Monthly Operating Repts for June 1992 for Turkey Point Units 1 & 2.W/920710 Ltr
ML17349A306
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/30/1992
From: Herbenick G, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-205, NUDOCS 9207200321
Download: ML17349A306 (13)


Text

ACCELERATED DISTRJBUTION DEMONSTRATION SYSTEM REGULATO INFORMATION DISTRIBUTION'STEM (RIDE)

ACCESSiON NBR:9207200321 DOC.DATE: 92/06/30 NOTARIZED: NO DOCKET FACI~:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HERBENICK,G.D. Florida Power 6 Light Co.

PLUNKETT,T.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for June 1992 for Turkey Point Units 1 6 2.W/920710 ltr.

COPIES RECEIVED:LTR SIZE: D DISTRIBUTION CODE: IE24D ENCL TITLE: Monthly Operating Report (per Tech Specs) S NOTES:NRR RAGHAVAN,L 05000250 NRR RAGHAVANFL 05000251 A

RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 D AULUCK,R 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 I PEB10 1 1 NRR/DOEA/OEAB 1 1 REG FIL 01 1 1 RGN2 1 1 EXTERNAL: EGSG BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISI'RIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15

tC P.O. Box 029100, Miami, FL, 33102-9100 JUL i,0 IBB~

L-92-205 10 CFR 50.36 U ~ S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. CD 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the June 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/GDH/gh attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross CD Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant 920720032l'20630 PDR ADOCK 05000250 R PDR an FPL Group company

I I

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-250 UNIT Turke Point 3 DATE Ju1 10 1992 COMPLETED BY G.D.Herbenick TELEPHONE 305 246-7112 MONTH June 1 9 92 AVERAGE DAILY POWER LEVEL (MWe-Net) 06/01/92 560 06/02/92 560 06/03/92 565 06/04/92 569 06/05/92 569 06/06/92 567 06/07/92 567 06/08/92 569 06/09/92 565 06/10/92 559 06/11/92 611 06/12/92 569 06/13/92 569 06/14/92 547 06/15/92 566 06/16/92 567 06/17/92 567 06/18/92 575 06/19/92 57S 06/20/92 575 06/21/92 576 06/22/92 571 06/23/92 574 06/24/92 575 06/25/92 577 06/26/92 573 06/27/92 581 06/28/92 536 06/29/92 499 06/30/92 583

1p OPERATING DATA REPORT DOCKET NO 50 250 DATE 7/ 7/92 COMPLETED BY G. HERBENICK TELEPHONE 305/246/7112 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: JUNE 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
b. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE ll. HOURS IN REPORT

12. NUMBER OF PERIOD: 720 4367 171560. 6 HOURS REACTOR WAS CRITICAL 720.0 4007.1 110732.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 720.0 3990.1 109201. 6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1384481 7891519 226461585
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 431590 2536905 72555291
18. NET ELECTRICAL ENERGY GENERATED (MWH) 408404 2404573 68597659
19. UNIT SERVICE FACTOR 100.0 91.4 63.7
20. UNIT AVAILABILITYFACTOR 100. 0 91.4 63.7
21. CAPACITY FACTOR (USING MDC NET) 85.2 82.7 61. 1
22. CAPACITY FACTOR (USING DER NET) 81.9 79.5 57.7
23. UNIT FORCED OUTAGE RATE 0.0 8.6 12. 1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING OUTAGE SCHEDULED TO BEGIN AUGUST 24 ~ 1992.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME Turke Point 3 DATE Ju1 10 1992 COMPLETED BY G. Herbenick TELEPHONE 305 246-7112 REPORT MONTH June 1992 No. Date Type'uration Reasons Yethod of Licensee System Component Cause 6 Corrective (Hours) Shutting Event Codes Action to Down Reportf Code'B Prevent Recurrence Reactor 920614 1.0 N/A ROD Unit 3 Dropped Rod.

920628 9.3 N/A HX Vnit 3 Water Box Cleaning.

F Forced Reason Yethod Exhibit Instructions Exhlblt - Sane Source 1 - Yanual G 1 S Scheduled A Equipment Failure for Pzepazation of Data B Maintenance or Test 2 Manual scram Entry Sheets Licensee C - Refueling 3 Automatic Scran Event Report (LER) File D Regulatory restriction 4 - Continued (NVREG-0161)

E Operator Tzaining 4 5 Load Reduction License Examination 9 Other (Explain)

F AcL>inl st ra tive G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE Jul 10 1992 COMPLETED BY:G. Herbenick TELEPHONE: 305 246-7112 REPORT MONTH June 1992 Unit 3 is expected to operate at 87% power to conserve fuel until the end of the current operating cycle. Unit 3 is scheduled to begin a refueling outage on August 24, 1992.

On June 14, the Unit 3, Bank D Rod H-12 dropped into core while rods were being moved. Unit 3 stabilized at 68% power and commenced recovery of the dropped rod. The Unit returned to .87%

power that same day.

On June 28I Unit 3 reduced power to 50% to clean two Condenser Water Boxes.

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4 DATE JU1 10 1992 COMPLETED BY G.D. Herbenick TELEPHONE 305 246-7112 MONTH June 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 06/01/92 644 06/02/92 665 06/03/92 670 06/04/92 673 06/05/92 673 06/06/92 673 06/07/92 673 06/08/92 675 06/09/92 672 06/10/92 668 06/11/92 666 06/12/92 663 06/13/92 665 06/14/92 664 06/15/92 663 06/16/92 668 06/17/92 669 06/18/92 668 06/19/92 668 06/20/92 667 06/21/92 668 06/22/92 665 06/23/92 668 06/24/92 673 06/25/92 678 06/26/92 676 06/27/92 672 06/28/92 671 06/29/92 673 06/30/92 663

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 7/ 7/92 COMPLETED BY G. HERBENICK TELEPHONE 305/246/7112 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: JUNE 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT. GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE ll.

12.

HOURS IN REPORT PERIOD: 720 4367 165292.0 NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4221. 7 106834.3

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 720.0 4187.9 103091. 2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
16. GROSS THERMAL ENERGY GENERATED (MWH) 1586874 9122266 217436603 17 . GROSS ELECTRICAL ENERGY GENERATED (MWH) 505360 2944150 69416460
18. NET ELECTRICAL ENERGY GENERATED (MWH) 481745 2803963 65655725 l9. UNIT SERVICE FACTOR 100.0 95.9 62.4
20. UNIT AVAILABILITYFACTOR 100.0 95.9 62.4
21. CAPACITY FACTOR (USING MDC NET) 100.5 96.4 60.7
22. CAPACITY FACTOR (USING OER NET) 96.5 92.7 57.3
23. UNIT FORCED OUTAGE RATE 0.0 4.0 11.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDONNS AND POWER REDUCTj:ONS DOCKET NO. 50-251 UNET NAME Turke Point 4 DATE Ju1 10 1992 COMPLETED BY G. Herbenick TELEPHONE 305 246-7112 REPORT MONTH June 1992 No. Date Duration Method of Licensee Systen Conponent Cause S Corrective (Hours) Reason'/A Shutting Event Codes Action to Down Reports code'/A Prevent Recurrence Re&c'tor N/A N/A N/A N/A N/A N/A N/A UNIT 4 OPERATED AT ESSENTIALLY 100i FOR THE MONTH OF JUNE.

F Forced Reason Method

- Exhibit C - Instructions Exhibit 1 - Sane Source s scheduled A Equi pnent Failure 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Scran Entry Sheets Licensee C - Refueling 3 Autossatic Scran Event Report (LER) File D - Regulatory restriction 4 Continued (NUREG-0161)

E - Operator Training & 5 Load Reduction License Exanination 9 - Other (Explain)

F Adninistrative C - Operational Error (Explain)

H - Other (Explain)

SUMMARY