ACCELERATED DISTRIBUTION DEMONSTPWTION SYSTEM REGULRTCO INFORMATION DISTRIBUTIONSTEM (RIDE)

ACCESSION NBR:9206230168 DOC.DATE: 92/05/31 NOTARIZED:'O DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HERBENICK,G. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for May 1992 for Turkey Point Units 1 & 2.N/920612 ltr.

D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR / ENCL j SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:NRR RAGHAVAN,L 05000250 NRR RAGHAVAN,L 05000251 A

RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 D AULUCK,R 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 RR DLP LPEB10 1 1 NRR/DOEA/OEAB 1 1 REG F 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCEFJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WAS'ONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15 g~l

P.O. Box 0& 00, Miami, FI33102-9100 JUN l 8 tgeg L-92-175 10 CFR 50. 36 U ~ S ~ Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos . 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6 . 9 . 1 . 5, and the guidance of NUREG-0020 r attached are the May 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4 .

Very truly yours,

/P P/uu!Nd lunkett by,u) Pz~~

T ~ F ~ P Vice President Turkey Point Nuclear TFP /GDH attachments cc: Stewart D. Ebneter, Regional Administrator, Region I I, USNRC Ross C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant 9206230 1 68 92053 1

,PDR ADOCK 05000250 R PDR gp 0 an FPL Group company

~ I I

) ~

) )

I

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-250 UNIT Turke Point 3 DATE June 8 1992 COMPLETED BY G.D.Herbenick TELEPHONE 305 246-7112 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01/92 0 05/02/92 0 05/03/92 0 05/04/92 0 05/05/92 0 05/06/92 0 05/07/92 0 05/08/92 0 05/09/92 0 05/10/92 0 05/11/92 0 05/12/92 421 05/13/92 581 05/14/92 577 05/15/92 579 05/16/92 578 05/17/92 580 05/18/92 582 05/19/92 584 05/20/92 583 05/21/92 580 05/22/92 577 05/23/92 577 05/24/92 577 05/25/92 575 05/26/92 572 05/27/92 570 05/28/92 569 05/29/92 570 05/30/92 569 05/31/92 56S

OPERATING DATA REPORT DOCKET NO 50 250 DATE 6/8/92 COMPLETED BY G. HERBENICK TELEPHONE 305/246/7112 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: MAY 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST, REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE 1 1 . HOURS IN REPORT PERIOD: 744 3647 170840.6

12. NUMBER OF HOURS REACTOR WAS CRITICAL 489.4 3287. 1 110012.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844. 4
14. HOURS GENERATOR ON-LINE 479.8 3270. 1 108481. 6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 912262 6507038 225077104
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 287790 2105315 72123701
18. NET ELECTRICAL ENERGY GENERATED (MWH) 270908 1996169 68189255
19. UNIT SERVICE FACTOR 64.5 89.7 63.5
20. UNIT AVAILABILITYFACTOR 64.5 89.7 63.6 54.7 82.2 61.0
22. CAPACITY FACTOR (USING DER NET) 52.5 79.0 57.6
23. UNIT FORCED OUTAGE RATE 35.5 10.3 12.2
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING OUTAGE SCHEDULED TO BEGIN AUGUST 24 '992
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNlT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 DATE June 8 1992 COMPLETED BY G. Herbenick TELEPHONE 305 246-7112 REPORT MONTH ~Ma 1992 No. Date Type'uration Method of System Code'omponent Cause & Corrective Reason'Hours)

Shutting Event Reactor'icensee Codes Action to Down Reports Prevent Recurrence 6 920427 F 264.2 N/A Unit 3C RCP Seal Replacement F - Forced Reason Nethod Exhibit G - Instructions Exhibit 1 - Same Source s - scheduled A - Equipment Failure 1 - Nanual for Preparation of Data B - Naintenance or Test 2 - Nanual Scran Entry Sheets Licensee C - Refueling 3 Auto.wtic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training & 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE June 8 1992 COMPLETED BY:G. Herbenick TELEPHONE 305 246-7112 On May 1, Unit 3 remained in shutdown to replace the 3C Reactor Coolant Pump Seal. Unit 3 returned to 87% power on May 12 and maintained at that power level through the end of the month.

Unit 3 is expected to operate at 87% power to conserve fuel until the end of the current operating cycle. Unit 3 is scheduled to begin a refueling outage on August 24, 1992.

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.50-251 UNIT Turke Point 4 DATE June 8 1992 COMPLETED BY G.D. Herbenick TELEPHONE 305 246-7112 AVERAGE DAILY POWER LEVEL (MWe-Net) 05/01/92 677 05/02/92 673 05/03/92 670 05/04/92 666 05/05/92 671 05/06/92 679 05/07/92 257 05/08/92 668 05/09/92 686 05/10/92 682 05/11/92 678 05/12/92 673 05/13/92 677 05/14/92 675 05/15/92 675 05/16/92 675 05/17/92 677 05/18/92 678 05/19/92 681 05/20/92 681 05/21/92 680 05/22/92 680 05/23/92 681 05/24/92 680 05/25/92 677 05/26/92 674 05/27/92 672 05/28/92 671 05/29/92 673 05/30/92 673 05/31/92 667

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 6/8/92 COMPLETED BY G. HENBENICK TELEPHONE 305/246/7112 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: MAY 1992
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 3647 164572.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3501. 7 1061 14. 3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
14. HOURS GENERATOR ON-LINE 736.3 3467.9 102371. 2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
16. GROSS THERMAL ENERGY GENERATED (MWH) 1607386 7535392 215849729
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 516840 2438790 68911100
18. NET ELECTRICAL ENERGY GENERATED (MWH) 492573 2322218 65173980
19. UNIT SERVICE FACTOR 99.0 95. 1 62. 2
20. UNIT AVAILABILITYFACTOR 99.0 95. 1 62. 2

, 21. CAPACITY FACTOR (USING MDC NET) 99.4 95. 6 60.5

22. CAPACITY FACTOR (USING DER NET) 95.5 91.9 57.1
23. UNIT FORCED OUTAGE RATE 0.0 5.0 11.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 DATE June 7 1992 COMPLETED BY G. Herbenick TELEPHONE 305 246-7112 REPORT MONTH ~Ma 1992 No. Date Type Duration (Hours)

Reasona Method Shutting Down of Licensee Event Reports System Code'B Code'ause Cc"ponent & Corrective Action to Prevent Recurrence Reactora 920507 7.6 NIA Unit 4 Steam Generator Chemistry Action Level t3 F - Forced Reason Method Exhibit G - Znstructions Exhibit 1 - Same Source S - Scheduled A - Equipment Failure 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - continued (NUREG-0161)

E - Operator Training & 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

a k

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE June 8 1992 COMPLETED BY:G. Herbenick TELEPHONE: 305 246-7112 On May 7, Unit 4 was downpowered to Mode 2 for Steam Generator Blowdown Condensate clean-up. Unit 4 was returned to power operation on the same day ~

On May 8, Unit 4 reached 100% power and maintained that power level through the end of the month.

~ ~

P l

e 1 ~