Monthly Operating Repts for August 1992 for Turkey Point Units 3 & 4.W/920915 Ltr
ML17349A376
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/1992
From: Bonett D, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-265, NUDOCS 9209180333
Download: ML17349A376 (15)


Text

'", <ccrc.za.~rzo or vmamrox omro~sra.~rroX SvSrzrvr REGULATO INFORMATION DISTRIBUTION'STEM (RZDS)

ACCESSION NBR:9209180333 DOC,DATE: 92/08/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION BONETT,D.M. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for August 1992 for Turkey Point.

W/920915 1

ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR 1 ENCL / SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:NRR RAGHAVAN,L 05000250 NRR RAGHAVANFL 05000251 i RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCKFR 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1

~~Q RUG FILE EB10 01 1

1 1

1 NRR/DOEA/OEAB RGN2 1

'1 1

1 EXTERNAL: EG&G BRYCEFJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER'OF COPIES REQUIRED: LTTR 15 ENCL 15

.. Box 029100, Miami, FL, 33102-9100 L-92-265 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the recpxirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the August 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/GS attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant k

q20918O3 ~g< q2083i /pgJ PDR"~'ADOC~ <5O<ppsO pDR an FPL Group company

l J BPA." <

AVERAGE DAlLY UNIT POWER LEVEL DOCKET N0.50-250 UNIT Turke Point 3 DATE Se tember 10 1992 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 AVERAGE DAILY POWER LEVEL (MWe-Net) 08/01/92 441 08/02/92 440 08/03/92 444 08/04/92 448 08/05/92 443 08/06/92 447 08/07/92 450 08/08/92 442 08/09/92 443 08/10/92 442 08/11/92 436 08/12/92 438 08/13/92 425 08/14/92 332 08/15/92 443 08/16/92 448 08/17/92 446 08/18/92 438 08/19/92 437 08/20/92 440 08/21/92 440 08/22/92 442 08/23/92 342 08/24/92 0 08/25/92 0 08/26/92 0 08/27/92 0 08/28/92 0 08/29/92 0 08/30/92 0 08/31/92 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO ~ 50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE SEPTEMBER 9 1992 COMPLETED BY: D.M. BONETT TELEPHONE: 407 694-4432 Ho. Date Type'uration Reason* Method of System Code'ause Code'omponent 5 Corrective (Hours) Shutting Event Action to Reactor'icensee Down Reports Prevent Recurrence 920813 0.0 H/A HJ HTEXCH Unit 3 reduced power for waterbox cleaning.

12 920823 S 196.5 92-009 ZZ ZZZZZ Unit 3 was shutdown due to Hurricane Andrew. Shutdown extended to repair damage caused by Andrew.

F - Forced Reason Hethod Exhibit G - Instructions Exhibit 1 - Same Source 1 - Hanual S - Scheduled A - Equipment Failure for Preparation of Data 8 - Haintenance or Test 2 - Hanual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (HUREG-0161)

E - Operator Training II 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

a t

)U tl 4

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 9/ 9/92 COMPLETED BY D. M. BONETT TELEPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: AUGUST 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE. REASONS:

9. POWER LEVEL TO WHICH RESTRICTED o IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTO- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 5855 173048.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 547.7 5298.7 112024.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 547.5 5281. 6 110493.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 840627 10152700 228722766
17. GROSS ELECTRICAL ENERGY GENERATEO (MWH) 255815 3236870 73255256
18. NET ELFCTRICAL ENERGY GENERATED (MWH) 238601 3063158 69256244

>9. UNIT SERVICE FACTOR 73.6 90.2 63.9 ZO ~ UNIT AVAILABILITYFACTOR 73.6 90.2 63.9 2 I. CAPACITY FACTOR (USING MDC NET) 48.2 78.6 61. 2

22. capAGITY FacTDR (UsING DER NET) 46.3 75.5 57.8
73. UNIT FORCED OUTAGE RATE 0.0 6.6 12.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNll' IS CURRENI'LY IN AN OUTAGE CYCLE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/29/92

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO 50-250 UNIT Turne Point Unit 3 DATE Se temher 9 1992 COMPLETED BY:D. M. Bonett TELEPHONE: 407 694-4432 On August 13, Unit 3 reduced power to perform waterbox cleaning.

On August 23, as required by procedure, Unit 3 shutdown due to a hurricane warning.

The unit will remain shutdown and commence a refueling outage originally scheduled to begin on August 24, 1992.

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4 DATE Se tember 10 1992 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH Au ust 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 08/01/92 655 08/02/92 655 08/03/92 660 08/04/92 665 08/05/92 662 08/06/92 594 08/07/92 443 08/08/92 513 08/09/92 398 08/10/92 406 08/11/92 401 08/12/92 403 08/13/92 404 08/14/92 384 08/15/92 474 08/16/92 660 08/17/92 658 08/18/92 654 08/19/92 655 08/20/92 654 08/21/92 656 08/22/92 659 08/23/92 574 08/24/92 0 08/25/92 0 08/26/92 0 08/27/92 0 08/28/92 0 08/29/92 0 08/30/92 0 08/31/92 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO ~ 50-251 UNIT NAME: TURKEY POINT UNIT 4 DATE: SEPTEMBER 9 1992 COMPLETED BY: D.M. BONETT TELEPHONE: 407 694-4432 No. Date Type'uration Reason* Hethod of Licensee System Component Cause 8 Corrective (Hours) Shutting Event Code'A Codes Action to Down Report¹ Prevent Recurrence Reactor*

08 920806 0.0 N/A TURBIN Unit 4 reduced power to perform turbine valve testing.

09 920808 0.0 N/A HJ HTEXCH Unit 4 reduced power to repair a leak in the 3B Feedwater Heater.

10 920823 F 193.8 92-009 ZZ ZZZZZ Unit 4 was shutdown due to Hurricane Andrew. Shutdown extended to repair damage caused by Andrew.

F - Forced Reason Hethod Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1

- Hanual for Preparation of Data 8 - Haintenance or Test 2 - Hanuai Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 8 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

1

/

V 4

OPERATING DATA REPORT DOCKET NO 50 251 DATE 9/09/92 COMPLETED BY D. M. BONETT TELFPHONE 407/694/4432 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: AUGUST 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 5855 166780.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 550.7 5516.4 108129. 1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 550.2 5482. 1 104385.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
16. GROSS THERMAL ENERGY GENERATED (MWH) 1063788 11799592 220113929
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 327000 3779530 70251840
18. NET ELECTRICAL ENERGY GENERATED (MWH) 309156 3597041 66448803
19. UNIT SERVICE FACTOR 74.0 93.6 62.6
20. UNIT AVAILABILITYFACTOR 74.0 93.6 62.6 2'I . CAPACITY FACTOR (USING MDC NET) 62.4 92.2 60.9
22. CAPACITY FACTOR (USING DER NET) 60.0 88.7 57.5
23. UNIT FORCED OUTAGE RATE 26.0 6.2 11.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 09/30/92

~ ~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point Unit 4 DATE Se tember 9 1992 COMPLETED BY:D. M. Bonett TELEPHONE: 407 694-4432 On August 6, Unit 4 reduced power to perfom turbine valve testing.

On August 8, the unit reduced power to repair a leak in the 3B Feedwater Heater.

Unit 4 was shutdown on August 23 due to Hurricane Andrew.