Meeting Summary Enclosure 2 Handouts. Includes NEI Presentation Industry Comments on NRC Program Plan.
ML023240313
Person / Time
Site: Mcguire, Indian Point, Catawba, Harris, Ginna, McGuire  Constellation icon.png
Issue date: 11/22/2002
From:
Nuclear Energy Institute
To:
Office of Nuclear Reactor Regulation
Subbaratnam R, NRR/DLPM, 415-1478
References
Download: ML023240313 (4)


Text

I Industry Comments on NRC Program Plan I

Hemyc Users Group October, 2002 Topics

"*Introduction "aComments on Hemyc/MT tests

"*Comments on Rockbestos Firezone R tests NEIK Introduction

"*NRC identified issue with HemycIMT fire barrier material in July 2000

. Concern with qualification tests

"*Industry provided in letter April 2001 a summary of industry information related to

"*Testing protocols used

"*Tests conducted

"*Plant applications

"*Plant licensing basis Enclosure 2

Introduction

"*NRC decided to test this material

"*Industry appreciates the opportunity to comment on the test plan P

l5I~

I Areas for Comment - Hemyc

"*Licensing basis

" Merits of AN] testing methods and acceptance cnteria "aEvaluation of test results

"*Construction/test plan comments

'4E:I I

Areas for Comment - Hemyc Licensing basis

  • Installed Hemyc configurations accepted by NRC
  • GL 86-10 Supplement I intended for "future installations"

Areas for Comment - Hemyc a Merits of ANI testing methods and acceptance criteria

"*Replicate intent of original ANI test

"*Cable fill Fire test with cable in test configuration (e g, test air drops with cable)

"*Circuit continuity

  • Functionality is a method ofdemonstrating acceptance NtI E S7 Areas for Comment - Hemyc a Evaluation of test results Provide guidance on applying test results to configurations not tested
  • Include mathematical model to support this guidance
  1. Guidance %ill assist inspectors and licensees in addressing configurations not tested NJIK Areas for Comment - Hemyc n Construction/test plan comments

"*Allow industry comment on detailed construction/test plan

"*Allow industry observance of assembly and testing

"*Detailed comments to be submitted NE!-

Areas for Comment Rockbestos Cable wNeed to

"*State specific construction of cable

"*Assure test configurations representative of plant use State applicability of3-hour test to I-hour apphcations inplants

"*State acceptance criteria go  !