Monthly Operating Repts for Feb 1991 for Turkey Point Units 3 & 4.W/910312 Ltr
ML17348A904
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/28/1991
From: Plunkett T, Tierney R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-073, L-91-73, NUDOCS 9103180220
Download: ML17348A904 (17)


Text

t ACCELERATED DISTRIBUTION DEMONSTIWTION SYSTEM

~,

t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9103180220 DOC. DATE: 91/02/28 NOTARIZED: NO DOCKET' FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light, C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 l

AUTH. NAME AUTHOR AFFILIATION TIERNEY,R.A. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power & Light Co. R RECIP.NAME RECIPIENT AFFILIATION I

I

SUBJECT:

Monthly operating repts for Feb 1991 for Turkey Point Units 3 & 4.W/910312 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB S

.R - PEB10 1 1 NRR/DOEA/OEAB REG F 01 1 1 RGN2 EXTERNAL EG&G'RYCE g J ~ H 1 1 NRC PDR NSIC 1 1 D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO'REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

ik 0 ~ 1 P.. Box 029100, Miami, FI33102-9100 PAL MAR 1 R 1991 c

t Q

L-91-073 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020.,

attached are the February 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F ~ Plunkett Vice President Turkey Point Plant Nuclear attachments cc: Stewart D. Ebneter, Regional Administrator., Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 91031S0220 910228 PDR ADOCK 05000250 R PDR an FPL Group company

Cl

)Ci' I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE March 8 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH Februa 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 02/01/91 0 02/02/91 0 02/03/91 0 02/04/91 0 02/05/91 0 02/06/91 0 02/07/91 0 02/08/91 0 02/09/91 0 02/10/91 0 02/11/91 0 02/12/91 0 02/13/91 0 02/14/91 0 02/15/91 0 02/16/91 0 02/17/91 0 02/18/91 0 02/19/91 0 02/20/91 0 02/21/91 0 02/22/91 0 02/23/91 0 02/24/91 '0 02/25/91 0 02/26/91 0 02/27/91 0 02/28/91 0

, wl I

OPERATING DATA REPORT DXKET NO 50 250 DATE 3/ 8/91 CGNPLETED BY R A TIERNEY TELEPHO K 385/246/6970 OPERATING STATUS lo MT HAHEo TURKS POIHT UNIT 3 2e REPGRTIHG PERIOD( FEBRUARY 1991 3e LICENSED TONAL PPAER (HMT) t 2280 4s HANEPLATE RATING (GROSS lNE) l 760 5o DESIGN ELECTRICAL RATING (Kf )IE) t 6'93

6. l(AXIffU)fDEPENDABLE CAPACITY <GROSS lIE) 1 699 7o MINN DEPENDABLE CAPACITY (NET NE) l '666 Bi IF CHIGES OCCUR IH CAPACITY RATINGS (ITE)6 NNSER 3 THROUGH 7)

SINCE LAST REPORTS GIVE REASGNSl 9, PGNER LEVEL TO WHICH RESTRICTED IF ANY (NET Ni)

10. REASONS FGR RESTRICTIONS'F ANY) lie HOURS IH REPORT PERIOD> 672 1416 159849i6

'2'IBER OF HOURS REACTOR NS CRITICAL eee eie 104473i2 13'EACTOR RESERVE SHUTDSNi HOURS e.e O.e 844o4 14'OURS GENERATOR GN-LINE eie eie 103055<7 15e UNIT RESERVE SHUTDIH HOURS Ooe e.e 22lo8 16'ROSS 'THERHAL ENERGY GENERATED (%H) 0 0 214231642 17'ROSS ELECTRICAL ENERGY GENERATED (lmf) 0 8 . 68615991 18+ HET ELECTRICAL ENERGY GEk~RATED (l@H) -1484 -3259 64875259 19> UNIT SERVICE FACTOR eve eie 64i5 20i UNIT AVAILABILITYFACTOR O,e eoe 64<5 2li CAPACITY FACTOR <USING %C HET) eie eie 62ii 22'APACITY FACTOR (USIA DER HET) eie e,e 58>6 23'NIT FORCED QUTAGE RATE e,e 0<0 12i5 24m SHUTDQNNS SCfFJNLED GttER NEXT 6 HOHTHS t 251 IF SHUT D<IH AT EHD QF REPORT PERIODt ESTISITED DATE QF STARTUPo 10/03/91

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Turkey Point g3 DATE Harch 8, 1991 COMPLETED BY R3f'A;) Tjet.neyo REPORT MONTH February, 1991 TELEPHONE (305 246-6970 Method of Shutting Ucensee Causes Corrective Duration Down Event System Component Actionto No. Date Type (Hours) Reason~ Reactor Reports Code4 Codes Prevent Recunence 22 901212 672 N/A Engine Unit 3 was shutdown for a scheduled Upgrades Outage.

2 F Forced Reason Method Exhibit G- instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) Rle D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training &License Examination 5 - Load Reduction F - Administrative 9 - Other(Exphin)

G - Operational Error (Explain) Exhibit1-Same Source H - Other(Explain)

SUMMARY

OF OPERATING EXPERXENCE DOCKET 'NO. 50-250 UNIT Turke Point 3 DATE March 8 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH Fehrua 1991 Unit 3 was shutdown on December 12, 1990 for a scheduled Upgrades Outage.

~,

Ik 4l

AVERAGE DAILY UNIT POWER, LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE March 8 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH Februa 1991 AVERAGE DAILY POWER LEVEL (MHe-Net) 02/01/91 0 02/02/91 0 02/03/91 0 02/04/91 0 02/05/91 0 02/06/91 0 02/07/91 0 02/08/91 0 02/09/91, 0 02/10/91 0 02/11/91 0 02/12/91 0 02/13/91 0 02/14/91 0 02/15/91 0 02/16/91 0 02/17/91 0 02/18/91 0 02/19/91 0 02/20/91 0 02/21/91 0 02/22/91 0 02/23/91 0 02/24/91 0 02/25/91 0 02/26/91 0 02/27/91 0 02/28/91 0

OPERATING DATA REPORT DOQKT NO 59 - 251 DATE 3/ 8/91 COMPLETED BY Re Ae TIERNEY TELEPHONE 385/246/6970 OPERATING STATUS ie UNIT NAMEl TURKEY POINT UNIT 4 2>> REPORTING PERIOD>> FEBRUARY 1991 3 LICENSED THERMAL RNB (lNT 2289

4. NAMEPLATE RATIHG (CROSS SlE) 4 5>> DESIGN ELECTRICAL, RATING (HET MHE) e
6. MAXIMUM DEPENDABLE CAPACITY (GROSS 693 lSE) I 760 699 7>> MAXIMUM DEPENDABLE CAPACITY (HET SK)>> 666 8>> IF CHANCES OCCUR IH CAPACITY RATINGS (ITEMS NUMBER 3 THROUCH 7)

SiNCE LAST REPORTS GIVE REASONS>>

9>> PONER LEVEL TO HHICH RESTRICTEDR IF ANY (HET IlE) 10>> REASONS FOR RESTRICTIGNSr IF ANY'ONTHLY

-YTD- C(I%LATIVE iie HQRS IH REPORT PERIOD>> 672 1416 153581>>0 12>> NUMBER GF HOURS REACTOR HAS CRITICAL 0.0 e,e 101186>>4 13>> REACTOR RESERVE SHUTDOWN HOURS 8>>0 0>>0 166>>6 14>> %URS GENERATOR GHZK 0>>0 0>>0 97567>>1 15>> UNIT RESERVE SHUTWi5 HOURS e.e 8>>8 32>>1 16>> GROSS THERMAL ENERGY GEHERATED (MHH) 8 0 205630066 17>> CROSS ELECTRICAL ENERGY CEHERATED (IS) 0 0 &5&12880 18>> NET ELECTRICAL ENERGY GENERATED (II) -1815 -2198 62051430 19>> UNIT SERUICE FACTOR 0>>0 0>>0 63>>5 20>> UNIT AVAILABILITYFACTOR 0>>6 6>>0 63>>5 21>> CAPACITY FACTOR (USING MDC NET) e.e e,e 61>>8 22 CAPACITY FACTOR TUSDTS OER HET) 0>>0 e.e 58>>3 23, UNIT FOllCED OUTASE RATE 8>>0 e,e ii>>9 24, SHUTOONMS SCHEDULED OVER NEXT A HOMII l 25>> IF SHUT DOI AT EHD OF REPORT PERIODs ESTIMATED DATE OF STARTI"e ii/04/91

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNITNAME Turkey Point imi4 DATE Harch 8, 1991 COMPLETED BY R. A. Tierne February, 1991 TELEPHONE 305 246-.6970 Method of Shutting Licensee Cause S Corrective Duration Down Event System Component Action to Date Type (Hours) Reason~ Reactor Report¹ Code4 Codes Prevent Recurrence 901124 S 672 C/H N/AS RC/EE FUELXX Unit 4 shutdown for a scheduled ENGINE Upgrades and Refueling Outage..

2 F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4- Continued (NUREG4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)

G - Operational Error(Explain) Exhibit1-Same Source

'H - Other(Explain)

II A

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT'urke Point 4 DATE March 8 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH Februar 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage.

On November 26, 1990.