ML15138A339
| ML15138A339 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 06/01/2015 |
| From: | Geoffrey Miller Plant Licensing Branch II |
| To: | Robert Pascarelli Plant Licensing Branch II |
| Miller G | |
| References | |
| Download: ML15138A339 (4) | |
Text
MEMORANDUM TO:
FROM:
SUBJECT:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 1, 2015 Robert J. Pascarelli, Chief Plant Licensing Branch 11-1 Division of Operating Reactor Licensing
~
Office of Nuclear Reactor Regulation G. Edward Miller, Project Manager
&~'t l c{
1" '-\\
Plant Licensing Branch 11-1 v
Division of Operating Reactor Licensing
- Office of Nuclear Reactor Regulation
SUMMARY
OF MAY 13, 2015, PUBLIC TELECONFERENCE REGARDING POTENTIAL SUBMISSION OF A LICENSE AMENDMENT REQUEST FOR A ONE-TIME EXTENSION OF COMPLETION TIME FOR NUCLEAR SERVICE WATER SYSTEM On May 13, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff held a public teleconference1 with the Duke Energy Carolinas (Duke or licensee). The purpose of the meeting was to discuss Duke's intent to submit a license amendment request (LAR) for a one-time extension of the completion time for one train of the Nuclear Service Water System.
During the meeting, Duke presented slides2 that detailed the planned maintenance and discussed the information to be included in the LAR. After the licensee presented the slides, the NRC staff provided the following feedback. A list of attendees is provided in the enclosure.
Slide 2 Provide detailed drawings for the ultimate heat sink (UHS) and NSWS Describe the Modes of applicability for the change Provide the current technical specification Bases for the NSWS and UHS Slides 6 and 7 Describe expected maintenance evolution and criteria for termination Slide 8 Address water hammer for the piping that has been dewatered Provide detail of the pipe manway and its restoration Describe where the pipe contents will be flushed with respect to debris clogging Describe the post-maintenance acceptance testing Address leakage from the flange at the intake 1 The original meeting notice is available via the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML15118A479.
2 The licensee's slides are available under ADAMS Accession No. ML15132A064.
Slide 11 Address all associated weather that could impact the maintenance evolution including the time needed to secure the activity as compared to warning time Slides 12 and 13 Address the plant status with respect to Title 10 of the Codf? of Federal Regulations (10 CFR) Section 50.65(a)(4) during the evolution Provide any recent dam inspection results Address foreign materials control Provide detail on the closure procedure for the pipe access Slide 14 Ensure the licensing basis of utilizing the intake crosstie is clearly described Slides 18 and 19 Ensure that continued compliance with 10 CFR Part 73 Slides 20 and 21 Address what equipment will be considered protected during the evolution Address the risk associated with external events during the evolution No regulatory decisions were made and the licensee indicated that they would consider the feedback provided by the NRC staff. The licensee indicated that the LAR would likely be submitted and request approval by November. The NRC staff noted that once the LAR was received, they would review the workload and evaluate what schedule was feasible.
Following the discussion, an opportunity was afforded to any other participants who wished to ask questions or make comments. No questions or comments were received.
CONTACT: G. Edward Miller, NRR/DORL/LPL2-1 301-415-2481
Enclosure:
List of Attendees
Sign In Sheet DATE: May 13, 2015 Name 14 d1..(_Gn.
G~C, LA.STO R 013 E '--'-'0.,,-
L/t(l.fl.. '1 uJHa: c..e r?.
~OL<t.Jt:~TOIV Gco~G? MuRfrfY
~FF 'Rol3r-12T.9:>/l.I
/ EP.r?.. y ~
'i>t:?l!JO tv fifrCHltC:L t?.rcHAA..1)9'µ
/(E Y-
~RYlttv /111-17/t..Ol..L rKoB /sBGu..
~f<E!;) ?tT/lllAv 5rcuG ;V/~Y Pre-Application Meeting for NSWS LAR Organization tJR~ bo~L Lf'Ll- \\
N~R b5..S 1sBPi)
Nt?.r< uss1 $1SB A){((( "t>.s-s SB?B
- V~/l-. bs~ I srsts but<.
Du1c
- Ou1<f
- buKF
'{)utC bv,~e-Vu Ke J),)(<c EPM Enclosure
- Concurrence via e-mail OFFICE DORL/LPL2-1 /PM DORL/LPL2-1/LA DSS/SBPB DS/STSB NAME GEMiller SFigueora LWheeler*
CTilton*
DATE.
05/21 /15 05/20/15 05/20/15 05/28/15