Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
~
t ACCELERATED DISTPJBUTION DEMONSTPWTION SYSTEM t
'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION TIERNEY,R. Florida Power & Light Co.
PLUNKETT,T.F. Florida Power & Light Co.
RECIP.NAME'ECIPIENT AFFILIATION
SUBJECT:
Monthl 'ng repts for Apr 1991 for Turkey Point Units D 3,& . /910 tr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES RECIPIENT COPIES RECIPIENT COPIES D
ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 S NRR/DLP LPEB10 1 1 NRR/DOEA/OEAB 1 1 R 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 R
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14
.0. Box 029100, Miami, FI33102-9100
.MAY 09 1991 L-91-144 10: CFR 50.36 U. S. Nuclear Regulatory 'Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
RE: Turkey Point Units 3 and' Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the April 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, ccrc T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc: Stewart 'D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i05i40i98 910430 05000250 PDR ADOCK R PDR
$Q f~. ig ), Q an Fpl Group company
'1
~ q I'h
~ p s e 4)I" 0
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-250 UNIT Turke Point 3 DATE Ma 6 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH A ril 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 04/0 1/9 1 0 04/02/9 1 0 04/03/91 0 04/04/9 1 0 04/05/9 1 0 04/06/91 0 04/07/9 1 0 04/08/9 1 0 04/09/9 1 0 04/10/9 1 0 04/11/9 1 0 04/12/9 1 0 04/13/9 1 0 04/14/9 1 0 04/15/9 1 0 04/16/9 1 0 04/17/9 1 0 04/18/91 0 04/19/91 0 04/20/91 0 04/21/91 0 04/22/91 0 04/23/9 1 0' 04/24/91 04/25/9 1 0 04/26/91 0 04/27/9 1 0 04/28/91 0 04/29/91 0 04/30/9 1 0
OPERATING DATA REPORT D(G(ET.tm 50 250 DATE 5/ 6/91 CONPLETED BY Rr TIERNEY TELEPHONE '385/246/6970 OPERATIHG STATUS lr UNIT ttANEt TUR)KY POINT UNIT 3 2r REPORTIttG PERIOD t APRIL 1991 3i LICENSED THERNAL PSKR (NMT) t 2200 4i tltEPLATE RATIt(G (GROSS NE) l 760 5o DESIGN ELECTRICAL RATING: (HET tsK) t 693 6o MINI DEPBSAME CAPACITY (GROSS tSK) 1 699 7i MINN DEPENDABLE CAPACITY (tKT NE) t 666 8r IF CHAtKES OCCUR IN CAPACITY RATItKS (ITENS NNBER 3 THROUGH 7)
SINCE LAST REPORTr GIVE REASmtSt 9s POHER LEVEL TO HHICH RESTRICTEDr IF AHY (tKT tSK) led REASOttS FOR RESTRICTIOHSr IF AttYa lii HOURS IN REPORT PERIOOt 719 2879 161312r6 12r tINBER OF HOURS REACTOR NS CRITICAL oro e.o 104473r'2 13i REACTOR RESERVE SHUTDII HOURS o,e e,e 844r4 14r HOURS GBKRATOR OH-LItK Oro Oro 103055r7 15> UHIT RESERVE SHUTDOHH HOURS Ore e,e 12ir8 16'ROSS THERNAL B/ERGY GENERATED (tSI) e 0 214231642 17r GROSS ELECTRICAL ENERGY GENERATED (II) e 0 68615991 18r tKT ELECTRICAL BKRGY GBKRATED (ISH) -308 -4133 64874385 19r UHIT SERVICE FACTOR eao 8ie 63r9 20r I(IT AVAILABILITYFACTOR Ore Oro 64re Zii CAPACITY FACTOR (USIttG tmC HET) oio e.o 6ir6 22r CAPACITY FACTOR (USItS DER tKT) o,e e.e 58.e 23'NIT FORCED OUTAGE RATE e.e e.e 12r5 24r SHUTDMtS SCHEDULED OVER HEXT 6 tStHHS 1 25 IF SHUT DNH AT EHD OF REPORT PERIOD ESTIHATED DATE OF STARTUPt 10/83/91
Il 11 I
4
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME Turkey Point 83 DATE Ha -6. 1991 COMPLETED By R. A. Tierne REPORT MONTH A ri 1 1991 TELEPHONE 305 246-6970 Method of Shutting Ucensee Cause & Corrective Down Event System Component Actlonto No. Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Codes Prevent Recurrence 22 901212 719 N/A EE ENGINE Unit 3 was shutdown for a scheduled Upgrades Outage.
4 F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NURE&4161)
E - Operator Training 8c Ucense Examination 5 - Load Reduction F - Adminlstrathre 9 - Other (Exphin)
G - Operational Error(Explain) Exhlbit1-Same Source H - Other(Explain)
II j'
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO'. 50-250 UNIT Turke Point 3 DATE Ma 6 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH A ril 1991 Unit 3 was shutdown on December 12, 1990 for a scheduled Upgrades Outage.
0 ii AVERAGE DAILY UNIT POWER LEVEL DOCKET NO+ 50-251 UNIT Turke Point 4 DATE Ma 6 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH A ril 1991 AVERAGE DAILY POWER LEVEL (MWe>>Net) 04/0 1/9 1 0 04/02/9 1 0 04/03/91 0 04/04/9 1 '0 04/05/91 0 04/06/91 0 04/07/9 1 0 04/08/9 1 0 04/09/91 0 04/10/91 0 04/11/91 0 0 4/12/9 1'. 0 04/13/9 1 0 04/14/9 1 0 04/15/91 0 04/16/91 0 04/17/9 1 0
'04/18/9 1 0 04/19/91 0 04/20/91 0 04/2 1/9 1 0 04/22/91 0 04/23/9 1 0 04/24/91 0 04/25/91 0 04/26/91 0 04/27/91 0 04/28/91 0 04/29/91 0 04/30/91 0
OPERATIttG DATA REPORT DXKET HO 50 " 251 DATE 5/ 6/91 DIPLETED BY Ra TIERHEY TELEPHIK 305/246/6970 OPERATIttG STATUS 2o UHIT HNEl TUfIEY POIHT UHZT 4 2o REPORTIt(G PERIOD t APRIL 1991 3o LICEHSED THERt(AL POHER (NT) 1 2200 4s ttAt(EPLATE'RATItC (GROSS NE) t 760 5i DESIGH ELECTRICAL RATIHG (tKT tsK) t 693 6o MIHUtt DEPEHDABLE 'CAPACITY (GROSS 'NE) t 699 7o MINN DEPEHDABLE CAPACITY (HET NE) t 666 Bo IF CHAt(GES OCCUR Itt CAPACITY RATO(GS (ITBS tIIER 3 THROUGH 7)
SIHCE LAST REPORT~,GIVE REASOHSt 9o PIKR. LEVEL TO HHICH RESTRICTED'F AtA'HET tSK) 20i REASI(S FOR RESTRICTIOHS~ IF At(Y) 22i HOURS IH REPORT PERIODS'2>
719 2879 255044<0 tlt(BER OF HOURS REACTOR HAS CRITICAL OiO Oo0 20228614 23> REACTOR RESERVE SHUTDOIt HOURS OoO Oo0 266<6 24i HOURS GBKRATOR ONLINE '0>0 OeO 97567ii'2>
25o UNIT RESERVE SHUTDOHH HOURS Oi0 OeO 1 26e GROSS THERHAL BKRGY GBKRATED (HHH) 0 0 205630MO 27> GROSS ELECTRICAL BKRGY GBKRATED (NH) 0 0 65612880 28> tKT ELECTRICAL BKRGY GEHERATED (NH) -336 -3023 62050605 29i UHIT SERVICE FACTOR OoO Os0 62>9 20< mtIT AVAILABILITYFACTOR OoO . Oo0 62>9 21o CAPACITY FACTOR (USIHG IIC HET) OoO Oi0 6io2 22< CAPACITY FACTOR (USIHG DER HET) OoO 0,0 57<8 23> UHIT FORCED OUTAGE RATE 0,0 OoO ii<9 24< SHUTDON(S SCHEDULED OVER HEXT 6 tetTHS t 25'F SHUT DOM AT EHD OF REPORT PERIOD~ ESTIHATED DATE OF STARTUPo ii/04/91
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No 50-251 UNITNAME Turkey Point in4 DATE Ma 6 1 COMPLETED BY R. A. T e REPORT MONTH A ri1, 1991 TELEPHONE Method of Shutting Ucensee Cause 8 Corrective Duration Down Event System Component Actionto No. Date Type (Hours) Reason2 Reactor Report>> Code4 Codes Prevent Recurrence 10 901124 S 719 C/H N/A RC/EE FUELXX Unit 4 shutdown for a schedu1ed ENGINE Upgrades and RefuelingtOutage.
2 F Forced Reason Method Exhibit G-instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data 8 - Maintenance or Test 2 - Manual Scram Entry Scheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) Rie D - Regulatory Restriction 4 - Continued (NURE &0161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)
G - Operational Error (Exphin) Exhbit1-Same Source H - Other (Explain)
II ik Ay
,I
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO' 50-251 UNIT Turke Point 4 DATE Ma 6 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH A ril 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 26, 1990.