MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
t ACCELERATED DISTRIBUTION DEMONSTIWTION SYSTEM
~,
t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9103180220 DOC. DATE: 91/02/28 NOTARIZED: NO DOCKET' FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light, C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 l
AUTH. NAME AUTHOR AFFILIATION TIERNEY,R.A. Florida Power & Light Co.
PLUNKETT,T.F. Florida Power & Light Co. R RECIP.NAME RECIPIENT AFFILIATION I
I
SUBJECT:
Monthly operating repts for Feb 1991 for Turkey Point Units 3 & 4.W/910312 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB S
.R - PEB10 1 1 NRR/DOEA/OEAB REG F 01 1 1 RGN2 EXTERNAL EG&G'RYCE g J ~ H 1 1 NRC PDR NSIC 1 1 D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO'REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14
ik 0 ~ 1 P.. Box 029100, Miami, FI33102-9100 PAL MAR 1 R 1991 c
t Q
L-91-073 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020.,
attached are the February 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, T. F ~ Plunkett Vice President Turkey Point Plant Nuclear attachments cc: Stewart D. Ebneter, Regional Administrator., Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 91031S0220 910228 PDR ADOCK 05000250 R PDR an FPL Group company
Cl
)Ci' I
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE March 8 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH Februa 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/91 0 02/02/91 0 02/03/91 0 02/04/91 0 02/05/91 0 02/06/91 0 02/07/91 0 02/08/91 0 02/09/91 0 02/10/91 0 02/11/91 0 02/12/91 0 02/13/91 0 02/14/91 0 02/15/91 0 02/16/91 0 02/17/91 0 02/18/91 0 02/19/91 0 02/20/91 0 02/21/91 0 02/22/91 0 02/23/91 0 02/24/91 '0 02/25/91 0 02/26/91 0 02/27/91 0 02/28/91 0
, wl I
OPERATING DATA REPORT DXKET NO 50 250 DATE 3/ 8/91 CGNPLETED BY R A TIERNEY TELEPHO K 385/246/6970 OPERATING STATUS lo MT HAHEo TURKS POIHT UNIT 3 2e REPGRTIHG PERIOD( FEBRUARY 1991 3e LICENSED TONAL PPAER (HMT) t 2280 4s HANEPLATE RATING (GROSS lNE) l 760 5o DESIGN ELECTRICAL RATING (Kf )IE) t 6'93
- 6. l(AXIffU)fDEPENDABLE CAPACITY <GROSS lIE) 1 699 7o MINN DEPENDABLE CAPACITY (NET NE) l '666 Bi IF CHIGES OCCUR IH CAPACITY RATINGS (ITE)6 NNSER 3 THROUGH 7)
SINCE LAST REPORTS GIVE REASGNSl 9, PGNER LEVEL TO WHICH RESTRICTED IF ANY (NET Ni)
- 10. REASONS FGR RESTRICTIONS'F ANY) lie HOURS IH REPORT PERIOD> 672 1416 159849i6
'2'IBER OF HOURS REACTOR NS CRITICAL eee eie 104473i2 13'EACTOR RESERVE SHUTDSNi HOURS e.e O.e 844o4 14'OURS GENERATOR GN-LINE eie eie 103055<7 15e UNIT RESERVE SHUTDIH HOURS Ooe e.e 22lo8 16'ROSS 'THERHAL ENERGY GENERATED (%H) 0 0 214231642 17'ROSS ELECTRICAL ENERGY GENERATED (lmf) 0 8 . 68615991 18+ HET ELECTRICAL ENERGY GEk~RATED (l@H) -1484 -3259 64875259 19> UNIT SERVICE FACTOR eve eie 64i5 20i UNIT AVAILABILITYFACTOR O,e eoe 64<5 2li CAPACITY FACTOR <USING %C HET) eie eie 62ii 22'APACITY FACTOR (USIA DER HET) eie e,e 58>6 23'NIT FORCED QUTAGE RATE e,e 0<0 12i5 24m SHUTDQNNS SCfFJNLED GttER NEXT 6 HOHTHS t 251 IF SHUT D<IH AT EHD QF REPORT PERIODt ESTISITED DATE QF STARTUPo 10/03/91
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Turkey Point g3 DATE Harch 8, 1991 COMPLETED BY R3f'A;) Tjet.neyo REPORT MONTH February, 1991 TELEPHONE (305 246-6970 Method of Shutting Ucensee Causes Corrective Duration Down Event System Component Actionto No. Date Type (Hours) Reason~ Reactor Reports Code4 Codes Prevent Recunence 22 901212 672 N/A Engine Unit 3 was shutdown for a scheduled Upgrades Outage.
2 F Forced Reason Method Exhibit G- instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) Rle D - Regulatory Restriction 4 - Continued (NUREG4161)
E - Operator Training &License Examination 5 - Load Reduction F - Administrative 9 - Other(Exphin)
G - Operational Error (Explain) Exhibit1-Same Source H - Other(Explain)
SUMMARY
OF OPERATING EXPERXENCE DOCKET 'NO. 50-250 UNIT Turke Point 3 DATE March 8 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH Fehrua 1991 Unit 3 was shutdown on December 12, 1990 for a scheduled Upgrades Outage.
~,
Ik 4l
AVERAGE DAILY UNIT POWER, LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE March 8 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH Februa 1991 AVERAGE DAILY POWER LEVEL (MHe-Net) 02/01/91 0 02/02/91 0 02/03/91 0 02/04/91 0 02/05/91 0 02/06/91 0 02/07/91 0 02/08/91 0 02/09/91, 0 02/10/91 0 02/11/91 0 02/12/91 0 02/13/91 0 02/14/91 0 02/15/91 0 02/16/91 0 02/17/91 0 02/18/91 0 02/19/91 0 02/20/91 0 02/21/91 0 02/22/91 0 02/23/91 0 02/24/91 0 02/25/91 0 02/26/91 0 02/27/91 0 02/28/91 0
OPERATING DATA REPORT DOQKT NO 59 - 251 DATE 3/ 8/91 COMPLETED BY Re Ae TIERNEY TELEPHONE 385/246/6970 OPERATING STATUS ie UNIT NAMEl TURKEY POINT UNIT 4 2>> REPORTING PERIOD>> FEBRUARY 1991 3 LICENSED THERMAL RNB (lNT 2289
- 4. NAMEPLATE RATIHG (CROSS SlE) 4 5>> DESIGN ELECTRICAL, RATING (HET MHE) e
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS 693 lSE) I 760 699 7>> MAXIMUM DEPENDABLE CAPACITY (HET SK)>> 666 8>> IF CHANCES OCCUR IH CAPACITY RATINGS (ITEMS NUMBER 3 THROUCH 7)
SiNCE LAST REPORTS GIVE REASONS>>
9>> PONER LEVEL TO HHICH RESTRICTEDR IF ANY (HET IlE) 10>> REASONS FOR RESTRICTIGNSr IF ANY'ONTHLY
-YTD- C(I%LATIVE iie HQRS IH REPORT PERIOD>> 672 1416 153581>>0 12>> NUMBER GF HOURS REACTOR HAS CRITICAL 0.0 e,e 101186>>4 13>> REACTOR RESERVE SHUTDOWN HOURS 8>>0 0>>0 166>>6 14>> %URS GENERATOR GHZK 0>>0 0>>0 97567>>1 15>> UNIT RESERVE SHUTWi5 HOURS e.e 8>>8 32>>1 16>> GROSS THERMAL ENERGY GEHERATED (MHH) 8 0 205630066 17>> CROSS ELECTRICAL ENERGY CEHERATED (IS) 0 0 &5&12880 18>> NET ELECTRICAL ENERGY GENERATED (II) -1815 -2198 62051430 19>> UNIT SERUICE FACTOR 0>>0 0>>0 63>>5 20>> UNIT AVAILABILITYFACTOR 0>>6 6>>0 63>>5 21>> CAPACITY FACTOR (USING MDC NET) e.e e,e 61>>8 22 CAPACITY FACTOR TUSDTS OER HET) 0>>0 e.e 58>>3 23, UNIT FOllCED OUTASE RATE 8>>0 e,e ii>>9 24, SHUTOONMS SCHEDULED OVER NEXT A HOMII l 25>> IF SHUT DOI AT EHD OF REPORT PERIODs ESTIMATED DATE OF STARTI"e ii/04/91
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNITNAME Turkey Point imi4 DATE Harch 8, 1991 COMPLETED BY R. A. Tierne February, 1991 TELEPHONE 305 246-.6970 Method of Shutting Licensee Cause S Corrective Duration Down Event System Component Action to Date Type (Hours) Reason~ Reactor Report¹ Code4 Codes Prevent Recurrence 901124 S 672 C/H N/AS RC/EE FUELXX Unit 4 shutdown for a scheduled ENGINE Upgrades and Refueling Outage..
2 F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4- Continued (NUREG4161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)
G - Operational Error(Explain) Exhibit1-Same Source
'H - Other(Explain)
II A
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT'urke Point 4 DATE March 8 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH Februar 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage.
On November 26, 1990.