Monthly Operating Repts for May 1993 for Turkey Point,Units 3 & 4.W/930614 Ltr
ML17352A067
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/31/1993
From: Herbenick G, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-93-158, NUDOCS 9306210316
Download: ML17352A067 (27)


Text

ACCEI.ERAT DOCUlVHENT DIST UTION SYSTEM REGULAT INFORMATION DISTRIBUTION jSTEM (RIDS)

ACCESSION. NBR:9306210316 DOC.DATE: 93/05/31 NOTARIZED: NO DOCKET ¹ FACIAL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HERBENICK,G. Florida Power 6 Light Co.

PLUNKETT,T.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for May 1993 for Turkey Point, units 3 a 4.W/930614 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

~ ENCL I SIZE: IS f NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 RAGHAVAN,L 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NR /~ RPEB 1 1 NRR/DRPW/OEAB 1 1 FILE 01 1 1 RGN2 1 1 EXTERNAL: EGS(G BRYCEPJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO, ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

0 Z

.0. Box 029100,~ Miami, FL, 33102-9100

~

JUN 14 1993 L-93-158 10 CFR 50.36 U. ST Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the May 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/GDH/gh attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant 93062i03ib 930531 05000250 PDR ADOCK PDR R

an FPL Group company

I ~ I, I

1 I'

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT TURKEY POINT 03 DATE JUNE 10 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MAY 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01/93 690 05/02/93 689 05/03/93 687 05/04/93 683 05/05/93 679 05/06/93 677 05/07/93 676 05/08/93 679 05/09/93 681 05/1 0/93 684 05/1 1/93 687 05/1 2/93 686 05/1 3/93 684 05/1 4/93 681 05/1 5/93 680 05/1 6/93 679 05/1 7/93 676 05/1 8/93 674 05/1 9/93 674 05/20/93 674 05/21/93 677 05/22/93 679 05/23/93 679 05/24/93 683 05/25/93 683 05/26/93 680 05/27/93 677 05/28/93 676 05/29/93 677 05/30/93 674 05/31/93 677

'E

~ ~

l

'4

~'

E

> ~

OPERATING DATA REPORT DOCKET NO 50 250 DATE 6/ 1 0/93 COMPLETED BY G. D. HERBENICK TELEPHONE 305-246<<7112 OPERATING STATUS ~

UNIT NAME: TURKEY POINT UNIT 3

2. REPORTING PERIOD: MAY 1993
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE):

693

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT. GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT'ERIOD: 744 3623 179600.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3506.9 116266.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744.0 3470.5 114581. 3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1635535 7521082 237428009
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 530845 2470555 761 12681
18. NET ELECTRICAL ENERGY GENERATED (MWH) 505954 2353693 71965853
19. UNIT SERVICE FACTOR 100.0 95.8 63.8
20. UNIT AVAILABILITYFACTOR 100.0 95.8 63.9
21. CAPACITY FACTOR (USING MDC NET) 102. 1 97.5 61.2
22. CAPACITY FACTOR (USING DER NET) 98. 1 93.7 57. 8
23. UNIT FORCED OUTAGE RATE 0.0 4.2 12.3
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: June 10 1993 COMPLETED BY: G. Herbenick TELEPHONE'05 246-7112 REPORT MONTH MAY 1993 No. Da'ze Duration (Hours)

Reason'ethod of Shutting Event Reactoz'icensee Dovn Reporta Systen Code Code'ause Coupe nant a Corrective Action to Prevent Recurrence N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A P Forced Reason Method Exhibit C Instructions Exhibit I - Sane Source S Scheduled -

A Equipnent Failure 1 - Manual for Preparation of Data

- or Test 2 - Manual serac Entry Sheets Licensee B

C - Maintenance Refueling 3 hutcuaatic Scran Event Report (LER) Pile D - Regulatory restriction 4 - Continued (NDREC 01SI)

E - operator Training a 3 - Load Reduction License Exanination 9 - Other (Explain)

F - hdninistrative C - Operational Error (Explain)

H Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE June 10 1993 COMPLETED BY:G. Herbenick TELEPHONE: 305 246-7112 REPORT MONTE ~Ma 1993 Unit 3 essentially maintained 100% power for the month of May.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT ¹4 DATE JUNE 10 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MAY 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01/93 05/02/93 05/03/93 05/04/93 05/05/93 05/06/93 05/07/93 05/08/93 05/09/93 05/1 0/93 05/1 1/92 05/1 2/93 05/1 3/93 05/1 4/93 05/1 5/93 05/1 6/93 05/1 7/93 05/1 8/93 05/1 9/93 05/20/93 05/21/93 05/22/93 05/23/93 05/24/93 05/25/93 05/26/93 05/27/93 111 05/28/93 282 05/29/93 289 05/30/93 289 05/31/93 289

0 l

f ~ S

OPERATING DATA REPORT DOCKET NO 50 251 DATE 6/ 10/93 COMPLETED BY G. D. HERBENICK TELEPHONE 305-246-7112 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: MAY 1993
3. LICENSED 'THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM OEPENOAELE CAPACITY IGROSS M~WE: 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTO- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 3623 173332.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 206.0 2581. 3 112419.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
14. HOURS GENERATOR ON-LINE 123.6 2490.4 108535.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 118057 5280872 228855207
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 33860 1710795 73069765
18. NET ELECTRICAL ENERGY GENERATED (MWH) 26337 1624054 691 12995
19. UNIT SERVICE FACTOR 16.6 68.7 62. 6
20. UNIT AVAILABILITYFACTOR 16.6 68.? 63.0
21. CAPACITY FACTOR (USING MDC NET) 5.3 67.3 60.9
22. CAPACITY FACTOR (USING OER NET) 5.1 64.7 57.5
23. UNIT FORCED OUTAGE RATE 0.0 0.3 11.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

PI l'r

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: TURKEY POINT UNIT 4 DATE: June 10 1993 COMPLETED BY: G. Herbenick TELEPHONE: 305 246-7112 REPORT MONTH MAY 1993 Date Dura'tion (Hours)

Reason'ethod of Shutting Dovn Licensee Fvent ReportS System Code'ause Code'omponent a corrective Action to Prevent Recurrence Reactor 060193 618. 15 N/A RC UNIT 6 SHUTDONN OF SUHEDULED REFUELINU 03 052293 2. 11 N/A TA TURBIÃE OVERSPEED TEST Oa 052093 0.0 N/A RC INSTRU PLUX FAPPINC F Forced Reason Hethod Exhibit C - Instructions Exhibit I - Sane Source s - Scheduled A - Equipment Failure 1 - Nanual for Preparation of Data B - Naintenance or Test 2 - manual Scram Entry Sheets Licensee

- Refueling - Event Report (LER) Pile C

D - Regulatory restriction 3

6 - Automatic Continued Scram (NUREC-0161)

E - rator Training I 5 Load Reduction cense Examination 9 - Other (Explain)

F - Administrative

- Error (Explain) 0 H - Operational Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE JUNE 10 1993 COMPLETED BY:G. D. Herbenick TELEPHONE: 305 246-7112 REPORT MONTH MAY 1993 Unit 4 began a refueling and maintenance outage on April 9 and ended the outage at 1815 Eastern Daylight Savings Time on May 26.

Unit 4 stayed on line the remainder of the month of May.

FLORIDA POWER 8. LIGHT COMPANY DAILY AVERAGE OUTPUT NPTP 5/ 1/93 690 -2 5/ 2/93 689 -2 5/ 3/93 687 -2 5/ 4/93 683 -2 5/ 5/93 679 -2 5/ 6/93 677 -2 5/ 7/93 676 -2 5/ 8/93 679 -2 5/ 9/93 681 -2 5/ 10/93 684 -2 5/11/93 687 -2 5/ 2/93 1 686 -2 5/13/93 684 2 5/ 14/93 681 -1 5/15/93 680 0 5/ 16/93 679 -1 5/ 17/93 676 -1 5/ )8/93 674 -5 5/19/93 674 9 5/20/93 674 -14 5/21/93 677 -19 5/22/93 679 -19 5/23/93 679 -20 5/24/93 683 -22 5/25/93 683 -21 5/26/93 680 -4 5/27/93 677 111 5/28/93 676 282 5/29/93 677 289 5/30/93 674 289 5/31/93 677 289

\ +w OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 6/ 8/93 COMPLETED 8 D. M. BONETT TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: MAY 1993
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN, ELECTRICAL RATING (NET MWE): 693 6,0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 0 0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) '70K 0 SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD:. 744 3623 179600.6 12 NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3506.9 116266.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 14.

15.

16.

17.

HOURS GENERATOR ON-LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH) 744.0 0

1635535 0'~03470.5 7521082 114581. 3

/PI 'g 237428009 a

GROSS ELECTRICAL ENERGY GENERATED (MWH) 530845 2470555 761 1268 'I

18. NET ELECTRICAL ENERGY GENERATED (MWH) 505954 2353693 71965853
19. UNIT SERVICE FACTOR 100.0 95.8 63.8
20. UNIT AVAILABILITYFACTOR 100.0 95.8 63.9
21. CAPACITY FACTOR (USING MDC NET) 102. 1 97.5 61. 2
22. CAPACITY FACTOR (USING DER NET) 98.1 93.7 57.8
23. UNIT FORCED OUTAGE RATE
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS

~IP.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

I' 5

gt

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 6/ 8/93 COMPLETED BY D. M. BONETT TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: MAY 1993
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 3623 173332.0 n

k<<

l4 BZ8 zg 12.

/Pg/3.ag ~/0258$ '7 'gg~ pig.q-NUMBER OF HOURS REACTOR WAS CRITICAL 206.0 2581. 3 112419.9 13.

14.

15.

16.

17.

REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON-LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

GROSS ELECTRICAL ENERGY GENERATED (MWH)

~O 0.0 123.6 118057 33860 0.0 2490.4 0.0 5280872 1710795 166. 6 108535.7 777M 228855207 73069765 18.

19.

NET ELECTRICAL ENERGY GENERATED (MWH)

UNIT SERVICE FACTOR 26337 16.6 1624054 68.7 69112995

62. 6

//, g

20. UNIT AVAILABILITYFACTOR 16.6 68.7 63.0
21. CAPACITY FACTOR (USING MDC NET) 5.3 67.3 60.9
22. CAPACITY FACTOR (USING DER NET) 5.1 64.7 57.5 23.

24.

UNIT FORCED OUTAGE RATE SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS D.O 't) R ~lh nt

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

~l t

4 j +*

6/ 8/93 FLORIDA POWER AND LIGHT COMPANY PAGE 1 OUTAGE REPORT FOR PTP4 PERIOD: MAY THRU MAY 1993 OUTAGE EE I START END MW NUMBER CD Mhl/DD/HH/MN MM/DD/HH/MN TYPE CURT ------ REMARKS --- PERIOD HRS:MN CYCLE 4 2070 4/ 9/23/56 5/26/'18/15 3 666 REFUELING OUTAGE 618: 15 C 5 4460 5/27/10/55 5/27/ 13/ 6 2 666 TURB OVERSPEED TRIP 2: 11 H 6 2040 5/28/ 2/ 0 5/31/23/59 A 378 50% HOLD FLUX MAP 93:59 OUTAGE

SUMMARY

OUT NUMBER OF TOTAL EQUIVALENT TYPE OCCURENCES HOURS:MN HOURS:MN FACTORS 1 0 0: 0 0: 0 ) EFOR 0.00 4

2 3

1 2:11 618: 15 2: ll 618: 14

)- )

1

) EAF ) 9.44 4 0 0: 0 0: 0 )

5 0 0: 0 0: 0 ) FOF ] 0.00 6 0 0: 0 0: 0 )-

A 1 93:59 53:20 ] MOF ] 0.29 p 0 0: 0 0: 0 ]"

E 0 0: 0 0: 0 ] POF ] 90.26 f 0 0: 0 0: 0 )-

EFDHRS ++] 0: 0]

TOTAL 3 714:25 673:45 TOTAL NUMBER OF HOT CYCLES.....=

TOTAL NUMBER OF COLD CYCLES....=

1 SERVICE HOURS ....= 123:34 1

TOTAL NUMBER OF X CYCLES....= 0 TOTAL NUMBER OF CYCLES.........= 2 EQUIVALENT FORCED DERATED 0 SELECTED OUTAGE TYPES HOURS ON RESERVE SHUTDOWN FOR THIS REPORT

] 1

- FULL FORCED ] 2 - FULL MAINT. ] 3 - FULL PLANNED ]

] 4 RESERVE SHUT. ] 5 - PART. FORCED ] 6 PART. MAINT. ]

] A PART. PLANNED ] 0 - STRTUP FAILURE] E PLANNED EXT. )

] F - PARTIAL PLANNED EXTENSION

h c

-hh ~

t

~ ~ ~ ~ht~ 'Weh hy. h

6/ 8/93 FLORIDA POWER & LIGHT COMPANY 5/ 1/93 TO 5/31/93

) ) ]

) ITEM ] UNITS ) NPTP3 ) NPTP4 ] TOTAL ]

) ) ) -)- ] ]

) ) ) ) ) )

] 01 ]GENERATION ] MWH] 530845] 33860] 564705]

) ] ] )

) 02 ) AUXILLARIES MWH) 24891) 7523] 32414]

) ] ) ) ) )

] 03 ]NET OUTPUT ] MWH] 505954] 26337] 532291 ]

)- ] ) ) )

] 04 ] CAPACITY FACTOR ] 0) 102. I 1] 5.32] 53.71]

)" ) ) ) ) )

] 05 ] NET OUTPUT FACTOR ] 5] 102. 11] 37.45] 92.90)

) )- ) ]

) 06 ]FUEL CONSUMED ] MBTU] 5580445.] 402812.] 5983257.]

) ) ] ) )

) 07 ] UN I T OPERATION ]HRS.MIN] 744.00] 123.34) 744.00)

)- ) -----)" ) ] ")

] 08 ]MW USED OFF LINE ] MWH] 0] 4486] 4486]

)"-)- ) ) ) ) )

) 09 ]NET HEATRATE ]BTU/KWH] 11029.6] 15294.5] 11240.6]

]----]- ) ) ) )

] 10 ]AVG NET OPER HEATRATE ]BTU/KWH] 11029.6] 13068.6] 146. 6)

)----) I ) ) )

1 1

]

)

ll- )BURNUP ) EFPH] 743.60] 53.60]

) ) ) ) ) ]

12 ]ACCUMULATED BURNUP ] EFPH] 3956.00] 53.60)

)

)" -] -)-------) )

24241.00] 8516.00]

)- )

] 13 ]BORON ] PPM]

) ) )

14 ]EQUIV BBL FUEL CONSUMED ] BBL] 882981.8] 63736.1] 946717.9)

)

)-- )- -)- ) ) ) 1

] 15 ]OUTPUT PER EQUIV BBL ]KWH/BBL] 573.0] 413. 2] 562.2]

] ) -)---"---] ) )

) 16 )STEAM PRESSURE(THROTTLE) ] PSI) 851] 899]

)---"I ) ] ) )

] 17 )FDWTR TEMP(STM GEN) ) F) 431] 340]

)- I ) ] ]

) 18 MAKE UP WTR ] GAL] 0.0] 0.0] 0.0]

)----)- )

) ) )

] 19 ]CIR WATER-MAX/MIN INLET ) F) 86, 72] 83, 0)

) ) ] )

] 20 ]CIR WATER-MAX/MIN OUTLET ) F) 100, 90] 94, 0]

]- ) ) ) )

] 21 )COND BACK PRESS ) IN(HG) ] 2.74) 1.41]

) )

) ] UNIT POWER STARTUP HSB HSD CSD REFUEL ]

) 22 03 744.00 0.00 0.00 0.00 0.00 0.00 ]

124. 81.50 36.09 13.36 228.44

- --- - "259.30 04

) ) 11

- - ))

1040]

] 23 )PLANT-MAX HOUR GEN.OUTPUT,HR

] )

]MWH,HRS]

] ) -) -- - 980]

-) ""- 600, 600]

-- -)

) 25 ]PLANT POWER FACTOR 0] 0.00)

-) --"--

)

) ) ) ---)

] 26 ]WESTINGHOUSE HTRT ]BTU/KWH] 11029.55] 12351. 33] 11109.59]

]- ] ) ) )

) 27 ]DATE STA MX HOUR GEN

) )

)

-)- -- 5/29/93)

-"-"-)

28 )DATE STA MX HOUR OUT ] 5/29/93]

) ) ] - ) ]

COMMENTS

2 P "M2

'M tub'22, b

Ml IP P

Ih Pl h il ~ M PM*

2 M

P M

}M"

~h .~ h M ~ ' P ~ ~

~ M l~ MMP P ~ ~,M ~, 2 h ~M MM MP* MaCP M l .P, P MMMM

6/ 8/93 FLORIDA POWER 8 LIGHT COMPANY 5/ 1/93 TO 5/31/93

) ) )

] ITEM ] UN I TS ] PSL1 PSL2 ] TOTAL ]

) ) )

) 1 ) 1

] 01 ] GENERATION ] MWH] 0] 516980) 516980]

) 1 1

] 02 ]AUXILLARIES ] 6703) '32264] 38967) 1--- "- --"--]--"--1 -----3-"- -] "-

MWH]

--"-)

] 03 ]NET OUTPUT -6703) 484716] 478013]

I MWH]

--]- -")

] 04 ] CAPACITY FACTOR 0.00] 77.65) 38.29]

1-- ] 1 ) )

] 05 )NET OUTPUT FACTOR 0.00] 93.86] 93.86]

) ) ) ]

) 06 ]FUEL CONSUMED ]

-)--"" MBTU]

") 0.] 5371384.] 5371384. ]

)--"-)- ] ) )

0.00] 620.45) 07 ) UNIT OPERATION

) --"-)--

1 ]HRS.MIN]

)- -- -]- 620.45]

-- ]

] 08 LINE 6703] 4119] 108223

)- --)

)MW USED OFF ) MWH]

) )

0.0) 1081. 5]

] 09 ]NET HEATRATE

)

]BTU/KWH]

)- -- -)- )

1

- -- 11236.9]

-- -)

] 10 ]AVG NET OPER HEATRATE ]BTU/KWH] 0.0] 10988.1] 10988.1)

) "]-

]BURNUP ) EFPH] 0.00] 582.89]

) ) ) ) ]

EFPH] 10607. 12) 5342.81]

3 1- -)-

12 ]ACCUMULATED BURNUP )

] ) ]

13 )BORON ] PPM] 61400.00) 18665.00)

]----)- ] ) -] ]

] 14 ] EQUIV BBL FUEL CONSUMED BBL] 0.0] 849902.6] 849902.6]

)-"--) 1

] 1 1

) 15 ]OUTPUT PER EQUIV BBL ]KWH/BBL] 0.0] 570.3] 562.4)

)--- 1 3 -1

] 16 ]STEAM PRESSURE(THROTTLE) ] PSI] 0) 842)

)--- 1 ]- - 3 ) )

] 17 ]FDWTR TEMP(STM GEN) ) F] 0) 416]

1""" ) ) )

) 18 ] MAKE UP WTR ) GAL] 115877.0] 53165.0) 169042.0]

3 ) ) ) )

) 19 ]CIR WATER-MAX/MIN INLET ] F] 0, 0] 82, 74]

) ) ) ) )

] 20 ]CIR WATER-MAX/MIN OUTLET ) F) 0, 0] 106, 76]

] ) ) ) )

] 21 ]COND BACK PRESS ] IN(HG)] 0.00] 3.231

)- )

) UNIT POWER STARTUP HSB HSD CSD REFUEL ]

) -)

] 22 01 0.00 32. 26 83. 14 49. 15 296.03 283.02 ]

) 02 621. 54 3.20 118. 46 0.00 . 0.00 0.00

] -])

] 23 ]PLANT-MAX HOUR GEN,OUTPUT,HR ]MWH,HRS] 9101 861] 100 100]

) ) ) - -) - ---)

) 25 )PLANT POWER FACTOR )  %) ) 0.00]

) ) -]

)

] 27 ]DATE STA MX HOUR GEN

"]-5/ - 6/93]

]

] 28 ]DATE STA MX HOUR OUT 5/ 6/933 1 ) -]

COMMENTS