IR 05000369/2024402

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000369/2024402 05000370/2024402
ML24281A114
Person / Time
Site: McGuire, Mcguire  
Issue date: 10/08/2024
From: Jannette Worosilo
Division Reactor Projects II
To: Pigott E
Duke Energy Carolinas
References
IR 2024402
Download: ML24281A114 (1)


Text

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1&2 SECURITY BASELINE INSPECTION REPORT 05000369/2024402 AND 05000370/2024402

Dear Edward Pigott:

On September 26, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at McGuire Nuclear Station, Units 1&2 and discussed the results of this inspection with Brent Bare and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000369 and 05000370 License Nos. NPF-9 and NPF-17

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000369 and 05000370

License Numbers:

NPF-9 and NPF-17

Report Numbers:

05000369/2024402 and 05000370/2024402

Enterprise Identifier:

I-2024-402-0029

Licensee:

Duke Energy Carolinas, LLC

Facility:

McGuire Nuclear Station, Units 1&2

Location:

Huntersville, NC

Inspection Dates:

September 23, 2024 to September 26, 2024

Inspectors:

D. Egelstad, Physical Security Inspector

J. Justice, Senior Physical Security Inspector

J. Tornow, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at McGuire Nuclear Station, Units 1&2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP dated January 1, 2024

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: All requirements Tier II: 02.09(a, b), 02.11(b), 02.12(a) Tier III: 02.15(a), 02.15(c)

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1) Tier I: All requirements Tier II: 02.05(b,c), 02.06(a,b), 02.07(a), 02.08(a)

Tier III: 02.10, 02.12(a,b), 02.13(a-b)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 26, 2024, the inspectors presented the security baseline inspection results to Brent Bare and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AD-SY -ALL-0610

Nuclear Security Equipment Maintenance Program

AD-SY-ALL-0580

Weapons Maintenance, Testing, and Accountability

Rev. 8

AD-SY-ALL-0600

Testing and Inspection of Security Equipment and Barriers

Rev. 0

71130.04

Procedures

AD-SY-ALL-0610

Nuclear Security Equipment Maintenance Program

Rev. 1

Corrective Action

Documents

2529782

2516270

2481797

2486994

Various Security Training Lesson Plans

Miscellaneous

Various Security Officer Training Records

McGuire Nuclear Station Training and Qualification Plan

Rev. 30

AD-SY-ALL-0510

Systematic Approach to Training

Rev. 5

AD-SY-ALL-0520

Security Training

Rev. 7

AD-SY-ALL-0524

Security On-The-Job Training (OJT) and Task Performance

Evaluation (TPE)

Rev. 2

AD-SY-ALL-0540

Security Range Safety and Control

Rev. 11

AD-SY-ALL-0560

Security Drill and Exercise Program

Rev. 11

PY-SY-ALL-0005

Fleet Nuclear Security Use of Force Policy

Rev. 2

71130.07

Procedures

TG-SY-MNS-

0530

Field Training Guide and Task Performance Evaluation

Guide

Rev. 11