MONTHYEARML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24029A1142024-01-29029 January 2024 Notification of Inspection and Request for Information ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection – U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station – Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 IR 05000369/20220052022-08-29029 August 2022 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 ML22094A0952022-04-0606 April 2022 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20210062022-03-0202 March 2022 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 (Report 05000369/2021006 and 05000370/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML22010A0732022-01-0606 January 2022 50.59 Inspection Information Request ML21267A2782021-09-23023 September 2021 50.59 Inspection Information Request IR 05000369/20210052021-08-23023 August 2021 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000369/2021005 and 05000370/2021005) IR 05000369/20200062021-03-0303 March 2021 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2020006 and 05000370/2020006 ML21020A0682021-01-20020 January 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000369/2021011 and 05000370/2021011) and Request for Information (RFI) ML20280A6722020-10-0606 October 2020 Notfication of McGuire Nuclear Station Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000369/2021010 and 05000370/2021010 IR 05000369/20200052020-08-17017 August 2020 Updated Inspection Plan for Mcguire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2020005 and 05000370/2020005) IR 05000369/20190062020-03-0303 March 2020 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 - NRC Inspection Report 05000369/2019006 and 05000370/2019006 IR 05000369/20190052019-08-26026 August 2019 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000369/2019005 and 05000370/2019005) IR 05000369/20180062019-03-0404 March 2019 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2018006 and 05000370/2018006 ML18333A0912018-11-29029 November 2018 Op Ess 201801 RFI - SD IR 05000369/20180052018-08-20020 August 2018 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 -NRC Inspection Report 05000369/2018005 and 05000370/2018005 ML18074A0162018-03-15015 March 2018 Emailed Hs 2018002 Hs ML18059A0932018-02-28028 February 2018 EOC Assessment Letter IR 05000369/20170052017-08-16016 August 2017 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2017005 and 05000370/2017005 ML17114A4992017-04-17017 April 2017 Emergency Preparedness Inspection and Request for Information IR 05000369/20160062017-03-0101 March 2017 Annual Assessment Letter for McGuire Nuclear Station, Units 1 & 2 -NRC Inspection Report 05000369/2016006 and 05000370/2016006 ML17024A2812017-01-23023 January 2017 William B. McGuire Nuclear Plant - Notification of Inspection and Request for Information IR 05000369/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2016005 and 05000370/2016005) ML16082A1362016-03-21021 March 2016 Requalification Program Inspection - McGuire Nuclear Station ML16062A2152016-03-0202 March 2016 Annual Assessment Letter ML16061A0252016-02-29029 February 2016 PIR Notification Letter 2016 ML16032A0922016-01-29029 January 2016 William B. McGuire Nuclear Station, Unit 1, Notification of Inspection and Request for Information ML16026A5912016-01-26026 January 2016 William B. McGuire - Notification of Inspection and Request for Information ML15251A2242015-09-0202 September 2015 Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U. S. Nuclear Regulatory Commission Inspection Report 05000369/2015008 and 05000370/2015008 IR 05000369/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2015005 and 05000370/2015005) IR 05000369/20140012015-03-0404 March 2015 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2014001 and 05000370/2014001) ML14351A0182014-12-12012 December 2014 IR 05000369/2015007 and 05000370/2015007, Notification of McGuire, Units 1 and 2, Component Design Bases Inspection ML14245A1322014-09-0202 September 2014 Mid-Cycle 2014 Letter ML14063A1572014-03-0404 March 2014 2013 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 ML13246A1622013-09-0303 September 2013 Mid Cycle Assessment Letter IR 05000369/20120012013-03-0404 March 2013 Annual Assessment Letter for McGuire, Units 1 & 2, (IR 05000369-12-001 and 05000370-12-001) ML12248A0592012-09-0404 September 2012 Mid Cycle Assessment Letter McGuire 2012 ML12066A0272012-03-0505 March 2012 Report 22, Inspection Activity Plan ML11364A0192011-12-12012 December 2011 Fourth Inservice Inspection Interval Plan ML1124403202011-09-0101 September 2011 Report 22, Inspection/Activity Plan, 09/01/2011- 12/31/2012 ML1106301172011-03-0404 March 2011 Inspection / Activity Plan, Report 22, 03/01/2011 - 06/30/2012 2024-08-26
[Table view] Category:Letter
MONTHYEARIR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 05000369/LER-1923-001, Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error2023-12-13013 December 2023 Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection – U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20234012023-08-0404 August 2023 – Security Baseline Inspection Report 05000369/2023401 and 05000370/2023401 (OUO-SRI) Cover IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 – Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station – Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23124A0862023-05-0303 May 2023 Cycle 29, Revision 1, Core Operating Limits Report (COLR) ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility 2024-08-26
[Table view] |
Text
Edward Pigott Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985
SUBJECT:
MCGUIRE NUCLEAR STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION
Dear Edward Pigott:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a problem identification and resolution (PI&R) inspection at your McGuire Nuclear Station during the weeks of April 22, and May 6, 2024. The inspection team will be led by Robert Mathis, a Senior Construction Inspector, from the NRCs Region II office.
This inspection will be conducted in accordance with the baseline inspection procedure 71152, Problem Identification and Resolution, issued October 31, 2023.
The biennial PI&R inspection and assessment of the licensees corrective action program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.
On January 16, 2024, Robert Mathis confirmed, with Jeff Sanders of your staff, the two-week onsite inspection.
The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than March 22, 2024. Contact Robert Mathis with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Robert Mathis will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection, method of tracking inspector requests during the inspection, access to licensee computers, working space, arrangements for site access, and other applicable information. January 24, 2024 E. Pigott 2 In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Robert Mathis at (404) 997-4617.
Sincerely, Eric J. Stamm, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 05000369 and 05000370 License Nos. NPF-9 and NPF-17
Enclosure:
Information Request for McGuire Nuclear Station Problem Identification and Resolution Inspection cc: Distribution via Listserv PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
Signed by Stamm, Eric on 01/24/24
ML24019A200 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available
OFFICE RII:DRP RII:DCO RII:DRP NAME S. Temple R. Mathis E. Stamm DATE 1/19/2024 1/19/2024 1/24/2024 INFORMATION REQUEST FOR THE MCGUIRE NUCLEAR STATION PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (April 22 - 26 and May 6 - 11, 2024)
Note: Unless otherwise noted, the information requested below corresponds to documents generated since June 1, 2022. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
- 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program (CAP). This should include procedures related to:
a) corrective action program/process b) cause evaluations c) operating experience program d) employee concerns program e) self-assessment program f) maintenance rule program and implementing procedures g) operability determination process h) degraded/non-conforming condition process (e.g., RIS 2005-20) i) system health process or equivalent equipment reliability improvement programs j) preventive maintenance deferral process k) work management program/process (i.e., worker orders (WOs) and work requests (WRs))
If any of the procedures requested above were revised after June 2022, please provide (or have available) copies of all subsequent revisions during the onsite inspection
- 2. List of top ten risk significant systems, top ten risk significant components for each one of the top ten risk significant systems, and top ten risk significant operator manual actions.
Please provide by February 23, 2024.
- 3. List of all nuclear condition reports (NCRs) initiated including the following information for each NCR:
a) NCR number b) brief, but complete problem description c) priority or level d) affected system e) affected component f) responsible plant department g) NCR completion status
Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system and organization CR # Description Priority System Component Org Status CR001 A RHR Pump failed 2 RHR 2-RHR-PMP-ENG Open flow criteria per SR A 5.0.5.4
1
- 4. List of outstanding corrective actions including the following information for each action:
a) corrective action number b) corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc.)
c) brief, but complete corrective action description d) associated CR/action request (AR) number e) corrective action initiation date f) number of extensions g) corrective action due date h) completion status
Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system and organization.
Corrective Type Description AR Initiation Extensions Due Status Action # Date Date CR0034 CAPR Revise AR0058 01/05/22 2 06/15/23 Awaiting Procedure NGK-review 003-4585
- 5. List of control room deficiencies with a brief description and corresponding CR/AR and/or WO/WR number
- 6. List of operator workarounds and operator burdens with a brief description and corresponding CR/AR number and/or WO/WR number
- 7. List of all currently extended or overdue NCRs, sorted by initiation date, with the following information:
a) NCR number b) priority or significance c) NCR title and short description
- 8. List of all NCRs that have been voided, cancelled, or deleted. Please provide the following information for each NCR:
a) NCR number b) brief, but complete problem description c) reason voided, cancelled, or deleted
- 9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the maintenance rule since June 2022. Please include the following information for each system in (a)(1):
a) date of classification in (a)(1) b) reason for being placed in (a)(1) c) planned actions and their status
- 10. List of Maintenance Preventable Functional Failures of risk significant systems with actions completed and current status.
2
- 11. List of corrective maintenance WOs and WRs and any WOs and WRs considered high risk. Please include the following information for each:
a) WO/WR number b) brief, but complete work description c) affected system and components d) date of initiation e) date of completion (if completed) f) associated CR (if applicable)
Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system.
Work Description System Component Initiation Due Status Order # Date Date WO01345 Replace breaker SI 2A-SI-PMP, 01/05/11 03/15/22 Closed 2A-BKR-08-BB4 BKR-08-BB4 for 2A SI Pump
- 12. Corrective action closeout packages, including NCRs with description of corrective actions, for all NRC findings and licensee-identified violations (LIVs). Please include a cross reference relating NRC finding and LIVs to appropriate NCR numbers.
- 13. Corrective action closeout packages, including NCRs with description of corrective actions, for all licensee event reports (LERs) submitted. Please include a cross reference relating LER number to appropriate CR number.
- 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OpE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., AR/NCR/WO/WR number) for the documents that evaluated the aforementioned OpE information.
- 15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the CAP
- 16. Copies of all department self-assessments
- 17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends
- 18. Copy of the latest CAP statistics (if exists) such as the number of NCRs initiated by department, human performance errors by department, and others as may be available
- 19. List of routine meetings involving the CAP (including but not limited to CAP screening, maintenance rule, operating experience, etc.,) to be held during the onsite inspection weeks
3
- 20. List of NCRs related to equipment aging issues in the top ten risk significant systems since June 2019 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.; environmental qualification).
Please provide the following information for each NCR, in a format compatible with spreadsheet software and ensure the list is sortable and searchable:
a) CR number b) priority c) CR problem description
- 21. If performed, provide all self-assessments of the site safety culture completed
- 22. Copies of CAP documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
- 23. List of all cause evaluations with a brief description
- 24. Copy of probabilistic risk assessment importance measures report, if available
- 25. System health reports, system design basis documents, maintenance rule functions and status, and system description information for the top ten risk significant systems. Please provide by February 23, 2024.
4