ML051010323

From kanterella
Jump to navigation Jump to search

Attachment 2, Bill of Material - QA Condition 4, Drawing D-4737-2A,18-900 Sch ASME PIC-6 Primary Feedwater Flow Sectionsummary of Meeting with Duke Energy Corp on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240)
ML051010323
Person / Time
Site: McGuire, Mcguire  
Issue date: 04/01/2005
From: James Shea
NRC/NRR/DLPM/LPD2
To:
Duke Energy Corp
SHea J, 415-1388, NRR/DLPM
Shared Package
ML051010310 List:
References
TAC MC6239, TAC MC6240 D-4737-2A, Rev 2
Download: ML051010323 (1)


Text