Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
,ACCELERATED DISTRIBUTION DEMONST+ION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9009260195 DOC.DATE: 90/08/31 NOTARIZED: NO DOCKET g FACIL:50-250 'Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION TIERNEY,R.A. Florida Power & Light Co.
HARRIS,K.N. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Aug 1990 for Turkey Point Units 1 & 2.W/900914 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR r ENCL TITLE: Monthly Operating Report (per Tech Specs)
J SIZE:
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 EDISON,G 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV NRR/DOEA/OEAB11 RGN2 2
1 1
2 1
1
~".-K=-=
NRR/DLP+/LPEB10 1 1 EG&G BRYCE,J.H 1 1 NRC PDR 'XTERNAL:
1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON T NEEDr TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 16
i5 II P.O. Box14000, Juno Beach, FL 33408-0420 SEP t 0 3990 L-90-337 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4
.Docket Nos.,'50-.250 .and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4
'Technical Specification 6.9.1.c, and the guidance of NUREG 0020, attached are the August 1990 Operating Status and Summary .of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, V)
K. N Harris .
Vice resident Turkey Point Plant Nuclear KNH/DRP/RAT/rt attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant AaA ~ -$
90092601,95 900831 PDR ADOCK 05000250 R PDC an FPL Group company
~ ' ~
AVERAGE DAZLY UNZT POWER LEVEL DOCKET NO 50-250 UNZT Turke Point 3 DATE Se tember 14 1990 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH Au ust 1990 DAY AVERAGE DAZLY POWER LEVEL (MWe-Net) 8/ 1/98 665 3/ 2/98 664 8/ 3/90 6S9'5'?
3/ 4/98 8/ 5/90 658 3/ 6/98 6S9 8/ 7/90 662 3/ 8/90 659 8/ '?/90 654 8/10/98 65'?
8/11/90' 658 3/12/90 662 8/13/90 661 3/14/90 661 8/15/90 659 3/16/98 657 8/17/98 654 3/18/90 650 8/19/98 6S6 3/20/98'/21/98 656 645 3/22/90 639 8/23/90 563 3/24/90 486 8/25/90 626 3/26/98 &51 8/27/90 655 8/28/90 660 8/29/90 661 8/30/90 668 8/31/90 668
II ~
OPERATIHG DATA REPORT DOCKET HO 50 - 250 DATE 9/14/90 COtIPLETED BY RaAa TIERtKY TELEPHOHE 385/246/6978 OPERATING STATUS ia UHIT HAH"a TURIN POIHT UNIT 3 2a REPORTING PERIOD( AUGUST 1990 3a LICEHSED THERHAL POHER (tIT) I . 2200 4e HAIIEPLATE RATItm (CROSS tSK) e 760 5a DESIGH ELECTRICAL RATIHG (HET tIE) t 693 6a MINN DEPENDABLE CAPACITY (GIKS ISK) a 699 7a MINI)I DEPENDABLE CAPACITY (HET lSE)e . 666 Ba IF CHANCES XCUR IH CAPACITY RATIIICG (ITEHS ttUIIBER 3 THROUGH 7)
SINCE LAST REPORTs GIVE REASOHSI 9a POHER LEVEL TO NHICH RESTRICTEDy IF AHY (tKT tI/K) 10a REASOtIS FOR RESTRICTIOHSE IF At(Yt tetTHLY -YTD- CUIILATIVa:.
lla HOURS IH REPORT PERIODI 744 5831 155504e6 12a HUIIBER OF HOURS REACTOR HAS CRITICAL 744a0 2820.0 102010a2 13e REACTOR RESERVE SHUTOOHN HOURS OaO Oe0 844 4 14e HOURS GENERATOR SHJHE 744,0 2738a3 108592e9 15a UNIT RESERVE SHUTD(IH HOURS 0.8 0.0 121'e8 16a CROSS THERNAL BKRCY CBKRATEO (NH) 1613090 5817340 208852143 17 GROSS ELECTRICAL ENERGY GENERATED (II) 504435 1835015 66895891 18a HET ELECTRICAL ENERGY GENERATED (II) 479948 1724412 63241261 19e UNIT SERVICE FACTOR 100a0 47a0'7eO 64a7 20a UHIT AVAILABILITYFACTOR 100e0 64e8 21 a CAPACITY FACTOR (USIHC tIC HET) 96a9 44a4 62e3 22a CAPACITY FACTOR (USIHC DER HET) 93ai 42e7 58a7 23a UNIT FORCED OUTAGE RATE 0;0 9.6 12.7 24 SHUTDOII" SCHEDULED OVER tKXT 6 MOIITHS l 12/01/90; 296 Days - E~erctency Diesel Generator Work.
25e IF SIST DOII AT END OF REPORT PERIOD9 ESTIHATED DATE OF STARTUP!
~ .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNlT NAME Tur key Point im 3 DATE September 14, 1990 COMPLETED BY R. A. Tierney RFPORT MONTH August, 1990 TELEPHONE (305) 246-697o Method of Shutting Ucensee Cause & Corrective Down Event System Component Actionto No. Date Type'uration (Hours) Reason~ Reactor Reports Code4 Codes PreventRecurrence 20 900823 18:44 N/A SG COND Unit 3 reduced Power to perform the Turbine Valve test. Upon completion of the test Unit 3 remained at reduced power to inspect and clean the north and south waterboxes.
F Forced Reason Method Exhibit G- instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4- Continued (NURE&4161)
E - Operatbr Training 8 License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO 50-250 UNIT Turke Point 3 DATE Se tember 14 1990 COMPLETED BY R. A. Ti;erne TELEPHONE, 305 246-6970 REPORT'ONTH'u ust 1990 Unit 3 operated at essentially full power with a .power reduction on August 23. Unit 3 reduced power on August 23 to perform the Turbine Valve Test. Upon, satisfactory completion of the test Unit 3 remained at reduced power to perform an inspection and cleaning of the North and South Waterboxes. Unit 3 was'eturned to full power on August 24, 1990.
0 0 II
)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-251 UNIT Turke Point 4
,DATE Se tember 14 1990 COMPLETED BY R. A. Tierne TELEPHONE 305 246'-6970 MONTH Au ust 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 8/ 1/90 -3 3/ 2/90 8/ 3/90 -16 3/ 4/90 8/ 5/90 3/ 6/90 8/ 7/90 660 3/ 3/90 659 8/ 9/90 453 8/10/90 346 8/11/90 587 3/12/90 449 8/13/90 -21
'3/14/90 197 8/15/90 662 3/16/90 8/17/90 3/18/90 8/19/90 3/20/90 8/21/90 3/22/90 657 8/23/90 656 3/24/90 649 8/25/90 656 3/26/90 656 8/27/90 658 8/28/90 659 8/29/90 663 8/30/90 661 8/31/90 662
0 OPERATIt tG DATA REPORT DOO(ET HO 50 - 251 DATE 9>14/98 ONPLETED BY R>>A>> TIERttEY TFM'HONE 305/246/6970 OPERATING STATUS 1 lNIT HAHEl TtRKY POIHT UNIT 4 2>> REPORTIHG PERIODS NKUST 1990 3>> LICENSED THERHAL POWER (%T)>> . 2280 4 ttAt(EPLATE RATIt(G (GROSS tNE) l 760
- 5. DEAICH ELECTRICAL RATIHD <HET )AIE)) 693 6 )DNHAI DEPEHDADLE CAPACITY TC)m I)RE) ) 699 7>> MINN DEPEHDABLE CAPACITY (tel'stE) t 666 8>> IF CHANGES OCCUR IH CAPACITY RATINGS (ITEHS HUt(BER 3 THROUGH 7)
SIHCE LAST REPORTE GIVE REASIlSA 9>> POHER LEVEL TO HHICH RESTRICTEDr IF AHY (HET tstE) 10>> REASONS FOR RESTRICTIOttSE IF At(Yl tIHTHLY -YTD- CINULATItP'.
ll>> IIRS IH REPORT PERIODt 744 5831 149236,0 12>> HINBER OF HOURS REACTOR HAS CRITICAL, 6e4,1 4759>>4 99143>>1 13>> REACTOR RESERVE SHUTDNH HOURS e.o 8>>0 166i6 14>> HOURS GENERATOR mt-LIt(E 590 4 4655>>6 95528i5 15>> UNIT RESERVE SIJTDOHH HOURS e,o o.e 32>>1 16>> GROSS THERHAL ENERGY GB(ERATED (IH) 1202781 10019710 281244054 17>> GROSS ELECTRICAL ENERGY GENERATED (tlt) 378555 3218499 64212330 18>> HET ELECTRICAL B(ERGY GB(ERATED (IH) 357405 3051129 60722289 19>> UHIT SERVICE FACTOR 79>>4 79>>S 64>>0 20>> UNIT AVAILABILITYFACTOR 79>>4 79iS 64>>0 21>> CAPACITY FACTOR (USING tIC HET) 72>>1 78>>6 62>>3 22>> CAPACITY FACTOR (USING DER HET) 69>>3 75>>5 ~ 5S>>7 23>> Ut(IT FIKED OUTAGE RATE 20. 6 15. 2 12. 1 24>> SHUTDOHHS SCHEDULED OVER HEXT 6 liottTHS>>
~+01+90 296 D~as - Emergenc ~Di ese1
~(.nerat~r Work.
25>> IF SHUT DOHH AT BLD OF REPORT PERIODE ESTIHATED DATE OF STARTlPi>
I 1
I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Turkey Point 84 j DATE Se tember 14, 1990 COMPLETED BY R. A. Ti erne REPORT MONTH Au ust, 1990 TEI EPHPNE (305) 246-6970 Method of Shutting Ucensee Cause & Corrective Duration Down Event System Component Actionto Date Type (Hours) Reason2 Reactor" Report iti Code4 Codes PreventRecurrence 5 900717 117:20 .
4 N/A CJ VALVEX Unit 4 was removed from service to investigate/repair an internal leak on the pressurizer spray valve. The unit was brought to cold shutdown to investigate/repair an external leak on an old pressurizer spray valve body. The unit remained in cold shutdown to repair a leak in the upper manway.
6 900812 36:17 A 251/90-008 SD RELAYX Unit 4 experienced an automatic Reactor Trip on low, low steam Generator level due to loss of 4A Steam Generator Feedwater Pump. The loss of the pump was due to an in-correct setpoint on an agasta't relay The relays have been recalibrated on the 4A 8i 4B Steam Generator Feedwate Pump.
F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram EventReport(LER)File D - Regulatory Restriction 4 - Continued (NUREG4161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)
G - Operational Error (Explain) Exhibit1-Same Source H - Other(Explain)
II 0 r ~
P I'
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO' 50-251 UNIT Turke Point 4 DATE Au ust 14 1990 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH Au ust 1990 Unit 4 remained in cold shutdown for the investigation/repair of an internal leak on the pressurizer spray valve and an external leak on an. old pressurizer spray valve body. The unit remained in cold shutdown to repair a leak in the upper pressurizer manway. The unit was returned'o service on August 5. Unit, 4'xperienced an Automatic Reactor Trip on low-low Steam Generator Level due to a trip of 4A Steam Generator Feedwater Pump. The loss of the pump was, due to an incorrect setpoint on an Agastat relay. The relays on the 4A and 4B Steam Generator Feedwater Pump were recalibrated
.and the unit was returned to service on August 14.