Letter Sequence Meeting |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0515100172005-05-31031 May 2005 Draft RAI on Response to Generic Letter 2004-02 Project stage: Draft RAI ML0515303042005-06-0303 June 2005 6/3/05, Calvert Cliffs - RAI Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0603803582006-02-0909 February 2006 RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0603704272006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-water Reactors (TAC MC4692 & MC4693) Project stage: RAI ML0603703472006-02-0909 February 2006 RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors. Project stage: RAI ML0608904212006-03-0101 March 2006 Final Safety Evaluation Report Related to the License Renewal of Brunswick Steam Electric, Units 1 and 2 (TAC Nos. MC4639 and MC4640) Project stage: Approval ML0609500512006-04-12012 April 2006 Approval of Extension Request for Completion of Corrective Actions in Response to Generic Letter 2004-02 Project stage: Other ML0618702222006-06-30030 June 2006 Calvert Cliffs, Units 1 & 2 Update of Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Basis Accidents at Pressurized Water Reactors Project stage: Other ML0626405472006-09-20020 September 2006 Update of Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML0633407022006-12-18018 December 2006 Unit No.1 - Approval of Extension Request for Completion of Corrective Action in Response to Generic Letter 2004-02 Project stage: Other ML0712703722007-05-0202 May 2007 Calvert Cliffs Revision to Generic Letter 2004-02 Response Project stage: Other ML0734504992007-12-10010 December 2007 Attachment (1) Request for Extension of the Completion Date for Corrective Actions Related to Generic Letter 2004-02 Project stage: Request ML0734504982007-12-10010 December 2007 Request for Extension for Completion of Activities Related to Generic Letter 2004-02 Project stage: Request ML0807301312008-02-28028 February 2008 Response to Request for Additional Information on GL-04-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0806505592008-02-29029 February 2008 Response to Request for Additional Information on GL-04-002 Project stage: Request ML0811307392008-04-22022 April 2008 Revision to Generic Letter 2004-02 Response Project stage: Other ML0812700912008-04-30030 April 2008 Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0812804882008-04-30030 April 2008 Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Request ML0817101052008-06-18018 June 2008 Attachment 1, Request for Extension of the Completion Date for Corrective Actions Related to Generic Letter 2004-02 Project stage: Request ML0827404892008-09-30030 September 2008 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. Project stage: Supplement ML0827404972008-09-30030 September 2008 Calvert Cliffs Nuclear Plant, Attachment 2, ECCS and CS System Figures Project stage: Other ML0830803502008-11-18018 November 2008 Request for Additional Information (RAI) Regarding Supplemental Responses to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Project stage: RAI ML0830803732008-11-21021 November 2008 RAI, Supplemental Responses to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: RAI ML0833003202008-12-0404 December 2008 Request for Additional Information Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors-Calvert Cliffs Unit 1 & 2 Project stage: RAI ML0906807672009-03-0404 March 2009 Request for Additional Information: Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Supplement ML0921605972009-07-28028 July 2009 Update on Status of 11/18/08 Request for Additional Information & Additional Testing Pursuant to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Request ML0921101202009-07-28028 July 2009 Catawba Nuclear Station Units 1 & 2 -Update on the Status of the November 21, 2008 Request for Additional Information (RAI) and Additional Testing Pursuant to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Reci Project stage: Request ML0922908922009-08-18018 August 2009 Notice of Conference Call with Duke Energy Carolinas, LLC (Duke), Regarding Catawba Nuclear Station, Units 1 and 2 (Catawba 1 and 2) and McGuire Nuclear Station Units 1 and 2 Project stage: Other ML0927304602009-10-0707 October 2009 09/01/2009 Summary of Conference Call with Duke Regarding Responses to Generic Letter (GL) 2004-02. Meeting Handouts Project stage: Request ML0926700202009-10-0707 October 2009 Summary of Conference Call with Duke Regarding Responses to Generic Letter (GL) 2004-02 Project stage: Other ML1009500782010-04-12012 April 2010 Request for Additional Information Generic Letter 2004-02 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2-(TAC Nos. MC4672 and MC4673) Project stage: RAI ML1011903842010-05-0606 May 2010 Notice of Forthcoming Conference Call with Calvert Cliffs to Discuss Supplemental Responses to Generic Ltr. 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Request ML1012604632010-05-0707 May 2010 Notice of Forthcoming Conference Call with Duke Energy Carolinas, LLC (Duke) to Discuss Duke'S Responses to Generic Letter 2004-02 at Catawba 1 and 2 and McGuire 1 and 2 Project stage: Other ML1014708982010-06-0707 June 2010 Summary of Meeting with Calvert Cliffs Nuclear Power Plant, LLC, to Discuss Supplement to Responses to Generic Letter 2004-02 Project stage: Meeting ML1028701002010-09-30030 September 2010 Catawba Units 1 & 2, Draft Responses to NRC Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents on Pressurized-Water.... Project stage: Request ML1029306502010-10-20020 October 2010 Notice of Forthcoming Conference Call with Duke Energy Carolinas, LLC Regarding McGuire Nuclear Station, Units 1 and 2 and Catawba Nuclear Station, Units 1 and 2, Project stage: Other ML1031903612010-11-10010 November 2010 Response to Request for Additional Information Regarding Generic Letter 2004-02 (TAC Nos. MC4672 and MC4673) Project stage: Response to RAI ML1030810242010-11-10010 November 2010 Summary of November 1, 2010, Meeting with Duke to Discuss Responses to Generic Letter (GL) 2004-02 (Tac Nos. MC4673, MC4674, MC4692, and MC4693) Project stage: Meeting ML13038A5432013-01-24024 January 2013 Chemical Effects Head Loss Experiment (Chle) Test Protocol for Calvert Cliffs Nuclear Power Plant (CCNPP-CHLE-002, Revision 0d) Project stage: Request ML13086A5512013-01-24024 January 2013 MC4672 & MC4673 - CCNPP-CHLE-003, Rev 0c Chemical Effects Pirt Considerations Excerpts with Respect to GL2004-02, GSI-191 Project stage: Other ML13045A1822013-02-19019 February 2013 March 20, 2013, Notice of Forthcoming Teleconference with Calvert Cliffs and Nrc/Nrr Staff to Have Additional Discussions of Licensees'S Proposed Path for Resolution of Generic Letter 2004-02 Project stage: Meeting ML13050A5112013-02-19019 February 2013 MC4672-3 Corrected Notice -Public Meeting on March 20, 2013 Re-GL2004-02 Project stage: Request ML13086A5502013-03-0101 March 2013 MC4672 & MC4673, CCNPP-CHLE-002, Rev 0e Chemical Effects Experimental Protocol with Respect to GL2004-02, GSI-191. Project stage: Request ML13088A2202013-03-18018 March 2013 MC4672 & MC4673 - CCNPP-CHLE-005, Rev 1 Chemical Effects Autoclave Experimental Plan with Respect to GL2004-02, GSI-1 91 Project stage: Request ML13086A5492013-03-20020 March 2013 MC4672 & MC4673 - Licensee Presentation-Category 1, Public Meeting on March 20, 2013 with Respect to GL2004-02, GSI-191 Project stage: Meeting ML13091A0552013-04-10010 April 2013 Summary of Meeting on March 20, 2013, with Calvert Cliffs Nuclear Power Plant, LLC, to Discuss the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation D Project stage: Meeting ML13141A4032013-05-0808 May 2013 Closure Options for Generic Safety Issue (GSI)-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance in Resolution of Final Issues Related to Generic Letter Project stage: Other ML13149A3942013-05-20020 May 2013 Chemical Effects Head Loss Experiment (Chle) Test Protocol for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-002, Revision 0 May 20, 2013 Project stage: Request ML13149A3992013-05-20020 May 2013 Chemical Effects Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant CCNPP-CHLE-005, Revision 2, May 20, 2013 Project stage: Request ML13149A4052013-05-23023 May 2013 Metals BENCH-TOP Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-006, Revision 0, May 23, 2013 Project stage: Request 2009-10-07
[Table View] |
Summary of November 1, 2010, Meeting with Duke to Discuss Responses to Generic Letter (GL) 2004-02 (Tac Nos. MC4673, MC4674, MC4692, and MC4693)ML103081024 |
Person / Time |
---|
Site: |
Catawba, McGuire, Mcguire |
---|
Issue date: |
11/10/2010 |
---|
From: |
Jacqueline Thompson Plant Licensing Branch II |
---|
To: |
Duke Energy Carolinas |
---|
Thompson Jon, NRR/DORL/LPL 2-1, 415-1119 |
Shared Package |
---|
ML103140192 |
List: |
---|
References |
---|
TAC MC4673, TAC MC4674, TAC MC4692, TAC MC4693, GL-04-002 |
Download: ML103081024 (2) |
|
|
---|
Category:Meeting Summary
MONTHYEARML24242A3242024-08-30030 August 2024 Duke Energy Carolinas - Catawba 2A EDG Regulatory Conference Meeting Summary - August 7, 2024 ML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML23118A2852023-05-0202 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Catawba Nuclear Station, McGuire Nuclear and Oconee Nuclear Station ML22335A4012022-12-15015 December 2022 Summary of December 8, 2022, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Proposed License Amendment Request to Revise TS 3.7.11 Control Room Area Chilled Water System (Cracws) ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22094A1112022-04-0404 April 2022 Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21342A0902021-12-14014 December 2021 Summary of December 7, 2021, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Reactor Vessel Closure Head Nozzle Repair for Catawba Nuclear Station, Unit 2 ML21236A2832021-09-22022 September 2021 Summary of August 30, 2021, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Moderator Temperature Coefficient Methodology Revision ML21133A0042021-05-26026 May 2021 Summary of Conference Call Regarding the Spring 2021 Steam Generator Tube Inspections (Epid: L-2021-Nfo-0004) ML21116A0662021-04-22022 April 2021 C2R24 Relief Request Pre-Submittal Slides Call 2 ML21099A0932021-04-0909 April 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Catawba, McGuire, and Oconee Nuclear Stations ML20141L4172020-05-20020 May 2020 EOC Public Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML19088A1362019-03-29029 March 2019 Public Meeting Summary ML18250A0952018-09-20020 September 2018 Summary of August 29, 2018, Licensing Meeting with Duke Energy to Discuss a Planned License Amendment Request to Revise TS 4.2.2, Control Rod Assemblies to Permit Operation with One Less than the Required Number ML18183A4502018-07-16016 July 2018 Summary of June 11, 2018, Licensing Meeting with Duke Energy to Discuss a Planned License Amendment Request to Remove Containment Valve Injection Water from Specified Containment Isolation Valves ML17293A0232018-05-0404 May 2018 Summary of 9/20/17, Meeting with Duke Energy to Discuss LAR to Extend Completion Time for an Inoperable Emergency Diesel Generator and Electrical Alignments for Shared Systems for Catawba and McGuire (CAC Nos. MF9667-74; Epids L-2017-LLA-02 ML18117A2212018-04-27027 April 2018 Summary of Public Meeting with Catawba Nuclear Station Concerning Annual Assessment of Units 1 and 2 for Period of January 01, 2017 - December 21, 2017 ML18089A0532018-03-30030 March 2018 Summary of Public Meeting with McGuire Nuclear Station ML17110A1862017-04-20020 April 2017 Summary of Public Meeting - McGuire, Units 1 and 2 to Discuss Concerning Annual Assessment ML17107A0642017-04-17017 April 2017 Summary of Public Meeting with Catawba, Units 1 and 2 ML17089A2042017-04-0707 April 2017 Summary of January 25, 2017, Pre-Licensing Meeting with Duke Energy to Discuss Proposed License Amendment Request to Create a New Condition for Nuclear Service Water System TS 3.7.8 - Catawba Nuclear Station, Unit Nos. 1 and 2 (CAC MF8944-5 ML16264A1232016-10-12012 October 2016 September 14, 2016, Summary of Category 2 Public Meeting with Duke Energy Carolinas to Discuss Seismic Probabilistic Risk Assessments Associated with Implementation of Japan Lessons-Learned Near-Term Task Force R2.1, Seismic, for Catawba Nu ML16264A1022016-10-0505 October 2016 Summary of Pre-Licensing Meeting with Duke Energy to Discuss Proposed License Amendment Request to Extend Completion Time for an Inoperable Diesel Generator for Catawba Nuclear Station & McGuire Nuclear Stations (Cac. Nos. MF8102-MF8105) ML16116A3712016-05-17017 May 2016 Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss Proposed Changes to the Technical Specification Bases for the Catawba Nuclear Station, Units 1 and 2 ML16082A0682016-03-21021 March 2016 Summary of Meeting with the Public Concerning the Annual Assessment of McGuire Nuclear Station, Units 1 and 2 ML16081A3352016-03-17017 March 2016 Summary of Meeting with Public Concerning Annual Assessment of Catawba Nuclear Station, Units 1 and 2 ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML15138A3392015-06-0101 June 2015 Summary of Public Teleconference Regarding Potential Submission of a License Amendment Request for a One-Time Extension of Completion Time for Nuclear Service Water System ML15117A5812015-05-0606 May 2015 April 14, 2015, Summary of Public Meeting on Calculation of Risk for NFPA-805 Fire Areas Crediting Control Room Abandonment ML15106A0302015-04-15015 April 2015 Meeting Summary with Public to Discuss the Annual Assessment of Catawba Nuclear Station, Units 1 and 2 ML15106A0222015-04-15015 April 2015 Summary of Meeting with Public to Discuss Annual Assessment of McGuire Nuclear Station, Units 1 and 2, in Huntersville, North Carolina ML14126A6792014-05-0606 May 2014 Summary of Public Meeting with Catawba, Units 1 & 2 to Discuss Annual Assessment ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13235A2462013-09-0404 September 2013 August 7, 2013, Summary of Pre-Application Teleconference with Duke Energy Carolinas, LLC, to Discuss Proposed License Amendment Request (TAC Nos. MF2435 and MF2436) ML13235A1312013-09-0404 September 2013 Summary of July 30, 2013, Pre-Application Teleconference with Duke Energy Carolinas, LLC to Discuss Proposed Risk-Informed In-Service Inspection, 4th Interval Relief Request (TAC Nos. MF2458 and MF2459) ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13127A0502013-05-20020 May 2013 Summary of April 18, 2013, Meeting with Duke Energy Concerning the National Fire Protection Association (NFPA) 805: Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML13129A4302013-05-0808 May 2013 Summary of Public Meeting with McGuire to Discuss Annual Assessment for Year 2012 ML13127A1742013-05-0303 May 2013 4/29/2013 - Summary of Catawba 2012 EOC Meeting ML12261A2232012-09-17017 September 2012 September 11, 2012 - Summary of Category 1 Public Meeting Held in Atlanta, Ga ML12128A0432012-05-0303 May 2012 4/25/2012 - Public Meeting Summary - McGuire Station to Discuss the Nrc'S Reactor Oversight Process (ROP) and the Nrc'S Annual Assessment of Plant Safety Performance for 2011 ML12117A2512012-04-26026 April 2012 Meeting Summary with Catawba Nuclear Station to Discuss the Nrc'S Reactor Oversight Process (ROP) and the Nrc'S Annual Assessment of Plant Safety Performance for the Period of January 1, 2011, to December 31, 2011 ML11125A0122011-05-0404 May 2011 Summary of Public Meeting with Duke Energy Carolinas, LLC, McGuire, to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for the Period of 01/01/10 - 12/31/10 ML1112308322011-05-0303 May 2011 End of Cycle Public Meeting Summary ML11097A0272011-04-14014 April 2011 Summary of Meeting with Duke Energy Carolinas, LLC, on Upcoming Submittal of License Amendments Regarding Implementation of National Fire Protection Association Standard 805, (TACs ME5767 & ME5768, Catawba 1 & 2 ME5769 & ME5770 Mcguire 1 & 2024-08-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 10, 2010 LICENSEE: DUKE ENERGY CAROLINAS, LLC (DUKE)
FACILITY: CATAWBA NUCLEAR STATION, UNITS 1 AND 2, AND MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 SUB..IECT:
SUMMARY
OF NOVEMBER 1, 2010, MEETING WITH DUKE TO DISCUSS RESPONSES TO GENERIC LEDER (GL) 2004-02 FOR THE MCGUIRE NUCLEAR STATION (MCGUIRE) AND THE CATAWBA NUCLEAR STATION (CATAWBA) (TAC NOS. MC4673, MC4674, MC4692, AND MC4693)
On November 1, 2010, a Category 1 public meeting via conference call was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Duke at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss Duke's responses to GL 2004-02. A list of attendees is enclosed.
The licensee discussed the status of upcoming tests to address issues raised by the requests for additional information (RAls) sent by the NRC staff's letters dated November 18, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML083080350), for McGuire and November 21, 2008 (ADAMS Accession No. ML083080373),
for Catawba. The next set of tests is scheduled to begin later in November 2010 and had been delayed to make additional modifications to the test equipment in order to ensure representative testing conditions. The licensee and the NRC also briefly discussed draft RAI responses sent by letter dated September 30, 2010 (ADAMS Accession No. ML102870100), with a particular focus on those responses that may be impacted by the upcoming testing. The NRC staff indicated that major issues, and the associated RAI responses, appear as if they will be addressed with the upcoming testing, which should be confirmatory.
Members of the public were not in attendance. Public Meeting Feedback forms were not received. Please direct any inquiries to me at 301-415-1119, or jon.thompson@nrc.gov.
Cf~nIA. ~--,~
Jon H. Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-413, 50-414, 50-369, and 50-370
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATrENDEES NOVEMBER 1, 2010, NUCLEAR REGULATORY COMMISSION (NRC) MEETING WITH DUKE ENERGY CAROLINAS, LLC (DUKE), ON DISCUSSION OF LICENSEE'S RESPONSES TO GENERIC LEITER 2004-01 NRC DUKE S. Bailey K. Ashe*
J. Thompson R. Hart*
S. Smith J. Nolin*
J. Lehning S. Manning*
P. Klein* P. Roberson*
R. Lytton*
A. Tuckman*
G. Robison*
M. Branham*
E. Crabtree*
- Participated by phone Enclosure
ML083080373),
for Catawba. The next set of tests is scheduled to begin later in November 2010 and had been delayed to make additional modifications to the test equipment in order to ensure representative testing conditions. The licensee and the NRC also briefly discussed draft RAI responses sent by letter dated September 30,2010 (ADAMS Accession No. ML102870100), with a particular focus on those responses that may be impacted by the upcoming testing. The NRC staff indicated that major issues, and the associated RAI responses, appear as if they will be addressed with the upcoming testing, which should be confirmatory.
Members of the public were not in attendance. Public Meeting Feedback forms were not received. Please direct any inquiries to me at 301-415-1119, or jon.thompson@nrc.gov.
IRA!
Jon H. Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-413, 50-414, 50-369, and 50-370
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrLAMO'Brien Resource RidsNrrDssSsib Resource LPL2-1 RlF RidsOgcRp Resource RidsNrrDciCsgb Resource RidsAcrsAcnw_MailCTR Resource RidsOpaMail Resource PKlein, NRR RidsNrrOdResource RidsRgn2MailCenter Resource SSmith, NRR RidsNrrDorl Resource TWertz, NRR JLehning, NRR RidsNrrDorlLpl2-1 Resource CSteger, NRR SBailey, NRR RidsNrrPMCatawba Resource JLedford, OPA Region II NSanfilippo, EDO Region II RidsNrrPMMcGuire Resource RHannah, OPA Region \I ADAMS Accession No. PKG ML103140192 Meeting Notice ML10293065 o Meetmg
. Summary ML103081024 OFFICE DORULPL2-1/PM DORULPL2-1/LA DORULPL2-1/BC DORULPL2-1/PM NAME JThompson MO'Brien GKulesa JThompson DATE 11/8/10 11/10/10 11/10/10 11/10/10