ACCEI.ERAT DOCUlVHENT DIST UTION SYSTEM REGULAT INFORMATION DISTRIBUTION jSTEM (RIDS)
ACCESSION. NBR:9306210316 DOC.DATE: 93/05/31 NOTARIZED: NO DOCKET ¹ FACIAL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HERBENICK,G. Florida Power 6 Light Co.
PLUNKETT,T.F. Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for May 1993 for Turkey Point, units 3 a 4.W/930614 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
~ ENCL I SIZE: IS f NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 RAGHAVAN,L 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NR /~ RPEB 1 1 NRR/DRPW/OEAB 1 1 FILE 01 1 1 RGN2 1 1 EXTERNAL: EGS(G BRYCEPJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO, ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14
0 Z
.0. Box 029100,~ Miami, FL, 33102-9100
~
JUN 14 1993 L-93-158 10 CFR 50.36 U. ST Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the May 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/GDH/gh attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant 93062i03ib 930531 05000250 PDR ADOCK PDR R
an FPL Group company
I ~ I, I
1 I'
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT TURKEY POINT 03 DATE JUNE 10 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MAY 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01/93 690 05/02/93 689 05/03/93 687 05/04/93 683 05/05/93 679 05/06/93 677 05/07/93 676 05/08/93 679 05/09/93 681 05/1 0/93 684 05/1 1/93 687 05/1 2/93 686 05/1 3/93 684 05/1 4/93 681 05/1 5/93 680 05/1 6/93 679 05/1 7/93 676 05/1 8/93 674 05/1 9/93 674 05/20/93 674 05/21/93 677 05/22/93 679 05/23/93 679 05/24/93 683 05/25/93 683 05/26/93 680 05/27/93 677 05/28/93 676 05/29/93 677 05/30/93 674 05/31/93 677
'E
~ ~
l
'4
~'
E
> ~
OPERATING DATA REPORT DOCKET NO 50 250 DATE 6/ 1 0/93 COMPLETED BY G. D. HERBENICK TELEPHONE 305-246<<7112 OPERATING STATUS ~
UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: MAY 1993
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE):
693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT'ERIOD: 744 3623 179600.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3506.9 116266.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE 744.0 3470.5 114581. 3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1635535 7521082 237428009
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 530845 2470555 761 12681
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 505954 2353693 71965853
- 19. UNIT SERVICE FACTOR 100.0 95.8 63.8
- 20. UNIT AVAILABILITYFACTOR 100.0 95.8 63.9
- 21. CAPACITY FACTOR (USING MDC NET) 102. 1 97.5 61.2
- 22. CAPACITY FACTOR (USING DER NET) 98. 1 93.7 57. 8
- 23. UNIT FORCED OUTAGE RATE 0.0 4.2 12.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: June 10 1993 COMPLETED BY: G. Herbenick TELEPHONE'05 246-7112 REPORT MONTH MAY 1993 No. Da'ze Duration (Hours)
Reason'ethod of Shutting Event Reactoz'icensee Dovn Reporta Systen Code Code'ause Coupe nant a Corrective Action to Prevent Recurrence N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A P Forced Reason Method Exhibit C Instructions Exhibit I - Sane Source S Scheduled -
A Equipnent Failure 1 - Manual for Preparation of Data
- or Test 2 - Manual serac Entry Sheets Licensee B
C - Maintenance Refueling 3 hutcuaatic Scran Event Report (LER) Pile D - Regulatory restriction 4 - Continued (NDREC 01SI)
E - operator Training a 3 - Load Reduction License Exanination 9 - Other (Explain)
F - hdninistrative C - Operational Error (Explain)
H Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE June 10 1993 COMPLETED BY:G. Herbenick TELEPHONE: 305 246-7112 REPORT MONTE ~Ma 1993 Unit 3 essentially maintained 100% power for the month of May.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT ¹4 DATE JUNE 10 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MAY 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01/93 05/02/93 05/03/93 05/04/93 05/05/93 05/06/93 05/07/93 05/08/93 05/09/93 05/1 0/93 05/1 1/92 05/1 2/93 05/1 3/93 05/1 4/93 05/1 5/93 05/1 6/93 05/1 7/93 05/1 8/93 05/1 9/93 05/20/93 05/21/93 05/22/93 05/23/93 05/24/93 05/25/93 05/26/93 05/27/93 111 05/28/93 282 05/29/93 289 05/30/93 289 05/31/93 289
0 l
f ~ S
OPERATING DATA REPORT DOCKET NO 50 251 DATE 6/ 10/93 COMPLETED BY G. D. HERBENICK TELEPHONE 305-246-7112 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: MAY 1993
- 3. LICENSED 'THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM OEPENOAELE CAPACITY IGROSS M~WE: 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTO- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 744 3623 173332.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 206.0 2581. 3 112419.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
- 14. HOURS GENERATOR ON-LINE 123.6 2490.4 108535.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 118057 5280872 228855207
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 33860 1710795 73069765
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 26337 1624054 691 12995
- 19. UNIT SERVICE FACTOR 16.6 68.7 62. 6
- 20. UNIT AVAILABILITYFACTOR 16.6 68.? 63.0
- 21. CAPACITY FACTOR (USING MDC NET) 5.3 67.3 60.9
- 22. CAPACITY FACTOR (USING OER NET) 5.1 64.7 57.5
- 23. UNIT FORCED OUTAGE RATE 0.0 0.3 11.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
PI l'r
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: TURKEY POINT UNIT 4 DATE: June 10 1993 COMPLETED BY: G. Herbenick TELEPHONE: 305 246-7112 REPORT MONTH MAY 1993 Date Dura'tion (Hours)
Reason'ethod of Shutting Dovn Licensee Fvent ReportS System Code'ause Code'omponent a corrective Action to Prevent Recurrence Reactor 060193 618. 15 N/A RC UNIT 6 SHUTDONN OF SUHEDULED REFUELINU 03 052293 2. 11 N/A TA TURBIÃE OVERSPEED TEST Oa 052093 0.0 N/A RC INSTRU PLUX FAPPINC F Forced Reason Hethod Exhibit C - Instructions Exhibit I - Sane Source s - Scheduled A - Equipment Failure 1 - Nanual for Preparation of Data B - Naintenance or Test 2 - manual Scram Entry Sheets Licensee
- Refueling - Event Report (LER) Pile C
D - Regulatory restriction 3
6 - Automatic Continued Scram (NUREC-0161)
E - rator Training I 5 Load Reduction cense Examination 9 - Other (Explain)
F - Administrative
- Error (Explain) 0 H - Operational Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE JUNE 10 1993 COMPLETED BY:G. D. Herbenick TELEPHONE: 305 246-7112 REPORT MONTH MAY 1993 Unit 4 began a refueling and maintenance outage on April 9 and ended the outage at 1815 Eastern Daylight Savings Time on May 26.
Unit 4 stayed on line the remainder of the month of May.
FLORIDA POWER 8. LIGHT COMPANY DAILY AVERAGE OUTPUT NPTP 5/ 1/93 690 -2 5/ 2/93 689 -2 5/ 3/93 687 -2 5/ 4/93 683 -2 5/ 5/93 679 -2 5/ 6/93 677 -2 5/ 7/93 676 -2 5/ 8/93 679 -2 5/ 9/93 681 -2 5/ 10/93 684 -2 5/11/93 687 -2 5/ 2/93 1 686 -2 5/13/93 684 2 5/ 14/93 681 -1 5/15/93 680 0 5/ 16/93 679 -1 5/ 17/93 676 -1 5/ )8/93 674 -5 5/19/93 674 9 5/20/93 674 -14 5/21/93 677 -19 5/22/93 679 -19 5/23/93 679 -20 5/24/93 683 -22 5/25/93 683 -21 5/26/93 680 -4 5/27/93 677 111 5/28/93 676 282 5/29/93 677 289 5/30/93 674 289 5/31/93 677 289
\ +w OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 6/ 8/93 COMPLETED 8 D. M. BONETT TELEPHONE 407/694/4432 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: MAY 1993
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN, ELECTRICAL RATING (NET MWE): 693 6,0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 0 0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) '70K 0 SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD:. 744 3623 179600.6 12 NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3506.9 116266.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 14.
15.
16.
17.
HOURS GENERATOR ON-LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH) 744.0 0
1635535 0'~03470.5 7521082 114581. 3
/PI 'g 237428009 a
GROSS ELECTRICAL ENERGY GENERATED (MWH) 530845 2470555 761 1268 'I
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 505954 2353693 71965853
- 19. UNIT SERVICE FACTOR 100.0 95.8 63.8
- 20. UNIT AVAILABILITYFACTOR 100.0 95.8 63.9
- 21. CAPACITY FACTOR (USING MDC NET) 102. 1 97.5 61. 2
- 22. CAPACITY FACTOR (USING DER NET) 98.1 93.7 57.8
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
~IP.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
I' 5
gt
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 6/ 8/93 COMPLETED BY D. M. BONETT TELEPHONE 407/694/4432 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: MAY 1993
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 744 3623 173332.0 n
k<<
l4 BZ8 zg 12.
/Pg/3.ag ~/0258$ '7 'gg~ pig.q-NUMBER OF HOURS REACTOR WAS CRITICAL 206.0 2581. 3 112419.9 13.
14.
15.
16.
17.
REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON-LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)
GROSS ELECTRICAL ENERGY GENERATED (MWH)
~O 0.0 123.6 118057 33860 0.0 2490.4 0.0 5280872 1710795 166. 6 108535.7 777M 228855207 73069765 18.
19.
NET ELECTRICAL ENERGY GENERATED (MWH)
UNIT SERVICE FACTOR 26337 16.6 1624054 68.7 69112995
- 62. 6
//, g
- 20. UNIT AVAILABILITYFACTOR 16.6 68.7 63.0
- 21. CAPACITY FACTOR (USING MDC NET) 5.3 67.3 60.9
- 22. CAPACITY FACTOR (USING DER NET) 5.1 64.7 57.5 23.
24.
UNIT FORCED OUTAGE RATE SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS D.O 't) R ~lh nt
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
~l t
4 j +*
6/ 8/93 FLORIDA POWER AND LIGHT COMPANY PAGE 1 OUTAGE REPORT FOR PTP4 PERIOD: MAY THRU MAY 1993 OUTAGE EE I START END MW NUMBER CD Mhl/DD/HH/MN MM/DD/HH/MN TYPE CURT ------ REMARKS --- PERIOD HRS:MN CYCLE 4 2070 4/ 9/23/56 5/26/'18/15 3 666 REFUELING OUTAGE 618: 15 C 5 4460 5/27/10/55 5/27/ 13/ 6 2 666 TURB OVERSPEED TRIP 2: 11 H 6 2040 5/28/ 2/ 0 5/31/23/59 A 378 50% HOLD FLUX MAP 93:59 OUTAGE
SUMMARY
OUT NUMBER OF TOTAL EQUIVALENT TYPE OCCURENCES HOURS:MN HOURS:MN FACTORS 1 0 0: 0 0: 0 ) EFOR 0.00 4
2 3
1 2:11 618: 15 2: ll 618: 14
)- )
1
) EAF ) 9.44 4 0 0: 0 0: 0 )
5 0 0: 0 0: 0 ) FOF ] 0.00 6 0 0: 0 0: 0 )-
A 1 93:59 53:20 ] MOF ] 0.29 p 0 0: 0 0: 0 ]"
E 0 0: 0 0: 0 ] POF ] 90.26 f 0 0: 0 0: 0 )-
EFDHRS ++] 0: 0]
TOTAL 3 714:25 673:45 TOTAL NUMBER OF HOT CYCLES.....=
TOTAL NUMBER OF COLD CYCLES....=
1 SERVICE HOURS ....= 123:34 1
TOTAL NUMBER OF X CYCLES....= 0 TOTAL NUMBER OF CYCLES.........= 2 EQUIVALENT FORCED DERATED 0 SELECTED OUTAGE TYPES HOURS ON RESERVE SHUTDOWN FOR THIS REPORT
] 1
- FULL FORCED ] 2 - FULL MAINT. ] 3 - FULL PLANNED ]
] 4 RESERVE SHUT. ] 5 - PART. FORCED ] 6 PART. MAINT. ]
] A PART. PLANNED ] 0 - STRTUP FAILURE] E PLANNED EXT. )
] F - PARTIAL PLANNED EXTENSION
h c
-hh ~
t
~ ~ ~ ~ht~ 'Weh hy. h
6/ 8/93 FLORIDA POWER & LIGHT COMPANY 5/ 1/93 TO 5/31/93
) ) ]
) ITEM ] UNITS ) NPTP3 ) NPTP4 ] TOTAL ]
) ) ) -)- ] ]
) ) ) ) ) )
] 01 ]GENERATION ] MWH] 530845] 33860] 564705]
) ] ] )
) 02 ) AUXILLARIES MWH) 24891) 7523] 32414]
) ] ) ) ) )
] 03 ]NET OUTPUT ] MWH] 505954] 26337] 532291 ]
)- ] ) ) )
] 04 ] CAPACITY FACTOR ] 0) 102. I 1] 5.32] 53.71]
)" ) ) ) ) )
] 05 ] NET OUTPUT FACTOR ] 5] 102. 11] 37.45] 92.90)
) )- ) ]
) 06 ]FUEL CONSUMED ] MBTU] 5580445.] 402812.] 5983257.]
) ) ] ) )
) 07 ] UN I T OPERATION ]HRS.MIN] 744.00] 123.34) 744.00)
)- ) -----)" ) ] ")
] 08 ]MW USED OFF LINE ] MWH] 0] 4486] 4486]
)"-)- ) ) ) ) )
) 09 ]NET HEATRATE ]BTU/KWH] 11029.6] 15294.5] 11240.6]
]----]- ) ) ) )
] 10 ]AVG NET OPER HEATRATE ]BTU/KWH] 11029.6] 13068.6] 146. 6)
)----) I ) ) )
1 1
]
)
ll- )BURNUP ) EFPH] 743.60] 53.60]
) ) ) ) ) ]
12 ]ACCUMULATED BURNUP ] EFPH] 3956.00] 53.60)
)
)" -] -)-------) )
24241.00] 8516.00]
)- )
] 13 ]BORON ] PPM]
) ) )
14 ]EQUIV BBL FUEL CONSUMED ] BBL] 882981.8] 63736.1] 946717.9)
)
)-- )- -)- ) ) ) 1
] 15 ]OUTPUT PER EQUIV BBL ]KWH/BBL] 573.0] 413. 2] 562.2]
] ) -)---"---] ) )
) 16 )STEAM PRESSURE(THROTTLE) ] PSI) 851] 899]
)---"I ) ] ) )
] 17 )FDWTR TEMP(STM GEN) ) F) 431] 340]
)- I ) ] ]
) 18 MAKE UP WTR ] GAL] 0.0] 0.0] 0.0]
)----)- )
) ) )
] 19 ]CIR WATER-MAX/MIN INLET ) F) 86, 72] 83, 0)
) ) ] )
] 20 ]CIR WATER-MAX/MIN OUTLET ) F) 100, 90] 94, 0]
]- ) ) ) )
] 21 )COND BACK PRESS ) IN(HG) ] 2.74) 1.41]
) )
) ] UNIT POWER STARTUP HSB HSD CSD REFUEL ]
) 22 03 744.00 0.00 0.00 0.00 0.00 0.00 ]
124. 81.50 36.09 13.36 228.44
- --- - "259.30 04
) ) 11
- - ))
1040]
] 23 )PLANT-MAX HOUR GEN.OUTPUT,HR
] )
]MWH,HRS]
] ) -) -- - 980]
-) ""- 600, 600]
-- -)
) 25 ]PLANT POWER FACTOR 0] 0.00)
-) --"--
)
) ) ) ---)
] 26 ]WESTINGHOUSE HTRT ]BTU/KWH] 11029.55] 12351. 33] 11109.59]
]- ] ) ) )
) 27 ]DATE STA MX HOUR GEN
) )
)
-)- -- 5/29/93)
-"-"-)
28 )DATE STA MX HOUR OUT ] 5/29/93]
) ) ] - ) ]
COMMENTS
2 P "M2
'M tub'22, b
Ml IP P
Ih Pl h il ~ M PM*
2 M
P M
}M"
~h .~ h M ~ ' P ~ ~
~ M l~ MMP P ~ ~,M ~, 2 h ~M MM MP* MaCP M l .P, P MMMM
6/ 8/93 FLORIDA POWER 8 LIGHT COMPANY 5/ 1/93 TO 5/31/93
) ) )
] ITEM ] UN I TS ] PSL1 PSL2 ] TOTAL ]
) ) )
) 1 ) 1
] 01 ] GENERATION ] MWH] 0] 516980) 516980]
) 1 1
] 02 ]AUXILLARIES ] 6703) '32264] 38967) 1--- "- --"--]--"--1 -----3-"- -] "-
MWH]
--"-)
] 03 ]NET OUTPUT -6703) 484716] 478013]
I MWH]
--]- -")
] 04 ] CAPACITY FACTOR 0.00] 77.65) 38.29]
1-- ] 1 ) )
] 05 )NET OUTPUT FACTOR 0.00] 93.86] 93.86]
) ) ) ]
) 06 ]FUEL CONSUMED ]
-)--"" MBTU]
") 0.] 5371384.] 5371384. ]
)--"-)- ] ) )
0.00] 620.45) 07 ) UNIT OPERATION
) --"-)--
1 ]HRS.MIN]
)- -- -]- 620.45]
-- ]
] 08 LINE 6703] 4119] 108223
)- --)
)MW USED OFF ) MWH]
) )
0.0) 1081. 5]
] 09 ]NET HEATRATE
)
]BTU/KWH]
)- -- -)- )
1
- -- 11236.9]
-- -)
] 10 ]AVG NET OPER HEATRATE ]BTU/KWH] 0.0] 10988.1] 10988.1)
) "]-
]BURNUP ) EFPH] 0.00] 582.89]
) ) ) ) ]
EFPH] 10607. 12) 5342.81]
3 1- -)-
12 ]ACCUMULATED BURNUP )
] ) ]
13 )BORON ] PPM] 61400.00) 18665.00)
]----)- ] ) -] ]
] 14 ] EQUIV BBL FUEL CONSUMED BBL] 0.0] 849902.6] 849902.6]
)-"--) 1
] 1 1
) 15 ]OUTPUT PER EQUIV BBL ]KWH/BBL] 0.0] 570.3] 562.4)
)--- 1 3 -1
] 16 ]STEAM PRESSURE(THROTTLE) ] PSI] 0) 842)
)--- 1 ]- - 3 ) )
] 17 ]FDWTR TEMP(STM GEN) ) F] 0) 416]
1""" ) ) )
) 18 ] MAKE UP WTR ) GAL] 115877.0] 53165.0) 169042.0]
3 ) ) ) )
) 19 ]CIR WATER-MAX/MIN INLET ] F] 0, 0] 82, 74]
) ) ) ) )
] 20 ]CIR WATER-MAX/MIN OUTLET ) F) 0, 0] 106, 76]
] ) ) ) )
] 21 ]COND BACK PRESS ] IN(HG)] 0.00] 3.231
)- )
) UNIT POWER STARTUP HSB HSD CSD REFUEL ]
) -)
] 22 01 0.00 32. 26 83. 14 49. 15 296.03 283.02 ]
) 02 621. 54 3.20 118. 46 0.00 . 0.00 0.00
] -])
] 23 ]PLANT-MAX HOUR GEN,OUTPUT,HR ]MWH,HRS] 9101 861] 100 100]
) ) ) - -) - ---)
) 25 )PLANT POWER FACTOR ) %) ) 0.00]
) ) -]
)
] 27 ]DATE STA MX HOUR GEN
"]-5/ - 6/93]
]
] 28 ]DATE STA MX HOUR OUT 5/ 6/933 1 ) -]
COMMENTS