Corrected Monthly Operating Repts for Jul 1992 for Turkey Point Units 3 & 4
ML17349A379
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/31/1992
From: Bonett D
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17349A381 List:
References
NUDOCS 9209210114
Download: ML17349A379 (10)


Text

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Turke Point ¹3 DATE Se tember 2 1992 aa) I COMPLETED BY D. N. 8one XO i 694-4432 REPORT MONTH Jul 1992 TELEPHONE 407 IQ ',

CO',

o~f

'no Method of Shutting Ucensee Cause 5 Corrective ON'IIQ Duration Down Event System Component Action to OO, No. Date Type' (Hours) Reason~ Reactor Report>> Code4 Codes Prevent Recurrence OM'UOQ

'QMw Imu 09 920704 0.0 Unit 0 N/A HJ HTEXCH 3 reduced power to perform Turbine Plant Cooling Water Heat Exchanger cleaning.

10 920730 0.0 N/A ZZ ZZZZZZ Unit 3 reduced power to 70% to conserve fuel until the end of the current operating'ycle.

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) Rie D - Regulatory Restriction 4 - Continued (NUREG-0161)

E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)

GPERATIti DATA AT DOCViET HO 59 - 259 DATE 9/02/92 COMPLETED BY Di He BOHETT TELEPHOtiE 407/694/4432 OPERATING STATUS li lNIT NANiEl TURHEY POINT UKf 3 2i REPORTIHG PERIODl JULY~ 1992 3o LICENSED THERtIL PGNER (tN) l 2200 4 t(AHBViTE RATDtG (G!tOSS tl'4) l 760 Si OESIGH ELECTRICAL RATING (NET NHE) l 693 6i NAXIHtJtt DEPB(DABLE CAPACITY (GROSS IK)l 699 7o ÃAXINPil DEPENDABLE CAPACITY (HET tIE) l 666 8, IF CHAI(GES OCCUR D CAPACITY RATIOS (IlHS HISER 3 T?ROUG?I 7)

SINCE LAST REPCRT~ GIVE RBKttSl 9o PO/ER LEVEL TO NHICH RESTRIC'lED~ 1F AN (HET %E) 10'EASONS FOR RESTRICTIONS~ IF ANYl NmffHLY "YTD- CUMLATIVE ii. HOURS It( REPORT PERIODl 744 5111 172304<6 12'IBER OF t(OURS RE'ACTOR i(AS CRITICAL 744>0 475iii 111476.4 13'EACTOR RESERVE SHUTDONH HOURS 6i0 0i0 844<4 14i HOURS GENERATOR Otl-LItK 744i0 4734ii 169945e6 15i UNIT RESERVE SHUTDOHH HOURS Oi0 Os0 121>8 16'RGSS THElIAL ENERGY GEtiERATED (N)I) 1420554 '9312073 227882139 17'OSS ELECTRICAL ENERGY GENERATED (HI() 444159 2'981655 72999441 18 NET ELECTRICAL ENERGY GENERATED (lOH) 419984 2824557 69017643 19+ UNIT SERVICE FACTOR 109i6 92<6 63>8 20i UNIT AVAILABILITYFACTGR 100iO 92i6 63i9 21, CAPACITY FACTOR (U2C HX ti6') 84i8 83i0 6io2 22i CAPACITY FACTOR (USING DER HET) Bi>5 79i7 57i8 23'NIT FORCED OUTAGE RATE Oi0 713 12<i 24'HUTDGIS SC)tEOULED OVER NEXT 6 HOHIHS l REFUELIHG OUTAGE SCHWA)ULED TO BEGIN AU"UST 24) 1992i 25'F SHUT ¹tt AT EHO OF RPORT PERIODt ESTI)lATED DATE OF STARTU?l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE Se tember 9 1992 COMPLETED BY:G. D. Herbenick TELEPHONE: 305 246-7112 On July 5, Unit 3 reduced power to 65% to perform Turbine Plant Cooling Water Heat Exchanger cleaning. On July 6, Unit 3 resumed power at 87%.

On July 10, Unit 3 increased power to 100% for Moisture Carryover Test.

On July 11, Unit 3 resumed operation at 87%.

On July 30, Unit 3 reduced power to 70% to conserve fuel until the end of the current operating cycle. Unit 3 is scheduled to begin a refueling outage on August 24, 1992.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-251 UNiT NAMF Turke Point g4 DATE Se tefiibel 2, BQ D. M. Bonett 1992'OMPLETED REPORT MONTH Jul 1992 TELEPHONE 407- 694" 4432 Method of Shutting Licensee Cause &Corrective Down Event System Component Actionto No. Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Code5 Prevent Recurrence 07 920702 S 0.0 N/A HJ HTEXCH Unit 4 reduced power to clean a Heat Exchanger.

F Forced Reason Method Exhibit G-instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram EntryScheetsUcensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NURES4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other(Explain)

GPERATIHG DATA k .cT DOMT t(0 59 - 251 DATE 9/82/92 CONPLETED BY Do Ni BOtKTT TELEPHONE 407/694/4432 OPERATIC STATUS lo MT NANEi TUtlNEY POINT UiVVf 4 2i REPORTING Pt;RIODf JU'r 1992 3i LICENSED THERt(AL PGNER (N)tT) l 2209 4i 5i t(ANH'LATE RATING (GROSS DESIGN ELECTRICAL RATXKG (KET tlat)i 6, NXINlN DEPENDABLE CAPACXTY (ROSS N(E);

NE) f 693 760 699 7i NXINNt DEPEKDABI.E CAPACITY (HET HRE) t 666 Bi IF CHOSES OCCUR IH CAPACITY RATXCS GTBS t(UtlBER 3 THrSUGH 7)

SIKCE LAST REPORT~ GIVE REASONS'i PONER LEVEL TO ftHKH RESTRICTED~ IF AtA'AT N(E) 10i REASONS FOR RESTRICTIOMSt IF AHYi t(ONTtn.Y -YTD- CUtlULATIVE iio HOURS Itl REPORT PERIODt 744 5111 166935i0 12i Nll"BER OF HOURS REACTOR HAS CRITICAL 744iO 4965i7 107578i3 13i REACTOR RESERVE SHUTDO'ntt HDURS OiO OiO 165i6 inc tQiRS CENERATOR GH-LIt(E 744,8 4931i9 103835i2 15i UHKT RESrJNE SHUTDOHN HOURS OiO OiO 32ii 16i GROSS THERiiAL ENERGY GEttERATED (N)lH) 1613537 10735803 219059149 17i GROSS ELECTRICAL ENERGY GENERATED (tM) 598389 3452530 69924849 18i NET ELECTRICAL ENERGY GENERATED (l5H) 483922 3287E85 66139647 19i INIT SBSICE FACTOR 109iO 96i5 62i5 20i Ut(IT AVAILABILITYFACTOR 109i0 96i5 62i6 21i CAPACITY FACTOR (URIC tlX tET) 97i7 96.6 69i9 22i CAPACITY FACTOR (USING DER HET) 93i9 92i8 57i5 23 UNIT FORCED OUTA'X RATE 8iO 3i5 1iin 24i StlUTDGHiiiS SCHEDULED OVER NEXT 6 t(Gt(THS l 25, IF SHUT DOE( AT EHD OF REPORT PERIOD ESTIt(ATED DATE OF STARTUPt

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE Se tember 9 1992 COMPLETED BY:G. D. Herbenick TELEPHONE'05 246-7112 On July 3, Unit 4 reduced power to 62.8% to clean a Heat Exchanger.

On July 4, Unit 4 returned to 100% power and maintained 100% power for the remainder of July.