Monthly Operating Repts for Oct 1992 for Turkey Point,Units 3 & 4.W/921113 Ltr
ML17349A483
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/31/1992
From: Goldie M, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-315, NUDOCS 9211190187
Download: ML17349A483 (16)


Text

i.CCiLZ8.ArZO Orsra.raurIOX OarvrOWSmxnOX SVSrarvr RESDDRORY YNFQRMRTYON DYSTRYBUTYSYSTEM (RYDS)

ACCESSION NBR:9211190187 DOC.DATE: 92/10/31 NOTARIZED: NO DOCKET FACIL:50-.250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey, Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION GOLDIE,M.E. Florida Power 6 Light Co.

PLUNKETT,T.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Oct 1992 for Turkey Point, units 3 & 4.W/921113 ltr.

D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) S NOTES:NRR RAGHAVANFL 05000250 NRR RAGHAVAN,L 05000251/

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME'D2-2 LTTR ENCL PD2-2 LA 3 3 PD 1 1 AULUCK,R 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 ZQ FXI 01 1 1 RGN2 1 1 EXTERNAL: EGSG BRYCEFJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 S

NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOh< Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROh4 DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15

4 P.O. Box 029100, Miami, FL, 33102-9100 NOV 13 1992 L-92-315 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the October 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very t ly yours, gf P T. F. Plunkett Vice President Turkey Point Nuclear TFP/EJW/MEG attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant 3.E i'" 922119'0187 921031 PDR ADOCK 05000250 R PDR an FPL Gcoup company

~A)pl">

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-250 UNIT Turke Point 3 DATE November 10 19 2 COMPLETED BY M.E.Goldie TELEPHONE 305 246-6089 MONTH October 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/92 10/02/92 10/03/92 10/04/92 10/05/92 10/06/92 10/07/92 10/08/92 10/09/92 10/10/92 10/11/92 10/12/92 10/13/92 10/14/92 10/15/92 10/16/92 10/17/92 10/18/92 10/19/92 10/20/92 10/21/92 10/22/92 10/23/92 10/24/92 10/25/92 10/26/92 10/27/92 10/28/92 10/29/92 10/30/92 10/31/92

OPERATING DATA REPORT DOCKET NO 50 250 DATE 11/ 9/92 COMPLETED BY M. E. GOLOIE TELEPHONE 305/246/6089 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: OCTOBER 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE)a 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE I.AST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 745 7320 174513. 6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 5298.7 112024.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 0.0 5281. 6 110493.1
15. UNIT RESFRVE SHUTDOWN HOURS 0.0 0.0 121. 8
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 10152700 228722766
17. GROSS ELECTRICAL ENERGY GENERATEO (MWH) 0 3236870 73255256
18. NEI ELECTRICAL ENERGY GENERATEO (MWH) -1605 3058978 69252064
19. UNIT SERVICE FACTOR 0.0 72.2 63.3
20. UNIT AVAILABILITYFACTOR 0.0 72.2 63.4
21. CAPACITY FACTOR (USING MDC NET) 0.0 62.7 60.6
22. CAPAC11 Y FACTOR (USING DER NET) 0.0 60.3 57.3
23. UNIT FORCED OUTAGE RATE 0.0 17. 1 12. 5
24. SllUTOOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT FND OF REPORT PFRIOD, ESTIMATED DATE OF STARTUP: ll/25/92

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 3

DATE November 10 1992 COMPLETED BY M.Goldie TELEPHONE 305 246-6089 REPORT MONTH October 1992 No Date Type Duration Reasons Method of System Component Cause 4 Corrective (Hours) Shutting Event Reactor'icensee Action to Down Reports Code'C Prevent Recurrence Code'UELXX 13 921001 745.0 N/A Unit 3 Shutdown for scheduled Refueling F Forced Reason Method Exhibit G - Instructions Exhibit 1 Sane Source s scheduled A - Equipment Failure 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Event Report, (LER) File D - Refueling Regulatory restriction 3

4 Automatic Scram Continued (NUREG-0161)

E Operator Training 6 S Load Reduction License Examination 9 Other (Explain)

F Administrative G Operational Error (Explain)

H Other (Explain)

SUMMtkRY OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point Unit 3 DATE November 10 1992 COMPLETED BY:M.E.Goldie TELEPHONE: 305 246-6089 REPORT MONTH October 1992 During October, 1992, Unit 3 has been shut down for completion of its Cycle 13 refueling and maintenance outage.

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4 DATE November 10 1 92 COMPLETED BY M.E.Goldie TELEPHONE 305 246-6089 MONTH October 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/92 72 10/02/92 0 10/03/92 0 10/04/92 0 10/05/92 0 10/06/92 0 10/07/92 0 10/08/92 0 10/09/92 0 10/10/92 0 10/11/92 0 10/12/92 0 10/13/92 0 10/14/92 0 10/15/92 0 10/16/92 0 10/17/92 0 10/18/92 0 10/19/92 0 10/20/92 0 10/21/92 0 10/22/92 0 10/23/92 0 10/24/92 39 10/25/92 314 10/26/92 304 10/27/92 456 10/28/92 681 10/29/92 683 10/30/92 679 10/31/92 678

OPERATING DATA REPORT DOCKET NO 50 251 DATE 1 1/ 12/92 COMPLETED BY M. E. GOLDIE TELEPHONE 305/246/6089 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: OCTOBER 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 B. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 745 7320 168245.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 208.6 5762.2 108374.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 195. 9 5678.0 104581. 4
15. UNIT RESERVE SHUTDOWN HOURS 545.2 545.2 577.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 323846 12123437 220437774
17. GROSS ELECTRICAL ENERGY GENERATEO (MWH) 100055 3879585 70351895
18. NET ELECTRICAL ENERGY GENERATED (MWI-1) 85957 3677895 66529657
19. UNIT SERVICE FACTOR 26.3 77.6 62.2
20. UNIT AVAILABILITYFACTOR 99.5 85.0 62.5
21. CAPACITY FACTOR (USING MDC NET) 17. 3 75.4 60.4
22. CAPACITY FACTOR (USING DER NET) 16. 6 72.5 57. 1
23. UNIT FORCED OUTAGE 'RATE 1.9 16. 1 12. 1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 4 - CYCLE 14 REFUELING OUTAGE; 4/ 10/93
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME Turke Point 4 DATE Novemb r 10 1 2 COMPLETED BY M.Goldie TELEPHONE 305 246-6089 REPORT MONTH October 1992 No Date Type Duration Reason'ethod of System Component cause 4 corrective (Hours) Shutting Event Reactor'icensee code'z Action to Down Reportt Prevent Recurrence code'zzzz 10 921001 3.9 92-009 Unit Shutdown due to Hurricane Andrew.

921001 S 545.2 NIA zz zzzzz Voluntary Unit Shutdown to await FEMA evaluations.

- Method Exhibit - Instructions Exhibit - Source

- Forced F Reason G 1 Same S Scheduled A - Equi)xsent Failure 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Scram Entry Sheets Licensee C Refueling 3 - Automatic Scram Event Report (LER) File D Regulatory restriction 4 Continued (NUREG-0161)

E Operator Training 4 5 Load Reduction License Examination 9 Other (Explain)

F - Administrative G Operational Error (Explain)

H Other (Explain)

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE November 10 1992 COMPLETED BY:M. E. Goldie TELEPHONE: 305 246-6089 REPORT MONTH October 1992 Unit 4 remained shutdown on October 1 for 3.9 hrs due to recovery efforts after Huxricane Andrew.

On October 1, Unit 4 restarted, following recovery from Hurricane Andrew and reached 10.8% power before voluntarily shutting down for FEMA's eval-uation of the State of Florida and'County Emergency Preparedness. Unit 4 remained available for restart, and, upon receipt of FEMA's official finding of reasonable assurance that adequate protective measuxes can and will be taken in the event of radiological emergency, commenced reactor startup on October 24, 1992. Unit 4 reached 100 0 power on October 28, 1992.

On October 5, Unit 4 experienced nel error during system testing.

a liftLER (Ref:

of PCV-4-45SC caused 251-92-008.) .

by person-