Monthly Operating Repts for Jan 1990 for Turkey Point Units 3 & 4.W/900214 Ltr
ML17347B575
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/31/1990
From: Bonett D, Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-52, NUDOCS 9002230302
Download: ML17347B575 (19)


Text

ACCELERATED DIS UTION DEMONS TION SYSTEM

/

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSIOH'hR' 0022 3 03 02 FACIL:50-250 Turkey Point DOC DATE 95j~I+5T NOTARXZED Plant, Unit 3,~ Florida Power and Light

'O C DOCKET g 05000250 50-251 Turkey Point Plant, Unit. 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION Florida Power & Light Co.

BONETT,D.M.

HARRIS,K.N.

RECIP.NAME

'lorida Power & Light Co.

RECIPIENT AFFILIATION

SUBJECT:

Mont epts for Jan 1990 for Turkey Point Units 3 &

y e

.W/900214 lt D DISTRIBUTION CODE: COPIES RECEIVED:LTR ENCL SIZE: S TITLE: Monthly Operating Report (per Tech Specs)

NOTES A

RECIPIENT RECIPXENT ID CODE/NAME COPIES'TTR ENCL 'D CODE/NAME COPXES LTTR ENCL PD2-2 LA 3. 3 PD2-2 PD 1 1 '

EDISON,G 1 1 ~

INTERNAL: AEOD/DOA IRM TECH ADV 1

2 1

2 AEOD/DS P/TPAB NRR/DLPQ/LPEB10 1 '1l.

NRR/DOEA/OEAB11 1 1 NRR/DREP PRPB11 1 1 NUDOCS-ABSTRACT RGN2 1

1 1

1.

RE~~ 0 1 1 EXTERNAL NRC PDR I

EG &G S MPSON g F 1 1

1 1

LPDR NSIC 1

1 1

D A

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:., LTTR 19 ENCL 19

I +'$' "

ll 4

~

$ . 8'g,

<,}

4 s'

q r

'I l

~~

4>

~ ~

f)v, "l I ~ I 0 gt, l<l

P.O. Box 14000, Juno Beach, FL 33408-0420 OS6< O< BaS L-90-52 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort Attached are the January 1990 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, arri:s Vice resident Turk Point Plant Nuclear KNH/DMB Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9002230302 900i3i PDR ADOCK 05000250 R PDC an FPL Group company

]pi "r

AVERAGE DAILY UN1T POWER DOCKET NO. '50-250 UNIT Turke Point 3 DATE Pebrua 15 1990 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH Zanua 1990 DAY AVERAGE 'DAILY POWER (MWe-Net) i/ 1/90 1/ 2/90 680 672 1/ 3/90 680 1/ 4/90 677 1/ 5/90 676 1'/ 6/90 667 1/ 7/90 665 1/ 8/90 668 1/ 9/90 670 I/18/90 669 1/11/90 677 1/12/'90 685 1/13/90 689 1/14/90 696 1/15/90 697 1/16/90 ,698 1/1'7/90 685 1/18/90 681 1/19/90 680 l/28/90 676 1/Zi/90 673 l/22/90 667 1/23/90 665 1/24/90 666 1/Z5/90 668 1/26/90 672 1/27/90 .684 1/28/98 682 l/29/98 671 1/38/98 667 1/31/90 661

(Qi 0 OF'ERA TING DATA REF'ORT

,DOCKET NO 50 250 DATE z/15/9e COMPLETED BY D. N+ BONI=TT TELE:Pl-IONE 407/694/4'432 QPE:RATTNG STATUS 1, UNIT NAME: TURKEY F'OINT UNIT '3

z. REPORTING PERIOD: JANUARY 199e 3i LICENSED THERNAL F'ORER (NHT)+ zzee 4i NAHFPI ATE RAT'ING (GROSS HWE)+ 76e 5i DESIGN ELECTRXCAL RATTNG (NET.NWE)+ 693 6+ MAXIMUM, DEPENDABLE CAPACITY (GROSS NHE)e 699 7+ HAXXHUN DEPENDABLE CAF'ACITY (NET NHE) o 666 8, IF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS NUME.'ER 3 THROUGH 7)

SINCE LAST REF'ORT r GIVE REASONS LEVEL TQ WHICH RESTRICTED~ XF ANY (NET NHE)

'OHER 18+ REASONS FOR RESTRICTIONS ~ XF ANY o'ONTHLY - YTD- CUMULATIVE iii HOURS XN REPORT PERIODS ized NUMBER OF I.IQURS REACTOR HAS CRITICAL 744 744+8 744 744+8 158417+6 99934.2 13'EACTOR RESERVE SHUTDOWN HOURS 8+8 eie 844+4 14'-IOURS GENERATOR ON-LINE 744oe 744' 98598+7 15'NIT RESERVE SHUTDOHN HOURS 8+8 8+8 121+8 16+ GROSS THERNAL ENERGY GENERATED (NHH) 1638267 1638267 204673070 17'ROSS ELECTRICAL ENERGY GENERATED (MHH) 527435 527435 65588311 18'ET ELECTRXCAL ENERGY GENERATED (MWH) 502915 502915 ,62819764 19 i UNIT SERVICE FACTOR ice i 8 188+8 65t5 zei UNIT AVAXLABXLXTYFACTOR 188+8 188+8 65+6 21, CAPACITY FACTOR (USING HDC .NET) 181+5 181 i5 63+2 22, CAF'ACXTY FACTOR (USING DER NET) 97+5 97+5 59i5 23+ UNIT FORCED, OUTAGE RATE 8+8 8+8 12+8 Z4, SHUTDOWNS SCHEDut ED OVER NEXT 6 MONTHS :

2/2/98 $ REFUELING 25 XF SHUT DOWN A'T END OF RFPQRT 'PERIODS ESTXNATED DATE OF STARTUP'

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

DATE Februar 15 1990 COMPLETEDBy D. H. Bonett REPORT MONTH Januar, 1990 Method of Shutting Ucensee Cause & Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Codes Prevent Recurrence Unit 3 operated at essentially full power and had no shutdowns or significant power reductions.

2 F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data 8 - Maintenance or Test 2 - Manual Scram EntryScheetsUcensee C - Refueling 3 - Automatic Scram EventReport(LER)Rle D - Regulatory Restriction 4 - Continued (NURES4161)

E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - OperationalError(Explain) Exhibit 1-Same Source H - Other (Explain)

i~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE Februa 15 1990 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH Zanua 1990 Unit 3 operated at essentially full power and had no shutdowns or significant power reductions.

II AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE Februa 15 1990 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH Zanua 1990 DAY AVERAGE DAILY POWER (MWe-Net)

I'/ 1/90 683 l/

I/ 2/90 3/90 688 662 I/ 4/90 691 I/ 5/90 I/ 7/90 6/90 688 683 I/ 681 I/ 9/90 l/ 8/90 682 604 I/10/90 -17 I/11/90 -12 I/12/90 -12 I/13/90 -12 I/14/98 -12 I/15/90 12 I/16/90 -17 I/17/90 -16 I/18/90 -17 I/l9/90 103 I/20/90 657 I/21/90 687 l/22/90 679 I/23/90 681 l/24/90 684 I/25/90 685 I /.26'/90 690 I/27/90 698 I/28/90 696 I/29/90 '89 I/30/90 686 I/31/90 682

]pi 0 OF'ERATING DATA REF'ORT DOCKET Nn 50 25.1 DATE 2/15/98 COHPLETED E'Y Dt Mt BONI= TT TE:LEPI.IONE 407/694/4432 OPERATING STATUS 1 t UN1:T NAME: TURKEY F'OINT UNIT 4 2, REPORTXNG PERIOD: JANUARY 1990 3 LICENSED THERMAL F'OWER < MWT ): 2208 NAMEPLATE RATING (GROSS HWE)'+

5t DESIGN ELECTRICAL R*TXNG (NET MWE) t 6t MAXIMUM DEPENDABLE CAF'ACITY (GROSS MWE) 7 t HAXIMUM DEPENDAE'LE CAPACITY (NET MWE) t t'99 760 693 666 8, IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUHI= ER 3 THROUGH 7)

.XNCE LAST REFOr;T GIVE REASONS:

POWER LEVEL TO WHICH RESTRICTED~ IF ANY (NET MWE) 18, REASONS FOR RESTRICTIONS. IF AN Y:

MONTHLY - YTD- CUMULATIVE 11 t HOURS XN REPORT F'ERIOD t 744 744 144149t0 12, NUMBER .OF HOURS REACTOR WAS CRITICAL 526t4 526t4 94918tl 13, I"EACTOI'ESERVE SHUTDOWN HOURS Ot0 OtO 166th

14. I.IOURS GENERATOR ON-LTNE 514t5 514t5 91387t3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0't 0 32tl lb. GROSS THERMAL ENE:RGY GENERATED (MWH) li'14526 1114526 192338870
17. GROSS,ELECTRICAL ENERGY GENERATED (HWH) 361945 361945 61355776 18t NET ELECTRICAL ENERGY GENERATED <MWH) 341885 341885 58813845
19. UNIT SI=RVICE FACTOR 69t2 69t2 63t4
28. UNIT AVAILABILITYFACTOR 69t2 69t2 63t4 21.. CAF'ACXTY FACTOR ( USING HDC NET ) 69t0 69t8 61t7
22. CAF'ACITY -FACTOR (USING'ER NET) 66t3 66t3 58 t.l'2t0 2a, UNIT FORCED OUTAGE RATE Ot0 OtO
24. SHUTDOWNS SCI-IEDULED OVER NEXT 6 HONTHS 25 t XF SHUT DOWN AT END OF REPORT PERIOD r ESTIMATED DATE OF STAR1'UI" '

jgi v

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 DATE Februar 15 1990 COMPLETED BY REPORT MONTH .. 4- I Method of Shutting Ucensee Cause & Corrective Down Event System Component Action to Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Codes PreventRecurrence 900109 229. 5 CB PUMPXX Unit 4 was shutdown to repair a reactor coolant pump. Fu11 power operation was resumed after ho1ding at 30Ã power to adjust the secondary chemistry.

4 F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data 8 - Maintenance or Test 2- Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)

G - Operational Error(Explain) Exhibit1-Same Source H - Other (Explain)

ig> ]pi

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE Februa 15 1990 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT'ONTH Zanua 1990 Unit 4 was shutdown to repair a reactor coolant pump. Full power operation was resumed after .holding at 304 power to adjust the secondary chemistry.

0 I \I