20. UNIT AVAILABILITYFACTOR 100.0 80.1 65.2
21. CAPACITY FACTOR (USING MDC NET) 100.7 78.0 62.7
22. CAPACITY FACTOR (USING DER NET) 96.8 75.0 59.3
23. UNIT FORCED OUI'AGE RATE 0.0 1.4 11.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point 43 DATE: Se tember 9 1994 COMPLETED BY: C. L. Mowre REPORT MONTH AUGUST 1994 No. Date Type Duration Reason Yethod of Licensee Syst~4 Co=pongnt Cause 6 Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down 3

Reportt Reactor N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A F Porced Reason Yethod Exhibit G - instructions Exhibit 1 - Sane Source S Scheduled A Equipnent Failure - Ymnual for Preparation of Data 8 - Yaintenance or Test 1

2 - Nanual Scran Entry Sheets Licensee C Re fueling 3 Autonatic Scram Event Report (LER) Pile D Regulatory restriction 4 - Continued (NUREG-0161)

E operator Training 6 5 - Load Reduction License Exanlnation 9 Other (Explain) p Adninis rat t lve

- Operational Error G

(Exp la in)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point 3 DATE: Se tember 9 1994 COMPLETED BY: C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH AUGUST 1994 Unit 3 began the month operating at essentially 100% power.

Power level remained at essentially 100% for the entire month.

AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE Se tember 9 1994 COMPLETED BY C. L. Mowre TELEPHONE 305-246-6204 MONTH AUGUST 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 8/01/94 666 8/02/94 665 8/03/94 668 s/o4/94 670 8/05/94 668 8/06/94 668 8/07/94 666 8/08/94 664 8/09/94 665 8/10/94 667 8/11/94 652 8/12/94 677 8/13/94 679 8/14/94 675 8/15/94 673 8/16/94 666 8/17/94 664 8/18/94 662 8/19/94 664 8/20/94 666 8/21/94 666 8/22/94 665 8/23/94 649 8/24/94 662 8/25/94 665 8/26/94 665 S/27/94 666 8/28/94 675 8/29/94 668 s/3o/94 661 8/31/94 657

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 9/ 9/94 COMPLETED BY C. L. MOWREY TELEPHONE 305/246/6204 OPERATING STATUS

l. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: AUGUST 1994
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LFVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10 REASONS FOR RESTRICTIONS. IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORI PERIOD: 744 5831 184300.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5655.9 122936.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 744.0 5646.2 118971. 2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1635338 12122245 251182200
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 519965 3888877 80242847
18. NEf ELECTRICAL ENERGY GENERATED (MWH) 496101 3704003 75939235
19. UNIT SERVICE FACTOR 100. 0 96.8 64.6
20. UNIT AVAILABILITYFACTOR 100. 0 96.8 64.9
21. CAPACITY FACTOR (USING MDC NET) 100. 1 95.4 62.8
22. CAPACITY FACTOR (USING DER NET) 96. 2 91.7 59.5
23. UNIT FORCED OUTAGE RATE 0.0 3.2 11.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS RLFUt:LING OUTAGE SCHEDULED TO START OCTOBER 3 1994

~

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turke Point g4 DATE: Se tember 9 1994 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH AUGUST 1994 No. Date Type Duration Reason2 Nethod of Licensee Ccxapongnt Cause S Corrective Action to (Hours) Shutting Event System Code Code Prevent Recurrence Down Reportt Reactor N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A P Eorced Reason Hethod Exhibit G - Instructions Exhlblt 1 - Sane Source S - Scheduled A - Equip ent Pailure 1 - Hanual

)anual Scran for Preparation of Data B Nalntenance or Test 2 Entry Sheets Licensee C Refueling 3 Autonatic Scram Event Report (LER) Pile D Regulatory restriction 4 - Continued (NOREG-0161)

E Operator Training 6 5 - Load Reduction License Exanination 9 - Other (Explain)

F - Adnlnistrative G - Operational Error (Explain)

H Other (Explain)

4 ~ ~

~ ~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT'ATE:

Turke Point 4 Se tember 9 1994 COMPLETE C. L. Mowre BY'ELEPHONE:

305 246-6204 REPORT MONTH AUGUST 1994 Unit 4 began the month of July at essentially 100% power, and remained at approximately 100% for the entire month.

~ ~ A