Monthly Operating Repts for Apr 1990 for Turkey Point,Units 2 & 3.W/900515 Ltr
ML17348A247
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/30/1990
From: Bonett D, Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-178, NUDOCS 9005180076
Download: ML17348A247 (16)


Text

ACCELERATED DI UTION DEMONSTEMTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~ ~

'ACCESSION NBR:9005180076 DOC.DATE: NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION BONETT,D.M. Florida Power 6 Light Co.

HARRIS,K.N. Florida Power'6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl 'n repts for Apr 1990 for Turkey Point, Units 2 6 3. /900515 l r.

DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 EDISON,G 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 IRM TECH ADV 2 2 NRR~J3LPQ/LPE B 1 0 1 1 NRR/DOEA/OEABll 1 1 (g~GFI I~@ 01 1 1 RGN2 1 1 EXTERNAL EG&G STUART i V A 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,.

ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 17

P.O. Box14000, Juno Beach, FL 33408-0420 HAY ~pig L-90-178 10 CFR 50.36 U ~ S. Nuclear 'Regulatory Commission.

Attn: Document Control DE C. 20555

.Desk'ashington, Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos 50-250 and 50-251

~

Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.c, and the guidance of NUREG 0020, attached are the April 1990 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, Vice esident Turkey Point Plant Nuclear KNH/DRP/RAT/rat attachments cc: Stewart D. Ebneter, Regional Administrator, Region II,, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9005180076 900430 PDR ADOCK 05000250 R PDC an FPL Group company

il YAf"

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE Ma 15 1990 COMPLETED BY R. A. Tierne TELEPHONE 305 246-7103 REPORT MONTH A ril 1990 Unit 3 was shutdown for a scheduled refueling and maintenance outage.

OPERATING DATA REPORT

'DOCKET ttO 50 - 250 DATE 5! 8/99 Cot(PLETED BY D, tli BONETT TELEPHONE 497/694/4432 OPERATING STATUS 1< UHIT HAtJEo TURKEY POIHT UNIT 3 2< REPORTIHG PERIODt APRIL 1990 3< LICEHSED THERt(AL. PO)tER 4< HAHEPLATE RATING (GROSS (tIT) t tlltE) o 5< DESIGH ELECTRICAL RATING (HET 6< HAXINJtl DEPEHDABLE CAPACITY (GROSS 7< t(AXINJM DEPENDABLE CAPACITY (HET I?E) <,

tSE) l tIE) J .

22M 760 693 699 666 8< IF CHANGES OCCUR IH CAPACITY RATINGS (ITEtlS NIBER 3 THRIJGH 7)

SIHCE LAST REPORTt GIVE REASONS<

9< POHER LEVEL TO JJHICH RESTRICTED< IF AHY (HET tIE) 10< REASOttS FOR RESTRICTIONS~ IF ANY<

NHTHLY -YTD- C(IULATIVE il< HOURS IH REPORT PERIOD! 719 2879 152552<6 12< HUNBER OF HOURS REACTOR HAS CRITICAL 0<8 814<9 100805<0 13< REACTOR RESERVE SIJTMIH HOURS 0<0 0<0 844<4 14< HOURS GENERATOR ON-LINE 0<0 814<3 98669<0 15< UHIT RESERVE SHUTDOHH IIRS 0.'0' 0 0 121.8 16< GROSS THEPIQL ENERGY GENERATED (tIH) 1791182 294825985 17< GROSS ELECTRICAL ENERGY GENERATED (JIH) 0 575155 65636831 18< HET ELECTRICAL ENERGY GENERATED (II) -44M 540404 62057253 19< UNIT SERVICE FACTOR 0<8 28<3 64<7 20< INIT AVAILABILITYFACTOR 6<0 28<3 64<8 21< CAPACITY FACTOR (USIHG HDC HET) 8<0 28<2 62<4 22< CAPACITY FACTOR (USIHG DER HET) 0<0 27<1 58<7 23< UNIT FORCED OUTAGE RATE 0;0 0.0 12'. 8 24< SHUTDOIS SCHEDULED OVER NEXT 6 tlOHTHS t 25< IF SHUT'DOIt AT EHD OF 'REPORT PERIODS 'ESTItITED DATE OF STARTUP,'L28L9.0

AVERAGE DAZLY UNZT POWER LEVEL DOCKET NO ~ 50-250 UNZT Turke Point 3

.DATE Ma 15 1990 COMPLETED BY R. A. Tierne TELEPHONE 305 246-7103 MONTH A ril 1990 DAY. AVERAGE DAZLY POWER LEVEL (MWe-Net) 4/01/90 -2 4/02/90 -2 4/03/90 -2 4/04/90 -2 4/05/90 -2 4/06/90 -2 4/07/90 -2 4/08/90 -2 4/09/90 -2 4/10/90 -2 4/11/90 -2 4/12/9 0 -3 4/13/9 0 -2 4/14/90 -3 4/15/90 -2 4/16/90 -3 4/17/90 -3 4/18/90 -2 4/19/90 -2 4/20/90 -4 4/21/90 -14 4/22/90 -14 4/23/90 -16 4/24/90 -18 4/25/90 -15 4/26/90 -10 4/27/90 -11 4/28/90 -13 4/29/90 -16 4/30/90 -12

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

Turkey Point 83 99D COMPLETED By R. A. Ti erney REPORT MONTH April, 1990 ~M5 Ul Method of Shutting Licensee Cause & Corrective Duration Down Event System Component Actionto Date Type (Hours) Reason~ Reactor Report¹ Code4 Codes Prevent Recurrence 900203 719 N/A RC FUEL XX UNIT WAS SHUTDOWN FOR A SCHEDULED REFUELING AND tfAINTENANCE OUTAGE 2

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1- Manual for Preparation of Data B - Maintenance or Test 2- ManualScram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) Fife D - Regulatory Restriction 4 - Continued (NUREG%161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)

G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)

SUMMARY

OP OPERATZNG EZPERXENCE; DOCKET NO 50-251 UNIT Turke Point 4 DATE Ma 15 1990 COMPLETED .BY R. A. Tierne TELEPHONE 305 246-7103 REPORT MONTH A ril 1990 Unit 4 tripped on April 9, 1990 due to and internal failure of the Underfrequency Relay on the Reactor Coolant 'Pump. While in cold shutdown Safeguards testing was performed on Unit 3. Unanticipated holds were encountered during heatup caused by a RHR Pump Seal leak, following the resolution of these holds Unit 4 returned to power.

OPERATIHG DATA REPORT DOCKET HO 50 " 251 DATE 5/ 8/90 CO)DIETED BY Dc Mc BOHETT TELEPHOHE 487/694/4432 OPERATIHG STATUS lc UHIT HAEE TURKEY POIHT UHIT 4 2c REPORTIHG PERIODS APRIL 1990 3c LICEHSED THERMAL PNKR (MMT) t , 2200 4c HAMEPLATE RATIHG (GROSS MME) f 760 5c DESIGH EL'ECTRICAL RATIHG (HET NK) t 693 6c MAXIMUM DEPEHDABLE CAPACITY (GROSS SK) c 699 7c MAXINN DEPEHDABLE CAPACITY (HET N!E) c 666 Bi IF CHANGES OCCUR IH CAPACITY RATIHGS (ITEMS NNBER 3 THROUGH 7)

SI?KE LAST REPORTt GIVE REASOHSt 9i POMER LEVEL TO HHICH RESTRICTEDt IF AHY (HET N(E) 10c REASOHS FOR'RESTRICTIOHSt IF AHYl NNTHLY -YTD- QNULATIVE llc HOURS IH REPORT PERIODs 71'9 2879 146284,0 12c NNBER GF HOURS REACTOR NS CRITICAL 519c2 2461 c6 96845c2 13c REACTOR RESERVE SHUTDO)m HOURS 0i0 0i8 166c6 14c HOURS GBKRATOR GH-LIHE 15c UHIT RESERVE SHUTDOWN HOURS 0.0'.0 584c4 2434c9 93307c7 32.1.c 16c GROSS THERMAL EHERGY GBKRATED ($8) 1886388 5307126 196531478 17, GROSS ELECTRICAL EHERGY GEHERATED (MHH) 350599 1734229 62728060 18c HET ELECTRICAL EHERGY GEHERATED (ISH) 329874 1647574 59318734 19c UHIT SERVICE FACTOR 70c2 84c6 63c8 28i UHIT AVAILABILITYFACTOR 70c2 84c6 63c8 2ic CAPACITY FACTOR (USIHG MDC HET) 68c9 85c9 62ci 22, CAPACITY FACTOR (USIHG DER HET) 66c2 82c6 58c5 23c UHIT FORCED OUTAGE RATE 26. 3 5.5 11. 8 24c SHUTDOHHS SCHEDULED OVER HEXT 6 MOHTHS t 25c IF SHUT Dmm AT EHD'OF REPORT PERIODt ESTIMATED DATE OF STARTUPc

ii I P

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO'0-251 UNIT Turke Point 4 DATE Ma 15 1990 COMPLETED BY R. A. Tierne TELEPHONE 305 246-7103 MONTH A ril 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 4/01/90 685 4/02/90 680 4/03/90 679 4/04/90 683 4/05/90 692 4/06/90 692 4/07/90 685 4/08/90 681 4/09/90 513 4/10/90 -17 4/11/90 -16 4/12/90 -14 4/13/90 -17 4/14/90 -21 4/15/90 -23 4/16/90 -24 4/17/90 -23 4/18/90 47 4/19/90 448 4/20/90 669 4/21/90 679 4/22/90'/23/90 682 680 4/24/90 676 4/25/90 675 4/26/90 678 4/27/90 678 4/28/90 679 4/29/90 677 4/30/90 671

~ll lt UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 Turkey Point 84 DATE May 15 1990 COMPLETED BY R. A. Tierhe REPORT MONTH AP"' TELEPHONE (305) 246-7'103 Method of Shutting Ucensee Cause 8 Corrective Down Event System Component Acthnto No. Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Codes PreventRecurrence 2 900409 F 214.6 LER 90-003 AB CAP CAUSE OF TRIP WAS THE INTERNAL FAILURE OF AN UNDERFRE(UENCY RELAY ON THE REACTOR COOLANT PUMP F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1- Manual for Preparation of Data B - Maintenance or Test 2- Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other(Explain)