Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM,'EGULATO INFORMATION DISTRIBUTION ~TEM (RIDS)

ACCESSION NBR:9203230337 DOC.DATE: 92/02/29 NOTARIZED: NO'., DOCKET FACIL:50-250 Turkey Poi'nt Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION GOLDIE,M.E. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Feb 1992 for Turkey Point Units 1 & 2.W/920312 ltr.

D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:NRR RAGHAVAN,L 05000250 /

NRR RAGHAVAN,L 05000251 A

RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 D AULUCK,R 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 N DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 R 1 1 RGN2 1 1 EXTERNAL: E '

BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15

1 t

P.O. Box 029100, Miami, Fl, 33102-S100 MAR 12 188'-92-073 10 CFR 50 36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort Zn accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the February 1992 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very 'truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/EJW/MEG attachments cc: Stewart D. Ebneter, Regional Administrator, Region XI, USNRC Senior Resident Xnspector, USNRC, Turkey Point Plant 9203230337 'F2022'rr PDR ADOCK 05000250 lI R

PDR an FPL Group company

~EBS L/g

t ~

l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE March 9 1992 COMPLETED BY M. E. Goldie TELEPHONE 305 246-6089 MONTH Februar 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/92 688 02/02/92 692 02/03/92 692 02/04/92 687 02/05/92 559 02/06/92 344 02/07/92 696 02/08/92 695 02/09/92 696 02/10/92 696 02/11/92 693 02/12/92 687 02/13/92 688 02/14/92 691 02/15/92 679 02/16/92 683 02/17/92 679 02/18/92 678 02/19/92 667 02/20/92 664 02/21/92 661 02/22/92 590 02/23/92 589 02/24/92 586 02/25/92 586 02/26/92 580 02/27/92 534 02/28/92 353 02/29/92 471

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT HIIME ~TE P I 199 DATE March 91992 COMPLETED BY Michael E. Goldie TELEPHONE 305 246-6089 REPORT MOHTH ~Fh 1999 Date Duration (Hours)

Reason'ethod of Shutting Event Reactor'censee System Code'ause Component 4 Corrective Action to Down Report¹ Code'EN Prevent Recurrence 920205 3.3 N/A unit 3 Generator Voltage Regulator 920227 0.0 JB 3B Steam Generator Feed Pump Lubrication 920228 F 0.0 SB 3A Steam Generator Feed Pump Bearing F Forced Reason Method Exhibit G - Instructions S Scheduled A - Equipment Failure (Exp) 1 - Manual for Preparation of Data B - Maintenance or Test 2- Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4- Continued (NUREG41 61)

E - Operator Training & 5- Load Reduction License Examination 9 - Other (Explain) 5 F Administrative Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 250 DATE MARCH 9, 1992 COMPLETED BY M. E. GOLDIE TELEPHONE 305/246/6089 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: FEBRUARY 1992
3. LICENSED THERMAL POWER (MWT): 2200 t
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY - YTD- CUMULATIVE 11 HOURS IN REPORT PERIOD: 696 1440 168633.6 12 NUMBER OF HOURS REACTOR WAS CRITICAL 696.0 1420.4 108145. 7 13 REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 14 HOURS GENERATOR ON-LINE 692.7 1412.9 106624.4 15 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121. 8 16 GROSS THERMAL ENERGY GENERATED (MWH) 1414833 2973591 221543657 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 459425 972330 70990716 18 NET ELECTRICAL ENERGY GENERATED (MWH) 436881 925508 671 18594 19 UNIT SERVICE FACTOR 99.5 98. I 63.2 20 UNIT AVAILABILITYFACTOR 99.5 98.1 63.3 21 CAPACITY FACTOR (USING MDC NET) 94.2 96.5 60.9

~ 22 CAPACITY FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT REFUELING OUTAGE SCHEDULED FOR AUGUST 1992 90.6 0.0 92.7 1.7 57.4 12.2

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE March 9 1992 COMPLETED BY M.E. Goldie TELEPHONE 305 246-6089 REPORT MONTH Februa 1992 On February 5, Unit 3 reduced reactor power to 7%,(generator off line), for 3.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> due to the Generator Voltage Regulator.

On February 6, Unit 3 reduced power to 76% for Steam Generator chemistry hold. Unit 3 was returned to full power on February 6.

On February 27, Unit 3 reduced power to 37% for 3B Steam Generator Feedpump oil system repair.

On February 28, Unit 3 operated at 49% power for inspection and repairs to 3A Steam Generator feedpump bearing.

On February 22, power was reduced to 87% for fuel conservation.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE March 9 1992 COMPLETED BY M.E. Goldie TELEPHONE 305 246-6089 MONTH Februar 1992 AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/91 0 02/02/91 0 02/03/91 509 02/04/91 688 02/05/91 696 02/06/91 697 02/07/91 698 02/08/91 696 02/09/91 695 02/10/91 694 02/11/91 691 02/12/91 692 02/13/91 692 02/14/91 686 02/15/91 685 02/16/91 685 02/17/91 681 02/18/91 681 02/19/91 678 02/20/91 675 02/21/91 676 02/22/91 678 02/23/91 678 02/24/91 676 02/25/91 675 02/26/91 675 02/27/91 678 02/28/91 684 02/29/91 686

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NILNE ~Tk P I 194 DATE March 91992 COMPLETED BY Michael E. Goldie TELEPNONE I6699 646.6949 REPORT EONTN ~69 1996 Date Duration (Hours)

Reason'ethod of Shutting Event Reactor'censee System Code'ause Code'omponent & Corrective Action to Down Reporl Prevent Recurrence 920128 473 4C Steam Generator Flow Transmitter F Forced Reason Method Exhibit G - Instructions S Scheduled A - Equipment Failure (Exp) 1 - Manual for preparation of Data 8 - Maintenance or Test 2- Manual Scram Entry Sheets Ucensee C - Refueling 3- Automatic Scram Event Report (LER) File D - Regulatory restriction 4- Continued (NU REGS 61)

E - Operator Training & 5 - Load Reduction License Examination 9 - Other (Explain) 5 F Admlnlstratlve Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 251 DATEMARCH 9, 1992 COMPLETED BY M. E. GOLDIE TELEPHONE 305/246/6089 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: FEBRUARY 1992
3. LICENSED THERMAL POWER (MWT): 2200 t
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE ll. HOURS IN REPORT

12. NUMBER OF HOURS PERIOD:

REACTOR WAS CRITICAL 696 656.2 1440 1327.2 162365.0 103939.8

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 648.7 1319.4 100222.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
16. GROSS THERMAL ENERGY GENERATED (MWH) 1415702 2851 174 211 16551 'I
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 461120 932380 67404690
18. NET ELECTRICAL ENERGY GENERATED (MWH) 438836 887355 63739117
19. UNIT SERVICE FACTOR 93.2 91. 6 61.7
20. UNIT AVAILABILITYFACTOR 93.2 91.6 61. 7
21. CAPACITY FACTOR (USING MDC NET) 94.7 92.5 60.0
22. CAPACITY FACTOR (USING DER NET) 91.0 88.9 56.6
23. UNIT FORCED OUTAGE RATE 6.8 8.4 11.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 DATE March 9 1992 COMPLETED BY M.E. Goldie TELEPHONE 305 246-6089 REPORT MONTH Februar 1992 On January 28, 1992, Unit 4 was shut down for 4C Steam Generator flow transmitter tap repair. Unit 4 was returned to full power operation on February 4, 1992.

J