MONTHYEARML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24029A1142024-01-29029 January 2024 Notification of Inspection and Request for Information ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 IR 05000369/20220052022-08-29029 August 2022 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 ML22094A0952022-04-0606 April 2022 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20210062022-03-0202 March 2022 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 (Report 05000369/2021006 and 05000370/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML22010A0732022-01-0606 January 2022 50.59 Inspection Information Request ML21267A2782021-09-23023 September 2021 50.59 Inspection Information Request IR 05000369/20210052021-08-23023 August 2021 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000369/2021005 and 05000370/2021005) IR 05000369/20200062021-03-0303 March 2021 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2020006 and 05000370/2020006 ML21020A0682021-01-20020 January 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000369/2021011 and 05000370/2021011) and Request for Information (RFI) ML20280A6722020-10-0606 October 2020 Notfication of McGuire Nuclear Station Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000369/2021010 and 05000370/2021010 IR 05000369/20200052020-08-17017 August 2020 Updated Inspection Plan for Mcguire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2020005 and 05000370/2020005) IR 05000369/20190062020-03-0303 March 2020 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 - NRC Inspection Report 05000369/2019006 and 05000370/2019006 IR 05000369/20190052019-08-26026 August 2019 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000369/2019005 and 05000370/2019005) IR 05000369/20180062019-03-0404 March 2019 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2018006 and 05000370/2018006 ML18333A0912018-11-29029 November 2018 Op Ess 201801 RFI - SD IR 05000369/20180052018-08-20020 August 2018 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 -NRC Inspection Report 05000369/2018005 and 05000370/2018005 ML18074A0162018-03-15015 March 2018 Emailed Hs 2018002 Hs ML18059A0932018-02-28028 February 2018 EOC Assessment Letter IR 05000369/20170052017-08-16016 August 2017 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2017005 and 05000370/2017005 ML17114A4992017-04-17017 April 2017 Emergency Preparedness Inspection and Request for Information IR 05000369/20160062017-03-0101 March 2017 Annual Assessment Letter for McGuire Nuclear Station, Units 1 & 2 -NRC Inspection Report 05000369/2016006 and 05000370/2016006 ML17024A2812017-01-23023 January 2017 William B. McGuire Nuclear Plant - Notification of Inspection and Request for Information IR 05000369/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2016005 and 05000370/2016005) ML16082A1362016-03-21021 March 2016 Requalification Program Inspection - McGuire Nuclear Station ML16062A2152016-03-0202 March 2016 Annual Assessment Letter ML16061A0252016-02-29029 February 2016 PIR Notification Letter 2016 ML16032A0922016-01-29029 January 2016 William B. McGuire Nuclear Station, Unit 1, Notification of Inspection and Request for Information ML16026A5912016-01-26026 January 2016 William B. McGuire - Notification of Inspection and Request for Information ML15251A2242015-09-0202 September 2015 Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U. S. Nuclear Regulatory Commission Inspection Report 05000369/2015008 and 05000370/2015008 IR 05000369/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2015005 and 05000370/2015005) IR 05000369/20140012015-03-0404 March 2015 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2014001 and 05000370/2014001) ML14351A0182014-12-12012 December 2014 IR 05000369/2015007 and 05000370/2015007, Notification of McGuire, Units 1 and 2, Component Design Bases Inspection ML14245A1322014-09-0202 September 2014 Mid-Cycle 2014 Letter ML14063A1572014-03-0404 March 2014 2013 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 ML13246A1622013-09-0303 September 2013 Mid Cycle Assessment Letter IR 05000369/20120012013-03-0404 March 2013 Annual Assessment Letter for McGuire, Units 1 & 2, (IR 05000369-12-001 and 05000370-12-001) ML12248A0592012-09-0404 September 2012 Mid Cycle Assessment Letter McGuire 2012 ML12066A0272012-03-0505 March 2012 Report 22, Inspection Activity Plan ML11364A0192011-12-12012 December 2011 Fourth Inservice Inspection Interval Plan ML1124403202011-09-0101 September 2011 Report 22, Inspection/Activity Plan, 09/01/2011- 12/31/2012 ML1106301172011-03-0404 March 2011 Inspection / Activity Plan, Report 22, 03/01/2011 - 06/30/2012 ML1024407572010-09-0101 September 2010 Report 22, Inspection/Activity Plan 2024-08-26
[Table view] Category:Letter
MONTHYEARML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20240102024-03-13013 March 2024 Comprehensive Engineering Team Inspection Report 05000369/2024010 and 05000370/2024010 IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl 2024-08-26
[Table view] |
See also: IR 05000369/2025010
Text
Edward Pigott
Site Vice President
Duke Energy Carolinas, LLC
McGuire Nuclear Station
12700 Hagers Ferry Road
Huntersville, NC 28078-8985
SUBJECT: MCGUIRE NUCLEAR STATION UNITS 1 & 2 - NOTIFICATION OF AN NRC
FIRE PROTECTION TEAM INSPECTION (FPTI) (NRC INSPECTION REPORT
05000369/2025010, 05000370/2025010) AND REQUEST FOR INFORMATION
(RFI)
Dear Edward Pigott:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Region II staff will conduct a fire protection team inspection at the McGuire Nuclear Station
Units 1 & 2 in January of 2025. The inspection team will be led by Mr. Jonathan Montgomery, a
Senior Reactor Inspector from the NRC Region II Office. The inspection team will be comprised
of three inspectors from the NRC Region II office. The inspection will be conducted in
accordance with Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team
Inspection, the NRCs baseline fire protection inspection procedure.
On October 16, 2024, in an e-mail exchange between Jeff Thomas of your staff and Jonathan.
Montgomery, our respective staffs confirmed arrangements for a two-week onsite inspection.
The schedule for the inspection is as follows:
- Week 1 of onsite inspection: January 13-17, 2025
- Week 2 of onsite inspection: January 27-31, 2025
The team lead and senior reactor analyst will work with your staff prior to the start of the
inspection to select the scope of structures, systems, and components for evaluation; identify
additional documents needed to support the inspection; and obtain unescorted access.
The enclosure to this letter provides an initial list of the documents the team will need for their
review. We request that your staff transmit copies of the documents listed in the enclosure to
the NRC Region II office for team use in preparation for the inspection. Please send this
information so that it will arrive in the NRC Region II office by the dates listed in the enclosure.
October 30, 2024
E. Pigott 2
During the weeks leading up to the inspection, the team leader will discuss with your staff the
following inspection support administrative details: (1) office space size and location; (2) specific
documents requested to be made available to the team in their office spaces; (3) arrangements
for reactor site access (including radiation protection training, security, safety, and fitness for
duty requirements); and (4) the availability of knowledgeable plant staff and licensing
organization personnel to serve as points of contact during the inspection.
We request that during the on-site inspection weeks you ensure that copies of analyses,
evaluations, or documentation regarding the implementation and maintenance of the station fire
protection program, including the success path necessary to achieve and maintain the nuclear
safety performance criteria, be readily accessible to the team for their review. Of specific
interest for the fire protection portion of the inspection are those documents which establish that
your fire protection program satisfies NRC regulatory requirements and conforms to applicable
NRC and industry fire protection guidance (i.e., fire protection compliance assessment
documents). Also, personnel should be available at the site during the inspection who are
knowledgeable regarding those plant systems required to achieve and maintain safe and stable
plant conditions, including the electrical aspects of the nuclear safety capability assessment,
reactor plant fire protection systems and features, and the station fire protection program and its
implementation.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget under control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection or the inspection teams information or logistical needs, please
contact Jonathan Montgomery, the team lead inspector, in the Region II office at (404) 997-
4880 or jonathan.montgomery@nrc.gov, or me at (404) 997-4518.
Sincerely,
Daniel Bacon, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-369, 50-370
License No. NPF-9, NPF-17
Enclosures:
Fire Protection Team Inspection
Document Request
cc w/enclosure: via ListServ
Signed by Bacon, Daniel
on 10/30/24
ML24303A421
X Non-Sensitive X Publicly Available
X SUNSI Review
Sensitive Non-Publicly Available
OFFICE RII/DRS RII/DRS
NAME J.Montgomery D.Bacon
DATE 10/30/24 10/30/24
Fire Protection Team Inspection Document Request
The initial request for information (i.e., first RFI) concentrates on providing the inspection team
with the general information necessary to select appropriate samples to develop a site-specific
inspection plan. The first RFIs requested information is specified below in items A.1 thru A.22,
and is requested to be provided by Friday, November 8th or sooner, to facilitate the selection of
the specific items that will be reviewed during the onsite inspection weeks.
Electronic format is the preferred format, except where specifically noted. If electronic files are
made available via a secure document management service, then the remote document access
must allow inspectors to download, save, and print the documents in the NRCs regional office.
If a secure document management service is utilized, it is recommended that a separate folder
be used corresponding to each item listed below. Documents should be identified by both
document number and noun name. Electronic media on compact disc or paper records (hard
copy) are also acceptable.
The inspection team will examine the returned documentation from the first RFI and
identify/select specific samples to provide a more focused follow-up request to develop the
second RFI. The inspection team will submit the specific selected samples to your staff by
Friday, November 15th. We request that the additional information provided from the second RFI
be made available by Friday, December 6th
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
the listed documents. It is recognized that some documents listed below may not be available
for your plant. In addition, the document titles listed below are based on typical industry
document names; your plant-specific document titles may vary.
Enclosure
A. DESIGN AND LICENSING BASIS DOCUMENTS
A.1 The current version of the Fire Protection Program and Fire Hazards Analysis
A.2 Post-fire Nuclear Safety Capability, Systems, and Separation Analysis (NSCA),
and the supporting calculations that demonstrate acceptable plant response.
A.3 Fire PRA Summary Report, and list of Fire PRA calculations
A.4 NFPA 805 Transition Report, developed in accordance with NEI 04-02
A.5 List of post-fire safe shutdown systems and components (i.e., safe shutdown
equipment list).
A.6 List of fire areas with automatic fire suppression systems
A.7 List, with descriptions, of design change packages performed since the last fire
protection team inspection associated with fire protection or post-fire safe
shutdown systems.
A.8 List, with descriptions, of any fire protection program changes and evaluations
(not limited to Generic Letter 86-10 evaluations) performed since the last fire
protection team inspection
A.9 Fire Protection System(s) Design Basis Document.
A.10 List of applicable NFPA codes and standards and issuance dates (i.e., codes of
record).
A.11 A list or document identifying any deviations from the NFPA codes of record.
A.12 Facility Operating License.
A.13 Technical Specifications (electronic format only).
A.14 Updated Final Safety Analysis Report (electronic format only).
A.15 Copy of NRC Safety Evaluation Reports that form the licensing basis for:
- Post-fire Nuclear Safety Capability
A.16 Copy of exemption requests submitted but not yet approved for plant fire
protection and post-fire nuclear safety capability features.
2
A.17 List of post-fire safe shutdown-related design changes completed in the last three
years (including their associated 10 CFR 50.59 and/or fire protection program
change evaluations).
A.18 List of the top 25 highest fire CDF scenarios for each unit
A.19 List of the top 25 highest fire LERF scenarios for each unit
A.20 From your most recent PRA including external events and fires:
a. Two risk rankings of components from your site-specific PRA: one sorted
by Risk Achievement Worth (RAW), and the other sorted by Birnbaum
Importance
b. A list of the top 500 cut-sets
A.21 Copy of the Quality Assurance Program Manual (including specific fire protection
QA manual, if applicable)
3