Duke Energy Presubmittal Meeting on Adoption of Westinghouse Analysis PAD5/FSLOCA/AXIOM (EPID L-2024-LRM-0121) on October 28, 2024
ML24302A070
Person / Time
Site: Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 10/28/2024
From:
Duke Energy Carolinas
To: Natreon Jordan
NRC/NRR/DORL/LPL2-1
Stone Z
References
Download: ML24302A070 (1)


Text

Duke Energy Pre-Submittal Meeting October 28, 2024

Pre-Submittal Meeting License Amendment Request to Address the Adoption of the Westinghouse Performance Analysis and Design Model (PAD5TM) Code, the FULL SPECTRUMTM Loss-of-Coolant Accident Methodology, and AXIOMTM Fuel Rod Cladding (with Associated Exemption Request)

Catawba Nuclear Station (CNS)

McGuire Nuclear Station (MNS) 2

Duke Energy Attendees Ryan Treadway (Director, Nuclear Fleet Licensing)

Dennis Earp (Lead Nuclear Engineer, Licensing)

Roger Thomas (Manager, Fuel Mechanical Performance)

Charles Stroupe (Manager, Safety Analysis Applications)

Jeff Abbott (Manager, Safety Analysis Models)

Geoff Pihl (Manager, Nuclear Fuels Engineering - PUMA)

Mark Handrick (Principal Nuclear Engineer - Safety Analysis Applications)

Stan Hayes (Principal Nuclear Engineer - Fuel Mechanical Performance) 3 3

Agenda Background - Design and Operation Proposed Technical Specification (TS) Changes Reason for the Proposed Changes AXIOMTM FULL SPECTRUMTM Loss-of-Coolant Accident Analyses Fuel Performance and Design Model (PAD5)

Regulatory Requirements and Guidance Precedent Schedule 4

Background - Design and Operation 5

5 Catawba Nuclear Station (CNS) and McGuire Nuclear Station (MNS) are both two-unit sites, each a pressurized water reactor Nuclear Steam Supply System (NSSS) with four coolant loops furnished by Westinghouse Electric Corporation.

Rated Thermal Power (RTP) 3469 MWt - CNS Unit 1, MNS Units 1 & 2 3411 MWt - CNS Unit 2 Steam Generator Design Babcock and Wilcox International (BWI) vertical U-tube replacement steam generator (RSG) units containing alloy 690 tubes - CNS Unit 1 and MNS Units 1 & 2 Westinghouse vertical U-tube steam generator units containing alloy 600 tubes - CNS Unit 2

Proposed Technical Specification (TS) Changes Duke Energy is planning on utilizing AXIOM cladding on fuel for MNS and CNS and is proposing the following changes for MNS and CNS TS:

Revise Reactor Core Safety Limit 2.1.1.2 to implement Westinghouse Performance Analysis and Design Model (PAD5) methodology for peak fuel centerline temperature.

Revise TS 4.2.1, Fuel Assemblies, to add AXIOMTM as a fuel assembly cladding material and delete reference to Zircalloy.

Revise TS 5.6.5, Core Operating Limits Report (COLR), to include the FULL SPECTRUMTM Loss-of-Coolant Accident (FSLOCATM) Evaluation Model (EM) and the Topical Report for AXIOMTM and clean up the current list of approved analytical methods used to determine the core operating limits.

6

Proposed Technical Specification (TS) Changes 7

7 CNS & MNS

Proposed Technical Specification (TS) Changes 8

8 MNS

Proposed Technical Specification (TS) Changes 9

9 CNS

Proposed Technical Specification (TS) Changes 10 10 Changes to CNS/MNS Technical Specifications Section 5.6.5.b (i.e., analytical methods used to determine the core operating limits)

Delete the following two methods:

2. WCAP-10266-P-A, The 1981 Version of the Westinghouse Evaluation Model using the BASH Code (W Proprietary)
3. BAW-10168-P-A, B&W Loss-of-Coolant Accident Evaluation Model for Recirculating Steam Generator Plants (B&W Proprietary)

Add the following methods to support the analyses of AXIOM fuel with FSLOCA:

xx. WCAP-16996-P-A, Realistic LOCA Evaluation Methodology Applied to the Full Spectrum of Break Sizes (FULL SPECTRUM LOCA Methodology) (W Proprietary) xy. WCAP-18546-P-A, Westinghouse AXIOM Cladding for Use in Pressurized Water Reactor Fuel (W Proprietary)

NOTE: CNS TS will reflect only applicable to Unit 1

Proposed Technical Specification (TS) Changes 11 11 Changes to CNS/MNS Technical Specifications Section 5.6.5.b (i.e., analytical methods used to determine the core operating limits)

Annotate the following methods that can be removed from the COLR methods list after all the Optimized ZIRLOTM fuel is discharged, and all AXIOMTM fuel is covered by FSLOCATM:

13. WCAP-10054-P-A, Westinghouse Small Break ECCS Evaluation Model using the NOTRUMP Code (W Proprietary) [Shall not be used to determine core operating limits after XYZ]
15. WCAP-12945-P-A, Volume 1 and Volumes 2-5, Code Qualification Document for Best-Estimate Loss of Coolant Analysis (W Proprietary) [Shall not be used to determine core operating limits after XYZ]

Reason for the Proposed Changes 12 12 AXIOMTM provides additional hydrogen pickup margin relative to Optimized ZIRLOTM, which aids corrosion analysis margin management for the transition to 24-month fuel cycle and/or power uprate core designs Duke Energy plans to implement AXIOMTM cladding on a schedule that supports full cores of AXIOMTM clad fuel during the initial 24-month fuel cycles or power uprate cycles at MNS and CNS CNS Unit 1 (Spring 2026; first 24-month fuel cycle in Spring 2029)

MNS Unit 1 (Fall 2026; first 24-month fuel cycle in Fall 2029)

CNS Unit 2 (Spring 2027; first 24-month fuel cycle in Spring 2030)

MNS Unit 2 (Fall 2027; first 24-month fuel cycle in Fall 2030)

AXIOMTM 13 13 Compared to ZIRLOTM and Optimized ZIRLOTM, AXIOMTM cladding is designed to exhibit:

Improved corrosion resistance Lower hydrogen pickup (HPU)

Lower creep Niobium-bearing alloy with reduced tin content Alloying elements including vanadium and copper NRC review of Westinghouse TR WCAP-18546-P/NP, Westinghouse AXIOM Cladding for Use in Pressurized Water Reactor Fuel, found it acceptable for referencing in licensing applications to the extent specified and under the limitations and conditions delineated in the TR and the NRC staffs Safety Evaluation (SE) [ADAMS Accession No. ML22306A248].

AXIOMTM 14 14 Limitations and Conditions Use with NRC-approved PWR design Use with NRC-approved Westinghouse and CE fuel design with corresponding pellet and assembly dimensions Use with NRC-approved fuel materials and pellet coatings or additives (e.g., ADOPT IFBA, gadolinium)

Fuel burnup currently limited to 62 GWd/MTU peak rod average for all cladding types

  • Higher limit may be allowed once additional information specific to increased burnup is submitted and approved by the NRC Best Estimate Oxide Thickness < 100 µm Best Estimate HPU within limit

AXIOMTM 15 15 10 CFR 50.12 Exemption Request The requested exemption would permit the use of AXIOMTM fuel rod cladding material. The regulations in 10 CFR 50.46 contain acceptance criteria for the emergency core cooling system (ECCS) for reactors that have fuel rods fabricated either with zircaloy or ZIRLO fuel rod cladding material.

Therefore, an exemption is required from specific portions of 10 CFR 50.46 to support the use of AXIOMTM fuel rod cladding at CNS/MNS. This exemption request relates solely to the specific cladding material identified in these regulations (fuel rods with zircaloy or ZIRLO cladding) and will provide for the application of 10 CFR 50.46 to the use of AXIOMTM fuel rod cladding at CNS/MNS.

FULL SPECTRUMTM Loss-of-Coolant Accident Analyses 16 16 Westinghouse FULL SPECTRUMTM Loss-of-Coolant Accident (FSLOCATM) Evaluation Model (EM) analysis explicitly addresses AXIOM cladding Separate FSLOCATM EM analyses are required for MNS/CNS Unit 1 (BWI RSGs) and CNS Unit 2 (Westinghouse SG Model D5) due to different steam generator design A single composite FSLOCATM analysis will cover the 3 units with RSGs Will address AXIOMTM cladding only. Optimized ZIRLOTM cladding will continue to be covered by existing CQD and NOTRUMP LOCA analyses.

Will also address the proposed Extended Power Uprate to 3700 MWt for the 3 RSG units All plants will operate at current RTP limits until EPU implementation (2029-2031)

Will not address 24-month fuel cycles - separate analyses to be developed later for fuel exposures > 62 GWD/MTU Assumes a five-minute reactor coolant pump (RCP) trip time upon loss of subcooling in place of Duke Energys current two-minute time critical operator action time

FULL SPECTRUMTM Loss-of-Coolant Accident Analyses 17 17 FSLOCATM Analysis for RSG plants to be submitted as a supplement to the AXIOMTM LAR Peaking factor limits for AXIOMTM cladding with FSLOCATM will be contained in the Core Operating Limits Reports (COLRs)

Current peaking limits for Optimized ZIRLOTM cladding will also be retained in the COLRs for transition cycles Following discharge of all Optimized ZIRLOTM cladding fuel from the core designs, WCAP-12945-P-A (CQD) and WCAP-10054-P-A (NOTRUMP) can be removed from the TS COLR Methods Section 5.6.5.

Duke Energy has an existing commitment to NRC to re-analyze Large Break LOCA with methods that explicitly consider fuel pellet thermal conductivity degradation (TCD). FSLOCA and PAD5 methodologies explicitly consider TCD effects. [ADAMS Accession No. ML16271A329]

Fuel Performance and Design Model (PAD5) 18 18 PAD5 supports advanced fuel designs and analysis methods AXIOM cladding FSLOCA Duke Energys Rod Ejection Accident analyses NRC review of Westinghouse TR WCAP-17642-P/NP, Westinghouse Performance Analysis and Design Model (PAD5), found it acceptable for referencing in licensing applications to the extent specified and under the limitations and conditions delineated in the NRC staffs SE

[ADAMS Accession No. ML17090A443].

CNS/MNS will meet the constraints identified in limitations and conditions of the TR and NRC staff SE.

Regulatory Requirements and Guidance 19 Regulations 10 CFR 50.36, Technical specifications 10 CFR 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors 10 CFR 50 Appendix A, General Design Criteria for Nuclear Power Plants GDC 10, Reactor design GDC 35, Emergency core cooling

20 Precedent AXIOMTM Turkey Point Nuclear Generating Unit Nos. 3 and 4 (ADAMS Accession No. ML23320A028)

[Under Review by NRC]

Proposed the incorporation of AXIOMTM into the licensing basis Also proposed incorporating advanced fuel features ADOPTTM fuel pellets and a PRIME fuel skeleton, as well as extending TS surveillance intervals, modifying TS Allowable Values and a Trip Setpoint to facilitate a transition to 24-month fuel cycles, but that is beyond the scope of the Duke Energy proposed LAR.

Included exemption request from certain requirements of 10 CFR 50.46 to support application of AXIOMTM cladding

21 Precedent FSLOCATM Content for the FSLOCATM analysis will be similar to that provided by the following:

Watts Bar Nuclear Plant, Units 1 and 2 (ADAMS Accession No. ML21034A169)

Turkey Point Nuclear Generating Unit Nos. 3 and 4 (ADAMS Accession No. ML22028A066)

Basis for composite FSLOCATM analysis for MNS/CNS:

MNS - ADAMS Accession No. ML003753895 CNS - ADAMS Accession No. ML003756631

22 Precedent PAD5 Revised Reactor Core Safety Limit 2.1.1.b peak fuel centerline temperature in accordance with WCAP-17642-P-A, Revision 1, Westinghouse Performance Analysis and Design Model (PAD5)

Millstone Power Station Unit 3 (ADAMS Accession No. ML21326A099)

Turkey Point Nuclear Generating Unit Nos. 3 and 4 (ADAMS Accession No. ML19031C891)

Schedule 23 23 Submit License Amendment Request (LAR) in January 2025 Supplement LAR with FSLOCATM analyses in July/August 2025 Calculations available for regulatory audit Westinghouse Engineering Report available October 2025 Requesting approval in December 2025 to support CNS Unit 1 Spring 2026 refueling outage MNS Unit 1 refueling outage Fall 2026 MNS Unit 2 refueling outage Fall 2027 Submit LAR for CNS Unit 2 for AXIOMTM and FSLOCATM by April 2026 to support Spring 2027 refueling outage

24