Meeting Summary Enclosure 2 Handouts. Includes NEI Presentation Industry Comments on NRC Program Plan
ML023240313
Person / Time
Site: Mcguire, Indian Point, Catawba, Harris, Ginna, McGuire  Constellation icon.png
Issue date: 11/22/2002
From:
Nuclear Energy Institute
To:
Office of Nuclear Reactor Regulation
Subbaratnam R, NRR/DLPM, 415-1478
References
Download: ML023240313 (4)


Text

Enclosure 2 Industry Comments on NRC Program Plan Hemyc Users Group October, 2002 Topics

"* Introduction "a Comments on Hemyc/MT tests

"* Comments on Rockbestos Firezone R tests NEIK Introduction

"* NRC identified issue with HemycIMT fire barrier material in July 2000

. Concern with qualification tests

"* Industry provided in letter April 2001 a summary of industry information related to

"* Testing protocols used

"* Tests conducted

"* Plant applications

"* Plant licensing basis I

I

Introduction

"* NRC decided to test this material

"* Industry appreciates the opportunity to comment on the test plan P

l5I~

I Areas for Comment - Hemyc

"* Licensing basis

" Merits of AN] testing methods and acceptance cnteria "a

Evaluation of test results

"* Construction/test plan comments

'4E:I I

Areas for Comment - Hemyc Licensing basis

  • Installed Hemyc configurations accepted by NRC
  • GL 86-10 Supplement I intended for "future installations"

Areas for Comment - Hemyc a Merits of ANI testing methods and acceptance criteria

"* Replicate intent of original ANI test

"* Cable fill Fire test with cable in test configuration (e g, test air drops with cable)

"* Circuit continuity

  • Functionality is a method ofdemonstrating acceptance NtI E S7 Areas for Comment - Hemyc a Evaluation of test results Provide guidance on applying test results to configurations not tested
  • Include mathematical model to support this guidance
  1. Guidance %ill assist inspectors and licensees in addressing configurations not tested NJIK Areas for Comment - Hemyc n Construction/test plan comments

"* Allow industry comment on detailed construction/test plan

"* Allow industry observance of assembly and testing

"* Detailed comments to be submitted NE!-

Areas for Comment Rockbestos Cable w Need to

"* State specific construction of cable

"* Assure test configurations representative of plant use State applicability of3-hour test to I-hour apphcations in plants

"* State acceptance criteria go

!