Monthly Operating Repts for Aug 1993 for Turkey Point,Units 3 & 4.W/930914 Ltr
ML17352A235
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/1993
From: Callander R, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-93-233, NUDOCS 9309200178
Download: ML17352A235 (14)


Text

~ ACCELERATEJ DOCUMENT DISTRIB> TlON SYSTEM REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)

ACCESSION ABR:9309200178 DOC.DATE: 93/08/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CALLANDER,R. Pacific Gas & Electric Co.

PLUNKETT,T.F. Pacific Gas & Electric Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Aug 1993 for Turkey Point, Units 3 & 4.W/930914 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 RAGHAVAN,L 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NR~RJPORSJOEAB 1 1 NRR/DRIL/RPEB 1 1

~REG=I~H E 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCEgJ.H 1 1 NRC PDR 1 1 NSIC 1 1 S

NOTE TO ALL "RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WAS1'I'! CONTACI'fIIE DOCUMEN'I'ON'I'ROI. DISK, ROOlvf Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DIS'l RIBIfl!ON LISTS FOR DOCUMEN'I'S YOU DON"I NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

SEP 14 t993 L-93-233 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkev Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the August 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very Truly Yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/RCC/rc attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

+3OiaOOjye '

'PDR

=

' "~gg0<< +3083g R OSOOOPSO PaR an FPL Group company

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT VUKKfH POINT 3 DATE 93 COMPLETED BY TELEPHONE MONTH AUGUST 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 08/01/93 676 08/02/93 673 08/03/93 671 08/04/93 673 674 '8/05/93 08/06/93 673 08/07/93 674 08/08/93 676 08/09/93 676 08/10/93 675 08/11/93 674 08/12/93 671 08/13/93 670 08/14/93 670 08/15/93 669 08/16/93 669 08/17/93 674 08/18/93 673 08/19/93 673 08/20/93 672 08/21/93 670 08/22/93 668 08/23/93 666 08/24/93 669 08/25/93 668 08/26/93 675 08/27/93 671 08/28/93 667 08/29/93 670 08/30/93 674 08/31/93 673

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME DATE e e er COMPLETED BY: a an er TELEPHONE:

REPORT MONTH AUGUST 1993 No Date Duzation Reason Method of Licensee Sgstep Compnept Cause s Corrective (Hours) Shutting Event ode Action to Down Reportt Pzevent Recurrence Reactoze ,

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A F -- Fozced Reason

-- Equipment Failure Method Exhibit G Instructions Exhibit 1 Same Source s scheduled A or Test 1 Manual 2 Manual Scram for Preparation of Data 8

- Maintenance Entrv Sheets Licensee C Refueling 3 Automatic Scram Event Report (LER) File D Regulatory restriction 4 Continued (NUREG-0161)

E Operator Training 4 5 Load Reduction L1cense Examination 9 Other (Explain)

F Administrative G Operational Error (Expla1n)

H Other (Explain)

E II

OPERATING DATA REPORT DOCKET NO 50 250 DATE 9/08/93 COMPLETED BY R. CALLANDER TELEPHONE 305/246/6818 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: AUGUST 1993
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 5831 181808. 6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5714. 9 118474.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744.0 5678.5 116789.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121. 8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1 637081 12302329 242209256
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 524520 4000620 77642746
18. NET ELECTRICAL ENERGY GENERATED (MWH) 499850 3811001 73423161
19. UNIT SERVICE FACTOR 100.0 97.4 64.2
20. UNIT AVAILABILITYFACTOR 100.0 97.4 64.3
21. CAPACITY FACTOR (USING MDC NET) 100. 9 98.1 61.7
22. CAPACITY FACTOR (USING DER NET) 96.9 94.3 58.3
23. UNIT FORCED OUTAGE RATE 0.0 2.6 12. 1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: ur e oxn DATE: e e er 3 COMPLETED BY: . . a an er REPORT MONTH AUGUST 1993 Unit 3 operated at essentially 100% power throughout the month of August.

1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURK% POINT 4 DATE P M 93 COMPLETED BY TELEPHONE MONTH SEPTEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 08/01/93 672 08/02/93 668 08/03/93 668 08/04/93 671 08/05/93 673 08/06/93 673 08/07/93 672 08/08/93 673 08/09/93 674 08/10/93 673 08/11/92 672 08/12/93 542 08/13/93 08/14/93 08/15/93 08/16/93 08/17/93 49 08/18/93 620 08/19/93 675 08/20/93 676 08/21/93 675 08/22/93 672 08/23/93 674 08/24/93 672 08/25/93 674 08/26/93 681 08/27/93 678 08/28/93 643 08/29/93 655 08/30/93 660 08/31/93 660

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT TELEPHONE'0-251 NAME'ATE'OMPLETED BY a an er REPORT MONTH AUGUST 1993 No. Date Type'uration (Hours)

Reason'ethod of Shutting Licensee Event Systep Code Coaponept Code Cause 4 Corrective Action to Down Reports Prevent Recurrence Reactors 081293 97 N/A VALVEX Repair 4-524A pressurizer spray nini b ss valve 12 081693 15 251-93-3 CC HTEXCH Turbine trip/reactor trip due to high steam generator level (see the Unit 4 Sumry 251-93-3 of Operating Experience 4 LER F Forced Reason Method Exhibit Instructions Exhibit Sane Source S Scheduled A Equipnent Failure 1 -- Manual G

for Preparation of Data 1

8 Maintenance or Test Kmual Scran Entry Sheets Licensee C - Refueling 2 3 Autcctatic Scram Event. Report (LER) File D Regulatory restriction Operator 4 Continued

-- (NUREG-0161)

E Training 4 5 Load Reduction License Exanination Other (Explain)

F - Adninistrative 9

G Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 9/08/93 COMPLETED BY R. CALLANDER TELEPHONE 305/246/6818 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: AUGUST 1993
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)

'10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 5831 175540.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 640.4 4512. 7 114351.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 632.2 4350.7 110396.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1368700 9206251 232780586
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 436240 2958685 74317655

'18. NET ELECTRICAL ENERGY GENERATED (MWH) 413887 2805023 70293964

19. UNIT SERVICE FACTOR 85.0 74.6 62.9
20. UNIT AVAILABILITYFACTOR 85.0 74.6 63.2
21. CAPACITY FACTOR (USING MDC NET) 83.5 72.2 61. 1
22. CAPACITY FACTOR (USING DER NET) 80.3 69.4 57.8
23. UNIT FORCED OUTAGE RATE 2.0 3.4 11.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :NO NE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: ur e own DATE e COMPLETED BY a an er TELEPHONE:

REPORT MONTH AUGUST 1993 Unit 4 began the month of August at 100% power and remained there until August 12. A shutdown, commencing at. 1755 on required to repair a leak on the 4-524A pressurizer August 12, was spray mini bypass valve. The unit reached Mode 5 on August 13 and repairs began. The repair was completed and heat-up commenced on August 15.

On August 16-, with the unit in Mode 1 and 28% power, two high ressure feedwater heaters were being placed in service.

ersonnel error resulted in the feedwater heaters being returned to service incorrectly and steam generator levels rose faster that the reactor operators could control them. At 2233, the turbine tripped on high-high level in the 4C steam generator, generating an automata.c reactor trip.

The unit again reached Mode 1 on August 17. By 0600 on August 18, the unit had returned to 100% power. The unit remained at essentially 100% power for the remainder of the month.

t