MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Turke Point ¹3 DATE Se tember 2 1992 aa) I COMPLETED BY D. N. 8one XO i 694-4432 REPORT MONTH Jul 1992 TELEPHONE 407 IQ ',
CO',
o~f
'no Method of Shutting Ucensee Cause 5 Corrective ON'IIQ Duration Down Event System Component Action to OO, No. Date Type' (Hours) Reason~ Reactor Report>> Code4 Codes Prevent Recurrence OM'UOQ
'QMw Imu 09 920704 0.0 Unit 0 N/A HJ HTEXCH 3 reduced power to perform Turbine Plant Cooling Water Heat Exchanger cleaning.
10 920730 0.0 N/A ZZ ZZZZZZ Unit 3 reduced power to 70% to conserve fuel until the end of the current operating'ycle.
F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) Rie D - Regulatory Restriction 4 - Continued (NUREG-0161)
E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)
G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)
GPERATIti DATA AT DOCViET HO 59 - 259 DATE 9/02/92 COMPLETED BY Di He BOHETT TELEPHOtiE 407/694/4432 OPERATING STATUS li lNIT NANiEl TURHEY POINT UKf 3 2i REPORTIHG PERIODl JULY~ 1992 3o LICENSED THERtIL PGNER (tN) l 2200 4 t(AHBViTE RATDtG (G!tOSS tl'4) l 760 Si OESIGH ELECTRICAL RATING (NET NHE) l 693 6i NAXIHtJtt DEPB(DABLE CAPACITY (GROSS IK)l 699 7o ÃAXINPil DEPENDABLE CAPACITY (HET tIE) l 666 8, IF CHAI(GES OCCUR D CAPACITY RATIOS (IlHS HISER 3 T?ROUG?I 7)
SINCE LAST REPCRT~ GIVE RBKttSl 9o PO/ER LEVEL TO NHICH RESTRIC'lED~ 1F AN (HET %E) 10'EASONS FOR RESTRICTIONS~ IF ANYl NmffHLY "YTD- CUMLATIVE ii. HOURS It( REPORT PERIODl 744 5111 172304<6 12'IBER OF t(OURS RE'ACTOR i(AS CRITICAL 744>0 475iii 111476.4 13'EACTOR RESERVE SHUTDONH HOURS 6i0 0i0 844<4 14i HOURS GENERATOR Otl-LItK 744i0 4734ii 169945e6 15i UNIT RESERVE SHUTDOHH HOURS Oi0 Os0 121>8 16'RGSS THElIAL ENERGY GEtiERATED (N)I) 1420554 '9312073 227882139 17'OSS ELECTRICAL ENERGY GENERATED (HI() 444159 2'981655 72999441 18 NET ELECTRICAL ENERGY GENERATED (lOH) 419984 2824557 69017643 19+ UNIT SERVICE FACTOR 109i6 92<6 63>8 20i UNIT AVAILABILITYFACTGR 100iO 92i6 63i9 21, CAPACITY FACTOR (U2C HX ti6') 84i8 83i0 6io2 22i CAPACITY FACTOR (USING DER HET) Bi>5 79i7 57i8 23'NIT FORCED OUTAGE RATE Oi0 713 12<i 24'HUTDGIS SC)tEOULED OVER NEXT 6 HOHIHS l REFUELIHG OUTAGE SCHWA)ULED TO BEGIN AU"UST 24) 1992i 25'F SHUT ¹tt AT EHO OF RPORT PERIODt ESTI)lATED DATE OF STARTU?l
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE Se tember 9 1992 COMPLETED BY:G. D. Herbenick TELEPHONE: 305 246-7112 On July 5, Unit 3 reduced power to 65% to perform Turbine Plant Cooling Water Heat Exchanger cleaning. On July 6, Unit 3 resumed power at 87%.
On July 10, Unit 3 increased power to 100% for Moisture Carryover Test.
On July 11, Unit 3 resumed operation at 87%.
On July 30, Unit 3 reduced power to 70% to conserve fuel until the end of the current operating cycle. Unit 3 is scheduled to begin a refueling outage on August 24, 1992.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-251 UNiT NAMF Turke Point g4 DATE Se tefiibel 2, BQ D. M. Bonett 1992'OMPLETED REPORT MONTH Jul 1992 TELEPHONE 407- 694" 4432 Method of Shutting Licensee Cause &Corrective Down Event System Component Actionto No. Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Code5 Prevent Recurrence 07 920702 S 0.0 N/A HJ HTEXCH Unit 4 reduced power to clean a Heat Exchanger.
F Forced Reason Method Exhibit G-instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram EntryScheetsUcensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NURES4161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error (Explain) Exhibit1-Same Source H - Other(Explain)
GPERATIHG DATA k .cT DOMT t(0 59 - 251 DATE 9/82/92 CONPLETED BY Do Ni BOtKTT TELEPHONE 407/694/4432 OPERATIC STATUS lo MT NANEi TUtlNEY POINT UiVVf 4 2i REPORTING Pt;RIODf JU'r 1992 3i LICENSED THERt(AL PGNER (N)tT) l 2209 4i 5i t(ANH'LATE RATING (GROSS DESIGN ELECTRICAL RATXKG (KET tlat)i 6, NXINlN DEPENDABLE CAPACXTY (ROSS N(E);
NE) f 693 760 699 7i NXINNt DEPEKDABI.E CAPACITY (HET HRE) t 666 Bi IF CHOSES OCCUR IH CAPACITY RATXCS GTBS t(UtlBER 3 THrSUGH 7)
SIKCE LAST REPORT~ GIVE REASONS'i PONER LEVEL TO ftHKH RESTRICTED~ IF AtA'AT N(E) 10i REASONS FOR RESTRICTIOMSt IF AHYi t(ONTtn.Y -YTD- CUtlULATIVE iio HOURS Itl REPORT PERIODt 744 5111 166935i0 12i Nll"BER OF HOURS REACTOR HAS CRITICAL 744iO 4965i7 107578i3 13i REACTOR RESERVE SHUTDO'ntt HDURS OiO OiO 165i6 inc tQiRS CENERATOR GH-LIt(E 744,8 4931i9 103835i2 15i UHKT RESrJNE SHUTDOHN HOURS OiO OiO 32ii 16i GROSS THERiiAL ENERGY GEttERATED (N)lH) 1613537 10735803 219059149 17i GROSS ELECTRICAL ENERGY GENERATED (tM) 598389 3452530 69924849 18i NET ELECTRICAL ENERGY GENERATED (l5H) 483922 3287E85 66139647 19i INIT SBSICE FACTOR 109iO 96i5 62i5 20i Ut(IT AVAILABILITYFACTOR 109i0 96i5 62i6 21i CAPACITY FACTOR (URIC tlX tET) 97i7 96.6 69i9 22i CAPACITY FACTOR (USING DER HET) 93i9 92i8 57i5 23 UNIT FORCED OUTA'X RATE 8iO 3i5 1iin 24i StlUTDGHiiiS SCHEDULED OVER NEXT 6 t(Gt(THS l 25, IF SHUT DOE( AT EHD OF REPORT PERIOD ESTIt(ATED DATE OF STARTUPt
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE Se tember 9 1992 COMPLETED BY:G. D. Herbenick TELEPHONE'05 246-7112 On July 3, Unit 4 reduced power to 62.8% to clean a Heat Exchanger.
On July 4, Unit 4 returned to 100% power and maintained 100% power for the remainder of July.