Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403
ML24100A874
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/10/2024
From: Daniel Bacon
Division of Reactor Safety II
To: Pigott E
Duke Energy Carolinas
References
IR 2024403
Download: ML24100A874 (8)


See also: IR 05000369/2024403

Text

Edward Pigott

Site Vice President

Duke Energy Carolinas, LLC

McGuire Nuclear Station

12700 Hagers Ferry Road

Huntersville, NC 28078-8935

SUBJECT: MCGUIRE NUCLEAR STATION - INFORMATION REQUEST FOR THE

CYBERSECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM

INSPECTION 05000369/2024403; 05000370/2024403

Dear Edward Pigott:

On June 24, 2024, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cybersecurity, Revision 0 at

your McGuire Nuclear Station. The inspection will be performed to evaluate and verify your

ability to provide assurance that your digital computer and communication systems and

networks associated with safety, security, or emergency preparedness (SSEP) functions are

adequately protected against cyber-attacks in accordance with Title 10 of the Code of Federal

Regulations (10 CFR) 73.54 and the U.S. Nuclear Regulatory Commission (NRC) approved

cyber security plan (CSP). The onsite portion of the inspection will take place during the week of

June 24, 2024.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to

ensure a productive inspection for both parties, we have enclosed a request for documents

needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cybersecurity IP. This information should

be made available electronically no later than May 10, 2024. The inspection team will review

this information and, by May 17, 2024, will request the specific items that should be provided for

review. This second group of additional requested documents will assist the inspection team in

the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive

architecture, and the areas of the licensees CSP selected for the cybersecurity inspection. We

request that the information provided from the second RFI be made available to the regional

office prior to the inspection by June 14, 2024.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, June 24, 2024.April 10, 2024

E. Pigott 2

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Philipp Braaten. We understand that our regulatory

contact for this inspection is Jeff Thomas of your organization. If there are any questions about

the inspection or the material requested, please contact the lead inspector at (404) 997-4651 or

via e-mail at Philipp.braaten@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Daniel Bacon, Branch Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 05000369 and 05000370

License Nos. NPF-9 and NPF-17

Enclosure:

McGuire Nuclear Station Cybersecurity Inspection Document Request

cc w/encl: Distribution via LISTSERV

Signed by Bacon, Daniel

on 04/10/24

ML24100A874

X Non-Sensitive X Publicly Available

X SUNSI Review

Sensitive Non-Publicly Available

OFFICE RII/DRS RII/DRS

NAME P. Braaten D. Bacon

DATE 4/10/2024 4/10/2024

Inspection Report: 05000369/2024403; 05000370/2024403

Inspection Dates: June 24 - 28, 2024

Inspection Procedure: IP 71130.10, Cybersecurity, Revision 0 (Effective: 01/01/2022)

Reference: Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full-Implementation of

the Cyber Security Inspection, Rev. 2 (Issued: 11/22/2021)

NRC Inspectors:Philipp Braaten, Lead William Monk

404-997-4651 404-997-4579

Philipp.Braaten@nrc.gov William.Monk@nrc.gov

NRC Contractors: Balla Barro James Hartman

Balla.Barro@nrc.gov James.Hartman@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection team

with the general information necessary to select appropriate components and CSP elements to

develop a site-specific inspection plan. The first RFI is used to identify the list of critical

systems and critical digital assets (CSs/CDAs) plus operational and management (O&M)

security control portions of the CSP to be chosen as the sample set required to be inspected

by the cybersecurity IP. The first RFIs requested information is specified below in Table

RFI #1. The Table RFI #1 information is requested to be provided to the regional office by May

10, 2024, or sooner, to facilitate the selection of the specific items that will be reviewed during

the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused

follow-up request to develop the second RFI. The inspection team will submit the specific

systems and equipment list to your staff by May 17, 2024, which will identify the specific

systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture,

and the areas of the licensees CSP selected for the cybersecurity inspection. We request that

the additional information provided from the second RFI be made available to the regional

office prior to the inspection by June 14, 2024. All requests for information shall follow the

guidance document U.S. NRC - Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full Implementation of the Cyber Security

Inspection, referenced above.

The required Table RFI #1 information shall be provided electronically to the lead inspector by

May 10, 2024. The preferred file format for all lists is a searchable Excel spreadsheet file. The

information should be indexed and hyper-linked to facilitate ease of use. If you have any

questions regarding this information, please call the inspection team leader as soon as

possible.

Enclosure

Table RFI #1

Paragraph Number/Title: IP Ref

A list of all Identified Critical Systems and Critical Digital Assets, -

1 highlight/note any additions, deletions, reclassifications due to new Overall

guidance from white papers, changes to NEI 10-04, 13-10, etc. since

the last cybersecurity inspection.

2 A list of EP and Security onsite and offsite digital communication Overall

systems.

3 Network Topology Diagrams to include information and data flow for Overall

critical systems in levels 2, 3, and 4 (If available).

4 Ongoing Monitoring and Assessment program documentation. 03.01(a)

5 The most recent effectiveness analysis of the Cybersecurity Program. 03.01(b)

Cybersecurity Incident Response program documentation, including

incident detection, response, and recovery documentation as well as 03.02(a)

6 contingency plan development, implementation, and including any and

program documentation that requires testing of security boundary 03.04(b)

device functionality.

7 Password/Authenticator program documentation. 03.02(c)

Design change/ modification program documentation and a list of all

8 design changes completed since the last cybersecurity inspection, 03.03(a)

including either a summary of the design change or the 50.59

documentation for the change.

9 Supply Chain Management program documentation including a list of 03.03(a), (b)

security impact analysis for new acquisitions. and (c)

Configuration Management program documentation including a list of 03.03(a)

10 security impact analysis performed due to configuration changes since and (b)

the last cybersecurity inspection.

11 Cyber Security Plan and any 50.54(p) analysis to support changes to 03.04(a)

the plan since the last inspection.

12 Cybersecurity Performance Metrics tracked (if applicable). 03.06(b)

13 Provide a list of all cybersecurity procedures and policies with their Overall

descriptive name and associated number.

14 Performance testing report (if applicable). 03.06(a)

Any cybersecurity event reports submitted in accordance with 10 CFR 15 73.77 since the last cybersecurity inspection and any copies of any 03.04(a)

recordable cybersecurity events since the last inspection

2

Based on this information, the inspection team will identify and select specific systems and

equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list

of specific systems and equipment to your staff by May 17, 2024, for the second RFI

(i.e., RFI #2).

II. Additional Information Requested to be Available Prior to Inspection

As stated in Section I above, the inspection team will examine the returned documentation

requested from Table RFI #1 and submit the list of specific systems and equipment to your

staff by May 17, 2024, for the second RFI (i.e., RFI #2). The second RFI will request additional

information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the

licensees CSP selected for the cybersecurity inspection. The additional information requested

for the specific systems and equipment is identified in Table RFI #2. All requested information

shall follow the guidance document referenced above.

The Table RFI 2 information shall be provided to the lead inspector by June 14, 2024. The

preferred file format for all lists is a searchable Excel spreadsheet. The information should be

indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this

information, please call the inspection team leader as soon as possible.

Table RFI #2

Paragraph Number/Title: Items

For the system(s) chosen for inspection provide:

1 Ongoing Monitoring and Assessment activity performed on the 03.01(a)

selected system(s).

2 All Security Control Assessments for the selected design changes 03.01(a)

and system(s). *

All vulnerability screenings/assessments associated with, or scans

performed on the selected system(s) since the last cybersecurity

3 inspection. * 03.01(c)

All vulnerability screenings and assessments completed prior to

putting new equipment into service as part of the select design

changes.

Documentation (including configuration files and rules sets) for

Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),

4 Host-based Intrusion Detection Systems (HIDS), and Security 03.02(b)

Information and Event Management (SIEM) systems for system(s)

chosen for inspection (i.e. the devices that are credit for protection

for the selected systems). *

3

Documentation (including configuration files and rule sets) for intra-

5 security level firewalls and boundary devices used to protect the 03.02(c)

selected system(s).

6 Copies of all periodic reviews of the access authorization list for the 03.02(d)

selected systems since the last cybersecurity inspection.

7 Baseline configuration data sheets for the selected CDAs and for 03.03(a)

selected design changes. *

8 Security impact analysis for the selected design changes. 03.03(b)

9 Copies of the purchase order documentation for selected design 03.03(c)

changes.

Copies of any reports/assessment for cybersecurity drills performed 03.02(a)

10 since the last inspection. 03.04(b)

Copy of the individual recovery plan(s) for the selected system(s) 03.02(a)

11 including documentation of the results the last time the backups 03.04(b)

were executed.

List of Corrective actions taken as a result of cybersecurity

12 incidents/issues to include previous NRC violations and Licensee 03.05

Identified Violations since the last cybersecurity inspection.

13 Vulnerability Management program screening and assessment 03.01(c)

policies and procedures

14 The most recent Cybersecurity Quality Assurance audit and/or self-

assessment and a list of Corrective Actions generated as a result

  • Some selected systems may have a large number of CDAs. For these systems reach out to the

team leader for a specific selection of CDAs when responding to this request.

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the following RFI

(i.e., Table Week Onsite) to the team by June 24, 2024, the first day of the inspection. All

requested information shall follow the guidance document referenced above.

The preferred file format for all lists is a searchable Excel spreadsheet file. The information

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

4

Table Week Onsite

Paragraph Number/Title: Items

Updated copies of corrective actions taken as a result of

1 cybersecurity incidents/issues, to include previous NRC violations 03.05

and Licensee Identified Violations since the last cybersecurity

inspection, as well as vulnerability-related corrective actions.

IV. Information Requested to Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have any questions regarding the information requested, please contact the inspection