Monthly Operating Repts for Jul 1992 for Turkey Point Units 3 & 4.W/920813 Ltr
ML17349A336
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/31/1992
From: Herbenick G, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-227, NUDOCS 9208200259
Download: ML17349A336 (15)


Text

., ACC1 LERA I'ED I+TI'IBUTIOY'EIIO~RATIONSYSTEM ACCESS I QN NBR: 9208200259 DOC. DATE: 92/07/31 NGTAR X ZED: NO DOCKET FACXL: 50-250 Turkey Point Plant Unit 3. Florida Poeer and Light C 05000250 50-251 Tuv keg Point Planti Unit 4>, Florida Poeer and Light C 05000251 AUTH. NANE AUTHOR AFFILXATXON HERBENICKi G. D. Florida Power 8c Light Co.

PLUNKETT> T. F. Florida Power Light Co.Zc RECIP. NANE RECIPIENT AFFILIATXGN

SUBJECT:

Nonthlg. operating repts for Jul 1992 for Turkey Point units 3 S. 4. N/'F20813 itr.

DISTRXBUTIGN CODE: IE24D CGPXES RECEIVED: LTR ENCL SIZE:

TITLE: Nonthlg Operating Report (per Tech Specs)

S NOTES: NRR RAGHAVANiL 05000250 NRR RAGHAVANiL 05000251/

RECXPIENT COPIES RECIP XENT COPIES ID CODE/NANE LTTR ENCL ID CODE/NANE LTTR ENCL PD2-2'A 3 3 PD2-2 PD 1 AULUCKi R 1 INTERNAL: *EOD/DOA 1 1 AEOD/DSP/TPAB N R/DLR LP EB 10 1 I NRR/DOEA/GEAB 1 1 REG FIL 01 1 1 RGN2 1 EXTERNAL: EGSG BRYCE> J. H 1 1 NRC PDR 1 1 NSIC 1 1 NOTES:

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iYASTE! CONTACT THE DOCUMENT COYTROL DESK.

ROOh'I Pl-37 (EXT. 504-20i.:: ) TO ELIMIYATEYOUR NAME FROhf DISTRIBUTION LISTS FOR DOCUMENT~'".OU DON'T iNEED!

TOTAL NUMBER OF COPXES REQUIRED: LTTR 15 ENCL 15

P.O. Box 029100, Miami, Fl, 33102-9100

~UB ': 1992 AUG 18 1992 L-92-227 10 CFR 50.36 U ~ S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020r attached are the July 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T ~ F; Plunkett Vice President Turkey Point Nuclear TFP/GDH/gh attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross C. Butcher, Senior Resident Inspectorr USNRCr Turkey Point Plant

',PDR R 'DR

'~'720820025'rr 920731

'." ADOCK 05000250 an FPL Group company

~zpg)

p d'

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-250 UNIT Turke Point 3 DATE Au ust 10 1992 COMPLETED BY G. D. Herbenick TELEPHONE 305 246-7112 AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/92 577 07/02/92 576 07/03/92 572 07/04/92 510 07/05/92 432 07/06/92 577 07/07/92 576 07/08/92 572 07/09/92 615 07/10/92 650 07/11/92 577 07/12/92 581 07/13/92 582 07/14/92 582 07/15/92 575 07/16/92 570 07/17/92 571 07/18/92 579 07/19/92 580 07/20/92 577 07/21/92 577 07/22/92 579 07/23/92 577 07/24/92 577 07/25/92 576 07/26/92 574 07/27/92 572 07/28/92 567 07/29/92 558 07/30/92 468 07/31/92 445

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 8/ 7/92 COMPLETED BY G. HERBENICK TELEPHONE 305/246/7112 OPERATING STATUS

l. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: JUNE 1992
3. LICENSED THERMAL POWER (MWT): 2200 4, NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)( 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 4367 171560. 6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4007.1 110732.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 720.0 3990.1 I 0920 I. 6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1384481 7891519 226461585
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 431590 2536905 72555291
18. NET ELECTRICAL ENERGY GENERATED (MWH) 408404 2404573 68597659
19. UNIT SERVICE FACTOR 100.0 91. 4 63.7
20. UNIT AVAILABILITYFACTOR 100. 0 91.4 63.7
21. CAPACITY FACTOR (USING MDC NET) 85.2 82.7 61. 1
22. CAPACITY FACTOR (USING DER NET) 81.9 79.5 57.7
23. UNIT FORCED OUTAGE RATE 0.0 7 3 12. 1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING OUTAGE SCHEDULED TO BEGIN AUGUST 24, 1992
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNlT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNlT NAME Turke Point "3 DATE Au ust 10 1992 COMPLETED BY G. Herbenick TELEPHONE 305 246-7112 No. Date Duration Reason* Method of Licensee System Conponent Cause & Corrective Type'/A (Hours) Shutting Event Codes Action to Dawn Reports code'/A Prevent Recurrence Reactors N/A N/A N/A N/A N/A N/A N/A F Forced Reason Nethod Exhibit G - Instructions Exhibit Sa=e Source S scheduled A - Equipnent Failure 1 - Nanual for Preparation of Data 1

B Naintenance or Test 2 Nanual Scran Entry Sheets Licensee C Refueling 3 Autonatic Scran Event Report, (LER) File D - Regulatory restriction 4 Continued (NUREG-0161)

E - Operator Training 6 5 Load Reduction License Examination 9 Other (Explain)

F - Adninistrative G Operational Error (Explain)

H Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE Au ust 10 1992 COMPLETED BY:G. D. Herbenick TELEPHONE: 305 246-7112 On July 5, Unit 3 reduced power to 65% to perform Turbine Plant Cooling Water Heat Exchanger cleaning. On July 6, Unit 3 resumed power at 87%.

On July 10I Unit 3 increased power to 100% for Moisture Carryover Test.

On July 11, Unit 3 resumed operation at 87%.

On July 30, Unit 3 reduced power to 70% to conserve fuel until the end of the current operating cycle. Unit 3 is scheduled to begin a refueling outage on August 24, 1992.

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4 DATE Au ust 10 1992 COMPLETED BY G. D. Herbenick TELEPHONE 305 246-7112 AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/92 657 07/02/92 588 07/03/92 418 07/04/92 654 07/05/92 658 07/06/92 660 07/07/92 661 07/08/92 657 07/09/92 658 07/10/92 658 07/11/92 '657 07/12/92 659 07/13/92 663 07/14/92 669 07/15/92 663 07/16/92 662 07/17/92 662 07/18/92 66S 07/19/92 666 07/20/92 666 07/21/92 666 07/22/92 641 07/23/92 664 07/24/92 666 07/25/92 665 07/26/92 664 07/27/92 662 07/28/92 660 07/29/92 659 07/30/92 660 07/31/92 657

OPERATING DATA REPORT DOCKET NO 50 251 DATE 8/ 7/92 COMPLETED BY G. HERBENICK TELEPHONE 305/246/7112 OPERATING STATUS

l. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: JUNE 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE 1 l. HOURS IN REPORT PERIOD: 720 4367 165292.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4221.7 106834.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 720.0 4187.9 103091.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
16. GROSS THERMAL ENERGY GENERATED (MWH) 1586874 9122266 217436603
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 505360 2944150 69416460
18. NET ELECTRICAL ENERGY GENERATED (MWH) 481745 2803963 65655725
19. UNIT SERVICE FACTOR 100. 0 95.9 62.4
20. UNIT AVAILABILITYFACTOR 100. 0 95.9 62.4
21. CAPACITY FACTOR (USING MDC NET) 100. 5 96.4 60.7
22. CAPACITY FACTOR (USING DER NET) 96.5 92.7 57.3
23. UNIT FORCED OUTAGE RATE 0.0 3.5 11.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 DATE Au ust 10 1992 COMPLETED BY G. Herbenick TELEPHONE 305 246-7112 No Date Type Duration Reasons Yethod of System Code'omponent Cause 6 Corrective (Hours) Shutting Event Reactor'icensee Codes Action to Down Reportt Prevent Recurrence N/A N/A N/A NIA N/A NIA N/A N/A N/A F Forced Reason Nethod Exhibit G Instructions Exhibit - Same Source S Scheduled A - Equipment Failure 1 - Ymnual for Preparation of Data 1

B Maintenance or Test 2 Nanual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NVREG-0161)

E - Operator Training 6 5 Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

~ T

~

~

~

l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE Au st 10 1992 COMPLETED BY:G. D. Herbenick TELEPHONE: 305 246-7112 On July 3, Unit 4 reduced power to 62.8% to clean a Heat Exchanger.

On July 4, Unit 4 returned to 100% power and maintained 100% power for the remainder of July.

P e