NRC CY2003 Annual Assessment Meeting
ML041890600
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/15/2004
From:
NRC/RGN-II
To:
References
Download: ML041890600 (21)


Text

NRC CY2003 NRC CY2003 Annual Assessment Meeting Annual Assessment Meeting McGuire Nuclear Station McGuire Nuclear Station Huntersville, North Carolina Huntersville, North Carolina April 15, 2004 April 15, 2004

Purpose of Todays Meeting

 A public forum for discussion of the licensees performance

 NRC will address the licensee performance issues identified in the annual assessment letter

 Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

Agenda

 Introduction

 Review of Reactor Oversight Process

 National Summary of Plant Performance

 Discussion of Plant Performance Results

 Licensee Response and Remarks

 NRC Closing Remarks

 Break

 NRC available to address public questions

Region II Organization Luis Reyes Regional Administrator Loren Plisco Deputy Regional Administrator Victor McCree Director Division of Reactor Projects Len Wert Deputy Director Charles Casto Director Division of Reactor Safety Harold Christensen Deputy Director Robert Haag Branch Chief McGuire Resident Inspectors Joseph Brady Shakur Walker Project Engineers Robert Carroll Michael Pribish

NRC Performance Goals

 Maintain safety and protect the environment

 Enhance public confidence

 Improve effectiveness, efficiency, and realism of processes and decision making

 Reduce unnecessary regulatory burden

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspections

 Equipment Alignment

~92 hrs/yr

 Triennial Fire Protection

~200 hrs every 3 yrs

 Operator Response

~125 hrs/yr

 Emergency Preparedness

~80 hrs/yr

 Rad Release Controls

~100 hrs every 2 yrs

 Worker Radiation Protection ~100 hrs/yr

 Corrective Action Program

~200 hrs every 2 yrs

 Corrective Action Case Reviews ~60 hrs/yr

McGuire Nuclear Station Inspection Activities (Jan 1 - Dec 31, 2003)

 3900 hours0.0451 days <br />1.083 hours <br />0.00645 weeks <br />0.00148 months <br /> of inspection related activities

 Engineering Inspections

 Emergency Preparedness Inspection

 Initial and Requalification Exam Inspection

 Radiation Protection Inspections

 Security Inspection

 Reactor Pressure Vessel Lower Head Inspection

 Triennial Fire Protection Inspection

Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very Low safety issue White:

Low to moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2

Multiple/Repetitive Degraded Cornerstone 3

Unacceptable 0

Total 102*

  • Davis-Besse is under a special restart inspection process (IMC 0305)

McGuire Nuclear Station Assessment Results (Jan 1 - Dec 31, 2003)

Plant performance was within the Licensee Response Column of the NRCs Action Matrix

All inspection finding were classified as very low safety significance (Green)

All Performance Indicators were Green

McGuire Nuclear Station Annual Assessment Summary (Jan 1 - Dec 31, 2003)

 Duke Energy operated McGuire Nuclear Station in a manner that preserved public health and safety

 All cornerstone objectives were met

McGuire Nuclear Station Inspection Activities (Jan 1 - Dec 31, 2004)

 Baseline Inspections

 Reactor Containment Sump Blockage Inspection

 Reactor Vessel Lower Head Inspection

 ISFSI Inspection

 Operator Licensing Examinations

Licensee Response and Remarks

Contacting the NRC

 Report an emergency (301) 816-5100 (call collect)

 Report a safety concern:

(800) 695-7403 Allegation@nrc.gov

 General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources

 Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

 Public Electronic Reading Room http://www.nrc.gov/reading-rm.html

 Public Document Room 1-800-397-4209 (Toll Free)

McGuire 1 4Q/2003 Performance Summary

McGuire 1 2003 Performance Summary

McGuire 2 4Q/2003 Performance Summary

McGuire 2 2003 Performance Summary