ACCELERATED D TRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9312290299 DOC.DATE: 93/11/30 NOTARIZED: NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HANEK,O. Florida Power 6 Light Co.

PLUNKETT,T.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Nov 1993 for Turkey Point Units 3

& 4.W/931210 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

A RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 RAGHAVAN,L 1 1 D

INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRg~ S/OEAB 1 1 NRR/DRIL/RPEB 1 1

~EG F 01 1 1 RGN2 1 1 EXTERNAL: EGGG BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 200555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020r attached are the November 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Thomas P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 93)2290299 93l130 PDR ADOCK 05000250 R

PDR an FPL Group company

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT TTTRjKY POINT 3 DATE MB 3 COMPLETED BY TELEPHONE 3133-~6 607 MONTH NOVEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/93 700 11/02/93 706 11/03/93 703 11/04/93 697 11/05/93 691 11/06/93 687 11/07/93 686 11/08/93 687 11/09/93 685 11/10/93 677 11/11/93 682 11/12/93 692 11/13/93 693 11/14/93 690 11/15/93 688 11/16/93 688 11/17/93 688 11/18/93 688 11/19/93 686 11/20/93 684 11/21/93 684 11/22/93 685 11/23/93 688 11/24/93 691 11/25/93 695 11/26/93 691 11/27/93 685 11/28/93 685 11/29/93 698 11/30/93 704

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME:

DATE: ece er COMPLETED BY: ane TELEPHONE:

REPORT MONTH NOVEMBER 1993 No Date Duration Reasons Method of Licensee Sgstep Componept Cause 4 Cozrective (Hours) Shutting Event ode Code Action to Type'/A Down Reports Prevent Recuzrence Reactors ,

NA N/A 0.0 N/A N/A N/A N/A N/A N/A F Forced

- Reason

-- Equipment Failure Method Exhibit G Instructions Exhibit 1 - Sane Source S Scheduled A Maintenance or Test 1 Manual 2 Manual Scram for Preparation of Data B

Refueling Entrv Sheets Licensee 3 Automatic Scran Event Report (LER) File D - Regulatory restriction C

4 continued E - OperatOr Traininq 4 (NUREG-01 6 1 )

5 Load Reduction License Examination Other (Explain)

F - Administrative 9

G - Operational Error (Explain)

H - Othez (Explain)

,w1

~4' t

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 12/ 8/93 COMPLETED BY OLGA HANEK TELEPHONE 305/246/6607 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: NOVEMBER 1993 LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. 01 SIGN ELECTRICAL RATING (NET MWE): 693 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699

/ MAX1MUM DEPENDABLE CAPACITY (NET MWE): 666 8 IF CHANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE 11 HOURS IN REPORT PERIOD: 720 8016 183993.6 lf. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7757.0 120516.3

13. MEAa fOR RFSERVE SHUTDOWN HOURS 0.0 0.0 844.4 HOURS GFNERATOR ON-LINE 720.0 7678.6 118789.4 Uw!T RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1583207 16595314 246502241 ll.

18 GROSS ELECTRICAL ENERGY GENERATED (MwH)

NEI ELECTRICAL ENERGY GENERATED (MWH) 520525 5396625 79038751 496864 5138803 74750963 19 UNI> SERV1CE FACTOR 100.0 95.8 64.6 20 UNI 'VAILABILITY FACTOR 100. 0 95.8 64.6

21. CAPACITY FAC>OR (USING MDC NET) 103. 6 96.3 62.0 22 QapacITY FACTOR (USING DER NET) 99.6 92.5 58.6 UNII FORCFD OUTAGE RATE 0.0 2.0 11.9
24. SHUI'DOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 14 REFUELING OUTAGE FOR 3/94 25 1t SHU DOWN AT END OF REPORT PERIOD, FSTIMATED DATE OF STARTUP: N/A

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT ur e oxn DATE: ece er COMPLETED BY: ane TELEPHONE:

REPORT MONTH NOVEMBER 1993 Unit 3 began the month of November at 100% power and retained that status through the end of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT 4 DATE COMPLETED BY TELEPHONE .K3=:~6 607 MONTH NOVEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/93 698 11/02/93 705 11/03/93 700 11/04/93 693 11/05/93 688 11/06/93 684 11/07/93 684 11/08/93 684 11/09/93 683 11/10/93 682 11/11/92 685 11/12/93 691 11/13/93 693 11/14/93 688 11/15/93 685 11/16/93 685 11/17/93 687 11/18/93 686 11/19/93 684 11/20/93 683 ll/21/93 684 11/22/93 682 11/23/93 687 11/24/93 691 11/25/93 694 11/26/93 690 11/27/93 684 11/28/93 685 11/29/93 697 11/30/93 702

UNZT SHUTDOWNS AND POWER REDUCTZONS DOCKET NO. 50-251 UNZT NAME:

DATE COMPLETED BY ane TELEPHONE:

REPORT MONTH NOVEMBER 1993 No. Date Duration Reasons Method of Licensee Systep Conponept Cause 4 Corrective (Hours) Shutting Event Code Code Action to Down Reportf Prevent Recurrence Reactor'IA NIA N/A NIA 0.0 NIA N/A N/A NIA NIA F Forced S Scheduled Reason

-- Method

- Exhibit G - Instructions Exhibit 1 Sane Source A Equipment Failure 1 Manual for Preparation of Data B

- Maintenance or Test 2 Manual Scrap Entry Sheets Licensee C Refueling 3 Autoaatlc Scran EvenE Report (LER) File D Regulatory restriction 4 Continued (NUREG 0161)

E Operator Trainina 4 5 Load Reduction License Exanination Other (Explain)

F - Administrative G - Operational Error (Explain)

H Other (Explain)

lg 4

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 12/ 8/93 COMPLETED BY OLGA HANEK TELEPHONE 305/246/6607 OPERATING STATUS

1. UNI 1'AME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: NOVEMBER 1993 LICtNSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING -(GROSS MWE): 760
b. DLSfisN ELECfRICAL RATING (NET MWE): 693 6 MAXIMUM DEPLNDABLE CAPACITY (GROSS MWE): 699 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8 lF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAS'T REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10- REASONS FOR'ESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 8016 177725.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6697.7 116536.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 720.0 6535.7 112581. 0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1584325 13847828 237422163
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 519410 4452180 75811150
18. NLI ELFCTRICAI ENERGY GENERATED (MWH) 495896 4227842 71716783
19. UNIT SERVICE FACTOR 100.0 81.5 63.3
20. UNII'VAILABILITYFACTOR 100.0 81.5 63.7 21, CAPACITY FACTOfl (USING MDC NET) 103.4 79.2 61. 6 22 CAPACITY FACIOR (USING OER NET) 99.4 76. 1 58.2
23. UNI1 FORCED OUTAGE RATE 0.0 2 ' 11.4
24. StlUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE 25 1 1 SI1UT DOwN A 1 END OF REPORT PERIOD, LSTIMATED DATE Of- STARTUP: N/A

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: ur e oxn DATE ece er COMPLETED BY ane TELEPHONE:

REPORT MONTH NOVEMBER 1993 Unit 4 began the month of November at 100% power and retained that status through the end of the month.