Category:Letter
MONTHYEARML24311A1882024-11-0808 November 2024 Request to Remove Document from Public Availability and Withhold Proprietary Information from Public Disclosure, Mcguire Nuclear Station, Unit No. 1 ML24304A9602024-11-0505 November 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations IR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 05000369/LER-1923-001, Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error2023-12-13013 December 2023 Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection – U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20234012023-08-0404 August 2023 – Security Baseline Inspection Report 05000369/2023401 and 05000370/2023401 (OUO-SRI) Cover IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 – Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) 2024-08-26
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24302A0702024-10-28028 October 2024 Duke Energy Presubmittal Meeting on Adoption of Westinghouse Analysis PAD5/FSLOCA/AXIOM (EPID L-2024-LRM-0121) on October 28, 2024 ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML22325A3142022-11-30030 November 2022 November 30, 2022, Pre-Submittal Presentation Slides TSTF-505 and 10 CFR 50.69 (L-2022-LRM-0084) ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML21236A2862021-08-30030 August 2021 License Amendment Request for Revision 1 of DPC-NE-1007-P, Conditional Exemption of the End-of-Cycle (EOC) Moderator Temperature Coefficient (Mtc) Measurement Methodology ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18239A3682018-08-27027 August 2018 License Amendment Request Pre-Submittal Conference Call August 29, 2018 ML18089A0532018-03-30030 March 2018 Summary of Public Meeting with McGuire Nuclear Station ML17278A1342017-10-0404 October 2017 Duke Presentation for Public Meeting 09-20-17 ML16242A2382016-08-30030 August 2016 Catawba/Mcguiproposed Changes to Technical Specification 3.8.1, AC Sources - Operating. ML16082A0682016-03-21021 March 2016 Summary of Meeting with the Public Concerning the Annual Assessment of McGuire Nuclear Station, Units 1 and 2 ML15106A0222015-04-15015 April 2015 Summary of Meeting with Public to Discuss Annual Assessment of McGuire Nuclear Station, Units 1 and 2, in Huntersville, North Carolina ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14136A1302014-05-15015 May 2014 End of Cycle Meeting Summary Memo ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13218B2272013-08-0606 August 2013 Vital Battery Replacement, 08-05-13 ML13210A3002013-07-30030 July 2013 Proposed Relief Request 13-MN-002 Risk-Informed/Safety Based (Ris_B) ISI Alternative for Class 1 and 2 Piping ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12128A0522012-05-0303 May 2012 Annual Assessment Meeting, Slides ML11125A0122011-05-0404 May 2011 Summary of Public Meeting with Duke Energy Carolinas, LLC, McGuire, to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for the Period of 01/01/10 - 12/31/10 ML11097A0272011-04-14014 April 2011 Summary of Meeting with Duke Energy Carolinas, LLC, on Upcoming Submittal of License Amendments Regarding Implementation of National Fire Protection Association Standard 805, (TACs ME5767 & ME5768, Catawba 1 & 2 ME5769 & ME5770 Mcguire 1 & ML0927304602009-10-0707 October 2009 09/01/2009 Summary of Conference Call with Duke Regarding Responses to Generic Letter (GL) 2004-02. Meeting Handouts ML0833000612008-11-24024 November 2008 Meeting Slides for Category 1 Public Meeting with Duke Energy Carolinas, Regarding a Request for Additional Information on Duke'S Response to GL 200-04 ML0826708642008-09-18018 September 2008 Regulatory Conference - Service Water Strainer Backwash System ML0819903672008-07-15015 July 2008 Handouts from Duke Energy & NRC Meeting - NQA-1 Based QA Program Conversion ML0719903572007-04-30030 April 2007 EOC Meeting Slides ML0611601322006-04-25025 April 2006 Slides from McGuire Nuclear Station Annual Assessment Meeting ML0519902612005-04-19019 April 2005 NRC Cy 2004 Annual Assessment Meeting, McGuire Nuclear Station ML0510103142005-04-0101 April 2005 Attachment 1, ASME Wall Tap Flow Nozzles for Mur Uprate Summary of Meeting with Duke Energy Corp on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240) ML0510103232005-04-0101 April 2005 Attachment 2, Bill of Material - QA Condition 4, Drawing D-4737-2A,18-900# Sch ASME PIC-6 Primary Feedwater Flow Sectionsummary of Meeting with Duke Energy Corp on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240) ML0502501572004-12-0606 December 2004 Meeting Presentation Slides to 12/06/2004 Summary of Meeting with Duke Energy Corporation to Discuss Appendix R Reconstitution and Transition to NFPA 805 ML0421903532004-07-30030 July 2004 Summary of 07/27/2004 Meeting with Duke Energy Corp. Re. Modification to Quality Assurance Program for Catawba, McGuire, and Oconee Nuclear Station, Attachment 2 - Meeting Handouts ML0421501022004-07-20020 July 2004 Presentation of 07/20/2004, Plant Performance Update Meeting (Mcguire) ML0411105312004-04-0808 April 2004 Duke Energy Corporation Meeting Handouts, Enclosure 2, Meeting Summary ML0327206212003-09-24024 September 2003 Examiner - Vendor Matrix with Phone Number ML0327206112003-09-22022 September 2003 Exam Process ML0309806272003-04-0404 April 2003 Annual Assessment Meeting for McGuire Nuclear Station ML0308002472002-12-10010 December 2002 Meeting Handouts December 10-11, 2002 Duke-FPL-NRC Meeting Racksaver Licensing ML0232403132002-11-22022 November 2002 Meeting Summary Enclosure 2 Handouts. Includes NEI Presentation Industry Comments on NRC Program Plan. ML0233301042002-10-0101 October 2002 Enclosure 2 to the 10/01/2002, Summary of Public Meeting with Duke Energy Corporation, Informal Response to McGuire Units 1 & 2 and Catawba Units 1 & 2 Safety Evaluation Report with Open Items ML0215403652002-05-23023 May 2002 Stations Meeting Handouts to Discuss Topical Report DPC-NE-1005P, Nuclear Design Methodology Using CASMO-4/SIMULATE-3 MOX, Submittal by Duke ML0213404582002-05-16016 May 2002 Training Managers Conference Handouts ML0206300272002-02-0505 February 2002 K. Lindquist Northeast Technology Corp 02/05/2002 Meeting Presentation Badger & Racklife. 2024-04-09
[Table view] Category:Meeting Summary
MONTHYEARML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML23118A2852023-05-0202 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Catawba Nuclear Station, McGuire Nuclear and Oconee Nuclear Station ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22094A1112022-04-0404 April 2022 Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21236A2832021-09-22022 September 2021 Summary of August 30, 2021, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Moderator Temperature Coefficient Methodology Revision ML21099A0932021-04-0909 April 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Catawba, McGuire, and Oconee Nuclear Stations ML20141L4172020-05-20020 May 2020 EOC Public Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML19088A1362019-03-29029 March 2019 Public Meeting Summary ML18250A0952018-09-20020 September 2018 Summary of August 29, 2018, Licensing Meeting with Duke Energy to Discuss a Planned License Amendment Request to Revise TS 4.2.2, Control Rod Assemblies to Permit Operation with One Less than the Required Number ML17293A0232018-05-0404 May 2018 Summary of 9/20/17, Meeting with Duke Energy to Discuss LAR to Extend Completion Time for an Inoperable Emergency Diesel Generator and Electrical Alignments for Shared Systems for Catawba and McGuire (CAC Nos. MF9667-74; Epids L-2017-LLA-02 ML18089A0532018-03-30030 March 2018 Summary of Public Meeting with McGuire Nuclear Station ML17110A1862017-04-20020 April 2017 Summary of Public Meeting - McGuire, Units 1 and 2 to Discuss Concerning Annual Assessment ML16264A1232016-10-12012 October 2016 September 14, 2016, Summary of Category 2 Public Meeting with Duke Energy Carolinas to Discuss Seismic Probabilistic Risk Assessments Associated with Implementation of Japan Lessons-Learned Near-Term Task Force R2.1, Seismic, for Catawba Nu ML16264A1022016-10-0505 October 2016 Summary of Pre-Licensing Meeting with Duke Energy to Discuss Proposed License Amendment Request to Extend Completion Time for an Inoperable Diesel Generator for Catawba Nuclear Station & McGuire Nuclear Stations (Cac. Nos. MF8102-MF8105) ML16082A0682016-03-21021 March 2016 Summary of Meeting with the Public Concerning the Annual Assessment of McGuire Nuclear Station, Units 1 and 2 ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML15138A3392015-06-0101 June 2015 Summary of Public Teleconference Regarding Potential Submission of a License Amendment Request for a One-Time Extension of Completion Time for Nuclear Service Water System ML15117A5812015-05-0606 May 2015 April 14, 2015, Summary of Public Meeting on Calculation of Risk for NFPA-805 Fire Areas Crediting Control Room Abandonment ML15106A0222015-04-15015 April 2015 Summary of Meeting with Public to Discuss Annual Assessment of McGuire Nuclear Station, Units 1 and 2, in Huntersville, North Carolina ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13235A1312013-09-0404 September 2013 Summary of July 30, 2013, Pre-Application Teleconference with Duke Energy Carolinas, LLC to Discuss Proposed Risk-Informed In-Service Inspection, 4th Interval Relief Request (TAC Nos. MF2458 and MF2459) ML13235A2462013-09-0404 September 2013 August 7, 2013, Summary of Pre-Application Teleconference with Duke Energy Carolinas, LLC, to Discuss Proposed License Amendment Request (TAC Nos. MF2435 and MF2436) ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13127A0502013-05-20020 May 2013 Summary of April 18, 2013, Meeting with Duke Energy Concerning the National Fire Protection Association (NFPA) 805: Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML13129A4302013-05-0808 May 2013 Summary of Public Meeting with McGuire to Discuss Annual Assessment for Year 2012 ML12128A0432012-05-0303 May 2012 4/25/2012 - Public Meeting Summary - McGuire Station to Discuss the Nrc'S Reactor Oversight Process (ROP) and the Nrc'S Annual Assessment of Plant Safety Performance for 2011 ML11125A0122011-05-0404 May 2011 Summary of Public Meeting with Duke Energy Carolinas, LLC, McGuire, to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for the Period of 01/01/10 - 12/31/10 ML11097A0272011-04-14014 April 2011 Summary of Meeting with Duke Energy Carolinas, LLC, on Upcoming Submittal of License Amendments Regarding Implementation of National Fire Protection Association Standard 805, (TACs ME5767 & ME5768, Catawba 1 & 2 ME5769 & ME5770 Mcguire 1 & ML1034807072010-12-14014 December 2010 Public Meeting Summary - Duke Quality Assurance Program Discussion Meeting ML1030810242010-11-10010 November 2010 Summary of November 1, 2010, Meeting with Duke to Discuss Responses to Generic Letter (GL) 2004-02 (Tac Nos. MC4673, MC4674, MC4692, and MC4693) ML1027307852010-11-0303 November 2010 Summary of September 23, 2010 Conference Call with Duke Regarding Potential License Amendment Request ML1023804682010-08-26026 August 2010 08/18/10 Summary of Meeting NRC Initial Exam Writer'S Workshop ML0926700202009-10-0707 October 2009 Summary of Conference Call with Duke Regarding Responses to Generic Letter (GL) 2004-02 ML0923803922009-08-26026 August 2009 08/11-12/2009-Summary of Meeting Re 2009 Us NRC Initial Exam Development Workshop ML0912803172009-05-0808 May 2009 End of Cycle Public Meeting Summary ML0833103972008-12-0303 December 2008 Summary of Meeting to Discuss 11/21/2008 and 11/18/2008 Requests for Additional Information GL 2004-04, Potential Impact of Debris Blockage of Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors L-04-004, 11/24/2008 - Summary of Meeting to Discuss 11/21/2008 and 11/18/2008 Requests for Additional Information GL 2004-04, Potential Impact of Debris Blockage of Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-12-0303 December 2008 11/24/2008 - Summary of Meeting to Discuss 11/21/2008 and 11/18/2008 Requests for Additional Information GL 2004-04, Potential Impact of Debris Blockage of Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML0826708582008-09-23023 September 2008 Summary of Public Meeting with McGuire and Enclosure 1 ML0820604872008-08-0606 August 2008 Summary of Meeting to Discuss Transition from Duke'S Current Quality Assurance Program to American Society of Mechanical Engineers NQA-1-1994 ML0811601392008-05-14014 May 2008 Summary of Meeting Regarding the Petition for Enforcement Action Pursuant to 10 CFR 2.206 on McGuire, Units 1 & 2 IR 05000369/20070082007-10-0404 October 2007 Notice of Regulatory Conference with Duke Energy Corporation to Discuss the Risk Significance of the Inspection Finding Documented in Inspection Report 05000369, 370/2007008 ML0621305672006-08-0101 August 2006 Summary of 07/19 - 07/20/2006 Meeting - 2006 Initial Exam Development Workshop ML0601800062006-03-28028 March 2006 Meeting Summary, Reload Design and Safety Analysis Methodology ML0509300292005-04-0101 April 2005 Summary of Meeting with Duke Energy Corp McGuire Units 1 & 2 on Measurement Uncertainty Recapture Power Uprate ML0434401102004-12-14014 December 2004 Summary of Meeting with Duke Energy Corporation to Discuss Appendix R Reconstitution and Transition to NFPA 805 2024-05-01
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24302A0702024-10-28028 October 2024 Duke Energy Presubmittal Meeting on Adoption of Westinghouse Analysis PAD5/FSLOCA/AXIOM (EPID L-2024-LRM-0121) on October 28, 2024 ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23087A2972023-04-17017 April 2023 Annual Assessment Meeting Presentation ML22325A3142022-11-30030 November 2022 November 30, 2022, Pre-Submittal Presentation Slides TSTF-505 and 10 CFR 50.69 (L-2022-LRM-0084) ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21236A2862021-08-30030 August 2021 License Amendment Request for Revision 1 of DPC-NE-1007-P, Conditional Exemption of the End-of-Cycle (EOC) Moderator Temperature Coefficient (Mtc) Measurement Methodology ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML20125A2312020-05-0404 May 2020 EOC Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18089A0532018-03-30030 March 2018 Summary of Public Meeting with McGuire Nuclear Station ML17278A1342017-10-0404 October 2017 Duke Presentation for Public Meeting 09-20-17 ML16210A0372016-07-28028 July 2016 16-MN-003 1RN884 Pipe Layout Drawing MC-1418-14.41-02 Info Only ML16082A0682016-03-21021 March 2016 Summary of Meeting with the Public Concerning the Annual Assessment of McGuire Nuclear Station, Units 1 and 2 ML15230A5942015-08-10010 August 2015 MNS Ice Condenser Door LAR Presentation - 08/12/15 ML15106A0222015-04-15015 April 2015 Summary of Meeting with Public to Discuss Annual Assessment of McGuire Nuclear Station, Units 1 and 2, in Huntersville, North Carolina ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14136A1302014-05-15015 May 2014 End of Cycle Meeting Summary Memo ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13218B2272013-08-0606 August 2013 Vital Battery Replacement, 08-05-13 ML13210A3002013-07-30030 July 2013 Proposed Relief Request 13-MN-002 Risk-Informed/Safety Based (Ris_B) ISI Alternative for Class 1 and 2 Piping ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12128A0522012-05-0303 May 2012 Annual Assessment Meeting, Slides ML11125A0122011-05-0404 May 2011 Summary of Public Meeting with Duke Energy Carolinas, LLC, McGuire, to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for the Period of 01/01/10 - 12/31/10 ML11097A0272011-04-14014 April 2011 Summary of Meeting with Duke Energy Carolinas, LLC, on Upcoming Submittal of License Amendments Regarding Implementation of National Fire Protection Association Standard 805, (TACs ME5767 & ME5768, Catawba 1 & 2 ME5769 & ME5770 Mcguire 1 & ML1034807072010-12-14014 December 2010 Public Meeting Summary - Duke Quality Assurance Program Discussion Meeting ML0833000612008-11-24024 November 2008 Meeting Slides for Category 1 Public Meeting with Duke Energy Carolinas, Regarding a Request for Additional Information on Duke'S Response to GL 200-04 ML0826708642008-09-18018 September 2008 Regulatory Conference - Service Water Strainer Backwash System ML0826708692008-09-18018 September 2008 Nuclear Service Water (Rn) Strainer ML0819903672008-07-15015 July 2008 Handouts from Duke Energy & NRC Meeting - NQA-1 Based QA Program Conversion ML0819805012008-04-22022 April 2008 Annual Assessment Public Meeting; Reactor Oversight Program - Cy 2007, April 22, 2008 ML0734403862007-10-25025 October 2007 Enclosure 3 - McGuire Nuclear Station Regulatory Conference - Foreign Material Found in the Unit 2 ECCS Sump ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0617400102006-05-19019 May 2006 Technical Information Meeting ML0611601322006-04-25025 April 2006 Slides from McGuire Nuclear Station Annual Assessment Meeting ML0519902612005-04-19019 April 2005 NRC Cy 2004 Annual Assessment Meeting, McGuire Nuclear Station ML0510103142005-04-0101 April 2005 Attachment 1, ASME Wall Tap Flow Nozzles for Mur Uprate Summary of Meeting with Duke Energy Corp on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240) ML0502501572004-12-0606 December 2004 Meeting Presentation Slides to 12/06/2004 Summary of Meeting with Duke Energy Corporation to Discuss Appendix R Reconstitution and Transition to NFPA 805 ML0418906002004-04-15015 April 2004 NRC CY2003 Annual Assessment Meeting ML0403506912003-08-27027 August 2003 DRS Open Items Status ML0403502122003-08-13013 August 2003 DRS Open Items Status ML0403506872003-08-0505 August 2003 DRS Open Item Status ML0313301472003-04-29029 April 2003 Plant Performance Update Meeting for McGuire Nuclear Station ML0309806272003-04-0404 April 2003 Annual Assessment Meeting for McGuire Nuclear Station ML0232901842002-11-20020 November 2002 Slides for 11/4/2002 Lrsc Meeting 2024-04-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 4, 2011 Mr. Regis T. Repko Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078
SUBJECT:
PUBLIC MEETING
SUMMARY
- MCGUIRE NUCLEAR STATION - DOCKET NOS. 50-369 AND 50-370
Dear Mr. Repko:
This refers to the meeting conducted on April 27, 2011, in Huntersville, NC. The purpose of this meeting was to discuss the NRC's Reactor Oversight Process (ROP) and the NRC's annual assessment of plant safety performance for the period of January 1, 2010, to December 31, 2010. The major topics addressed were the NRC's assessment program and the results of the assessment. A listing of meeting attendees and information presented during the meeting are enclosed.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4607.
Sincerely,
/RA/
Jonathan H. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17
Enclosures:
- 1. List of Attendees
- 2. Powerpoint Presentation cc w/encls: (See page 2)
Mr. Regis T. Repko Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078
SUBJECT:
PUBLIC MEETING
SUMMARY
- MCGUIRE NUCLEAR STATION - DOCKET NOS. 50-369 AND 50-370
Dear Mr. Repko:
This refers to the meeting conducted on April 27, 2011, in Huntersville, NC. The purpose of this meeting was to discuss the NRC's Reactor Oversight Process (ROP) and the NRC's annual assessment of plant safety performance for the period of January 1, 2010, to December 31, 2010. The major topics addressed were the NRC's assessment program and the results of the assessment. A listing of meeting attendees and information presented during the meeting are enclosed.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4607.
Sincerely,
/RA/
Jonathan H. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17
Enclosures:
- 1. List of Attendees
- 2. Powerpoint Presentation cc w/encls: (See page 2)
X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:__ ML11125A012 _ G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE EJS /RA/ JHB /RA/
NAME EStamm JBartley DATE 05/04/2011 05/04/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRPII\RPB1\MCGUIRE\MEETINGS\MCGUIRE 2010 EOC MEETING
SUMMARY
.DOCX
DEC 2 cc w/encl: David A. Baxter Steven D. Capps Vice President, Nuclear Engineering Station Manager Duke Energy Carolinas, LLC Duke Energy Carolinas, LLC Electronic Mail Distribution Electronic Mail Distribution Dhiaa M. Jamil Peter Schuerger Group Executive and Chief Nuclear Officer Training Manager Duke Energy Carolinas, LLC Duke Energy Carolinas, LLC Electronic Mail Distribution Electronic Mail Distribution C. Jeff Thomas Fleet Regulatory Compliance & Licensing Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Kenneth L. Ashe Regulatory Compliance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Lara Nichols Associate General Counsel Duke Energy Corporation Electronic Mail Distribution Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 David A. Repka Winston Strawn LLP Electronic Mail Distribution County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution
DEC 3 Letter to Regis T. Repko from Jonathan H. Bartley dated May 4, 2011
SUBJECT:
PUBLIC MEETING
SUMMARY
- MCGUIRE NUCLEAR STATION - DOCKET NOS. 50-369 AND 50-370 Distribution w/encl:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource 2
Enclosure 1
McGuire Nuclear Station Annual Assessment Meeting Reactor Oversight Process - 2010 Nuclear Regulatory Commission - Region II Huntersville, NC April 27, 2011 1
Enclosure 2
2 Purpose of Todays Meeting
- A public forum for discussion of the licensees performance in 2010
- NRC will address the performance issues identified in the annual assessment letter 2
Enclosure 2
3 Agenda
- Review of Reactor Oversight Process
- National Summary of Plant Performance
- Discussion of Plant Performance Results
- NRC available to address public questions 3
Enclosure 2
4 Region II Organization Victor McCree Regional Administrator Len Wert Deputy Regional Administrator Division of Reactor Safety Division of Reactor Projects Joel Munday, Director Rick Croteau, Director Harold Christensen, Deputy Bill Jones, Deputy Director Director Projects Branch 1 Jonathan Bartley, Chief Regional Specialist Inspectors (404) 997-4607 Resident Inspectors (RI)
Project Engineers (PE)
Joe Brady, Senior RI Curt Rapp, Senior PE Jermaine Heath, RI Eric Stamm, PE RI Office: (704) 875-1681 4
Enclosure 2
5 Our Mission
- To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
5 Enclosure 2
6 Some Nuclear Facts
- 104 nuclear power plants supply about 20 percent of the electricity in the U.S.
- Nuclear materials are used in medicine for diagnosis and cancer treatment.
- Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.
6 Enclosure 2
7 The NRC Regulates
- Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs
- Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use
- Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities
- Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks 7
Enclosure 2
8 What We Dont Do
- Regulate nuclear weapons, military reactors, or space vehicle reactors
- Own or operate nuclear power plants
- Regulate some radioactive materials, such as X-rays and naturally occurring radon 8
Enclosure 2
9 How We Regulate
- Establish rules and regulations
- Provide oversight through inspection, enforcement, and evaluation of operational experience
- Conduct research to provide support for regulatory decisions
- Respond to events and emergencies 9
Enclosure 2
10 Assurance of Plant Safety
- Require long-term maintenance of equipment
- Operators licensed by NRC and required requalification training
- Verify compliance with regulations
- Resident Inspectors stationed at each site 10 Enclosure 2
11 What We Do - Nuclear Waste
- Storage of spent reactor fuel in fuel pools or dry storage casks, and
- Any national spent fuel storage site, such as the proposed Yucca Mountain site.
11 Enclosure 2
12 What We Do - Nuclear Security
- Well-armed and well-trained security forces,
- Surveillance and perimeter patrols,
- State-of-the-art site access equipment and controls,
- Physical barriers and detection zones, and
- Intrusion detection systems and alarm stations.
12 Enclosure 2
13 NRC Performance Goals
- Safety: Ensure adequate protection of public health and safety and the environment.
- Security: Ensure adequate protection in the secure use and management of radioactive materials.
13 Enclosure 2
14 Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 14 Enclosure 2
15 Regulatory Framework 15 Enclosure 2
16 Examples of Baseline Inspections
- Equipment Alignment ~80 hrs/yr
- Triennial Fire Protection ~250 hrs (every 3 yrs)
- Operator Response ~125 hrs/yr
- Rad Release Controls ~110 hrs (every 2 yrs)
- Worker Radiation Protection ~95 hrs/yr
- Corrective Action Program ~250 hrs (every 2 yrs)
- Corrective Action Case Reviews ~60 hrs/yr 16 Enclosure 2
17 Significance Threshold Significance of PIs/Findings Green: Very low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue 17 Enclosure 2
18 Action Matrix Concept Licensee Regulatory Degraded Multiple/R ep. Unacceptable Response Response Cornerstone Degraded Perform ance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 18 Enclosure 2
19 National Summary of Plant Performance Status as of 12/31/2010 Licensee Response 89 Regulatory Response 9 Degraded Cornerstone 6 Multiple/Repetitive Deg. Cornerstone 0 Unacceptable 0 Total 104 19 Enclosure 2
20 National Summary
- Performance Indicator Results for 2010*
- Green 7009
- White 23
- Yellow 0
- Red 0
- PIs are counted per plant per quarter
- Total Inspection Findings in 2010
- Green 816
- White 9
- Yellow 2
- Red 0 Finding data current as of 3/3/2011 20 Enclosure 2
21 McGuire Assessment Results January 1 - December 31, 2010
- Regulatory Response Column for first quarter 2010
- Licensee Response Column for remaining three quarters of 2010 21 Enclosure 2
22 Safety Significant Findings or PIs
- None. All findings and Performance Indicators were Green.
22 Enclosure 2
23 McGuire Inspection Activities January 1 - December 31, 2010 9,709 hours0.00821 days <br />0.197 hours <br />0.00117 weeks <br />2.697745e-4 months <br /> of inspection-related activities including:
- Resident Inspection (1,851 hours0.00985 days <br />0.236 hours <br />0.00141 weeks <br />3.238055e-4 months <br />)
- 95001 Supplemental Inspection
- 92723 Traditional Enforcement Follow-up Inspection
- Ground Water Initiative Inspection
- Independent Spent Fuel Storage Installation Operational Inspection
- Biennial Problem Identification & Resolution Inspection
- Biennial Licensed Operator Requalification Inspection
- Biennial Modifications Inspection
24 McGuire Nuclear Station Annual Assessment Summary January 1 - December 31, 2010
- Duke Energy operated McGuire in a manner that preserved public health and safety
- All cornerstone objectives were met
- NRC plans baseline inspections at McGuire for 2011 24 Enclosure 2
25 Open to the Public
- The NRC places a high priority on keeping the public and stakeholders informed of its activities.
- Find public meeting dates and transcripts;
- Read NRC testimony, speeches, press releases, and policy decisions; and
- Access the agencys Electronic Reading Room to find NRC publications and documents.
25 Enclosure 2
26 What Do You Think of the ROP?
The biennial ROP external survey is coming 3rd Quarter 2011, and we want to hear from you!
Email ROPsurvey@nrc.gov to be notified when the ROP survey is available.
For information on ROP stakeholder feedback, please visit our website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS
/program-evaluations.html#section3 26 Enclosure 2
27 Contacting the NRC
- (301) 816-5100 (call collect)
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs 27 Enclosure 2
28 NRC Representatives
- Rick Croteau, Director, Division Reactor Projects (DRP)
- (404) 997-4500
- Jonathan Bartley, Branch Chief
- (404) 997-4607
- Joe Brady, Senior Resident Inspector
- (704) 875-1681
- (704) 875-1682
- (404) 997-4417 28 Enclosure 2
29 Reference Sources
- Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- Public Document Room 800-397-4209 (Toll Free) 29 Enclosure 2