ML17348A310

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1990 for Turkey Point Units 3 & 4.W/900614 Ltr
ML17348A310
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/31/1990
From: Harris K, Tierney R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-212, NUDOCS 9006210527
Download: ML17348A310 (17)


Text

.ACCELERATED D TRIBUTION DEMON TION SYSTEM

~ ~

~e

~ 'I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9006210527 DOC.DATE: 90/05/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light'.

PT C 05000250 50-2=1 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION TIERNEY,R.A. Florida Power & Light: Co.

HARRIS,K.N. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly 'ng repts for May 1990 for Turkey Point Units 3 & 4. /900614 tr.

DISTRIBUTION CODE: 24D COPIES RECEIVED LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 EDISON,G 1 1 INTERNAL: AEOD/DOA AEOD/DSP/TPAB IRM TECH ADV NRR DLPQ/LPEB10 NRR/DOEA/OEABll 01 RGN2 EXTERNAL: EG&G STUART,V.A LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WAS'ONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 17

P.O. Box14000, Juno Beach, FL 33408-0420 JUN 1 0 )9S0 L-90-212 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.c, and the guidance of NUREG 0020, attached are the May 1990 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, K. N. arris Vice President Turkey Point Plant Nuclear KNH/DRP/RAT/rat.

attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 90062i0527 90053i PDR R

ADOCK

'DC 05000250 an FPL GrouP comPany

~ i

~ )Q.'s+

'i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO'0-250 UNIT Turke Point 3 DATE t'une 15 1990 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH Ma 1990 DAY AVERAGE DAILY POWER LEVEL'MWe-Net)

.i:5/ 1/90 3(

,5/ 2/90 -3

"" 5/ 3/90 -3 5/ 4/98 -3 S/ 5/90 -3 5/ 6/90 "3 5/ 7/90 -3 5/ 8/98 "3 5/ 9/90 -3 5/10/90 -3 5/ii/90 -3 5/12/90 -3 S/13/90 -3 5/14/90 -3 5/15/90 5/16/98 -7 5/17/90 -17 5/18/98 -21 5/19/90 -20 5/20/90 -19 5/21/98 -19 5/22/98 "17 5/23/90 -17 5/Z4/98 -19 5/25/90 -21 5/Z6/90 -23 5/27/90 -21 =

'5/28/90 -19 5/29/98 -12

=. 5/30/90 -12 I

+5/31/90 12

~k&8~r4 =

OPERATING DATA REP>>iRT OXYET NO 9 - 250 DATE 6/1+90 COI'ltETEO BY R>A> TIERNEY

.ELEPHONE 385/246/7103 OPERATING STATUS ii UNIT NAt!El TIKI(EY POIiNT UNIT 3 2> REPORTING PERIOD> i(AY 1990 3 LICr>SEO ThHRAL POM (t'NT) l 2298

-",> t',c LATE RATItIG (GROSS i">IE) > 769

5. DESI'LECTRICAL RAT:iC (tIET ".~E) l 693
6. tA"L~P DEPENDABLE CAPACITY <GROSS ÃAE) > 699

?>,"A'GN"". OE EtIDABLE CAPACITY (NET tJiE)> 666 8> F ClAtGES CCCUR Ii( CAPA ITY RAT'"IGS <ITEt(S r>dÃiBER 3 TEROUGH 7)

S"tICE LAST REPORT) GIVE REASONS' 9>> FGr>>":9 I "'~" TO >IHICtt RESTRICTEDr ~

F ANY (NET t'~r.)

iei REASOtIS FOR RESTRICTIONSi IF At(Y l NNTHLY -YTO- CU"LiLATDP.

?44 3623 '5%96>6 12> NU>"i'F HOURS REACTOR HAS CRITICAL 37.6 952>5 . 198942>6

'.3i REACTOR REcER>Z P~>r"vM HOES 0>>0 9>0 844>4 14> HOURS GENERATOR Ott-LM eie 814>3 98669>0

'15i Ut(IT RESERVE SHUTOO>N HOURS 0.0 0.0 121.8 16> GPSS TH%".4L Et>>ERGY GENERATED (iAH) 1791182 294825985 17> GROSS " ECTRICAL EhERGY GENERATEO (NlH) 0 575155 65636031 18> NcT ='CTRICAL Ett&.CY GBIERATED (>"i8) -7696 532798 629495'7 19>> 4>> IT SERV?CE FACTOR e,e 22>5 64 4 29 8<IT NAILABILITYFACTOR 0>0 22>5 64>4 21> CAPACITY FACTOR (USING KC NcT) 0>9 22>i 62>0 22> CAPACITY FACTOR (USING DER NET) 9>0 21>2 M>4 23 NIT FORCED OUTAGE RATE 0.0 0.0 12.8 24> SHUTO(~>"lS ScHEDULEO O')ER tIEXT 6 t>ONTHS l 25> IF SHUT DOVA AT ""% OF REPORT PBIODi ESTIMATED DATE OF STARTUPt

0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Turkey Point 83 DATE June 15, 1990 COMPLETED BY R 4'<<ney REPORT MONTH Nay. 1990 TELEPHONE (305) 246-6970 Method of Shutting Ucensee Cause & Corrective Down Event System Component Actionto No. Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Codes PreventRecurrence 15 900203 S 744 FUELXX Unit 3 was shutdown for a scheduled refueling and maintenance outage.

3 F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUAES4161)

E - Operator Training &Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)

G - Operational Error(Explain) Exhibit 1-Same Source H - Other(Explain)

~ ~ i i

4

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO'0-250 UNIT Turke Point 3 DATE June 15 1990 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH Ma 1990 Unit 3 was shutdown for a scheduled refueling and maintenance outage.

fi AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-251 UNIT Turke Point 4 DATE June 15 1990 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH Ma 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 5/ 1/90 666 5/ 2/90 662 5/ 3/90 669 5/ 4/90 678 5/ 5/90 671 5/ 6/98 670 5/ 7/90 667 5/ S/90 670

/ 9/90 674 5/18/90 673 5/11/90 670 5/12/90 666 5/13/90 664 5/10/90 668 5/15/90 661 5/16/98 658 5/17/90 657 5/18/90 593 5/19/90 -23 5/20/90 -19 5/21/90 -17 5/22/90 -18 5/23/90 -15 5/24/98 -ll 5/25/90 -15 5/26/90 -28 5/27/90 -22 5/28/90 03 5/29/90 271 5/38/90 - 4%

5/31/90 4w" ~671

OPERATING DATA REPORT DG"t(H tT'O 0 - 251 DATE 6/1590 CGTPLETED BY Rihi TIERHEY T~T.""PHC'(E 305/246/7103

"",ERATI)tt'G STATUS ii UHIT 1!A?(Ei T(IEY PGIHT LTHIT 4 2 ncPCRTI?T'G PERIODS NY 1990 3 LIC=?i~ED T)T'P?TAL PGk"".R (t t)tT) l 2200

'.. HA",cMATE RATM (GROSS t¹)i 760 5 DESIGH ELE.(RICAL RATING (HET ttHE) i 6>>NItTUN IFwBtDETKE CAPACITY (GROSS NT") t 693 699 7i .IXI""-. GP"NDABLE CAPTACITY (taET ttnE)i 666 Bi IF Cr'AHG S OCCUR IH CA. ACITY RATiNGS '.ITETS tT'Ut(SER Tt;~GUN 7)

SINCE 'ST REPGRTE GFU'- REASQHSi 9i iiR:R LEVEL TO HACH RESTRiCTEDE IF AHY (iHET NE)

'0. FEEASOl.~ FGR RESTPZCTIGHSE .= AHY:

"GWitT'T Y -YTD- CU?EMULATIVE i t't@RS IH REF'CRT PERICDi 744 3623 147028 0 12t HUt(SER OF HOURS REACTGR OS CRITICAL 574i7 3036i3 97420 0

'"~3-D""'( t'GGT"S 0i0 00 166i6 r C(% GE?.cRATGR OH-LI?Tc 511 i 4 2946i3 93819 2 15 ~ UHIT %SERVE lUTDGLH HC(IRS 0.0 0.0 32,1

'6i ETtGSS THERT"AL Ettw~uY GBT'ERATED (58) 1070569 6377695 '197602039 17 GROSS ELECTRiCAL BTERGY GEHERATED (SEH) 336965 2071194 63065025 183:'ET ELECTRICAL E?TEMPT"Y KiZRATED (t"4) 3'6741 1?64315 59635475 19i UHIT SERVICE FACTOR 6lBi7 81i3 63i8 20i RUT VAILABILIDFACTOR 68i7 81 3 63i8 Zii CAPACITY FACTOR (USIK ."ZC ti~T) 63i9 Bli4 62il 22i CAPACITY FACTOR (USIHG DER HET) 61i4 78i2 58i5 "3 CETTT TEEC:U UUTECE tUtTE 31.2 11.0 11. 9

-'i EHUTM"iE ECli:.UUCEU 0",Ht tlEET 3 ti".ltlt3 t 25i iF SHUT DGC( AT E?8 GF %PORT PERIGDE ESTL"ATED DATE GF STARTUPl

~I 0 ~>

~

'l

~ y,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETWO. 50-251 uNlT NAME Turkey Point 84 DATE June 15, 1990 COMPLETED BY R. A. Tierney (305) 246-6970 REPORT MOgW Method of Shutting Ucensee Cause & Corrective Down Event System Component Actionto Date Type'uration (Hours) Reasons Reactor Reports Code4 Codes PreventRecurrence 900518 232.6 N/A TG PumpXX Cause of extended shutdown was an Auxiliary Oil Pump failures Pump 900526 G 251-90-004 was replaced. Unit was manually tripped from Mode 2 due to personnel error.

2 F Forced Reason Method Exhibit G- instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) Rle D - Regulatory Restriction 4 - Continued (NURE&0161)

E - Operator Training 8 Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error(Explain) Exhibit1-Same Source H - Other(Explain)

a I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~ 50-251 UNIT Turne Point 4 DATE June 15 1990 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH Ma 1990 Unit 4 was manually shutdown on May 18 due to an Auxiliary Oil Pump failure. The pump was replaced and the unit was in the process of being returned to service when, the unit was manually tripped from Mode 2 due to personnel error on May 26. Unit 4 was returned to service on May 28.

~I li I 1