Summary of Meeting with Duke Energy Carolinas, LLC, on Upcoming Submittal of License Amendments Regarding Implementation of National Fire Protection Association Standard 805, (TACs ME5767 & ME5768, Catawba 1 & 2 ME5769 & ME5770 Mcguire 1 &
ML11097A027
Person / Time
Site: Catawba, McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/14/2011
From: Jacqueline Thompson
Plant Licensing Branch II
To:
Thompson J
References
TAC ME5767, TAC ME5768, TAC ME5769, TAC ME5770
Download: ML11097A027 (18)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 April 14, 2011 LICENSEE: DUKE ENERGY CAROLINAS, LLC (DUKE)

FACILITY: CATAWBA NUCLEAR STATION, UNITS 1 AND 2 (CATAWBA 1 AND 2), AND MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 (MCGUIRE 1 AND 2)

SUBJECT:

SUMMARY

OF MARCH 23, 2011, MEETING WITH DUKE ON UPCOMING SUBMITTAL OF LICENSE AMENDMENTS REGARDING IMPLEMENTATION OF NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA 805) (TAC NOS. ME5767 AND ME5768, CATAWBA 1 AND 2; ME5769 AND ME5770, MCGUIRE 1 AND 2)

On March 23,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Duke Energy Carolinas, LLC (Duke, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss Duke's plans for upcoming license amendment requests to implement NFPA-805 at Catawba 1 and 2 and McGuire 1 and 2. A list of attendees is provided as Enclosure 1.

The licensee presented information (See Enclosure 2) on the status of license amendment submittals to implement NFPA-805 for McGuire 1 and 2 and Catawba 1 and 2. The licensee provided a detailed presentation of the components of the license amendment request (LAR) for McGuire 1 and 2, currently scheduled for submittal on June 29, 2011, and a summary level discussion of the LAR for Catawba 1 and 2, now scheduled for Summer 2012. The licensee also discussed the impact of NFPA-805 implementation at Oconee Nuclear Station, Units 1, 2, and 3 (Oconee 1, 2, and 3) on licensing activities for NFPA-805 at Catawba 1 and 2 and McGuire 1 and 2.

During the discussion of McGuire 1 and 2, the NRC staff asked about the scope of issues associated with implementing NFPA-805 at McGuire 1 and 2 versus the effort to do the same at Oconee 1, 2, and 3. The licensee responded that one of the main differences was the increased number of fire areas at McGuire 1 and 2. The NRC staff asked if there would be the same license conditions at McGuire 1 and 2 and Catawba 1 and 2 as there were in the license amendment for Oconee 1, 2, and 3. The licensee replied that there would not be the same licensee conditions . The NRC staff also asked several more questions about page 5 of the meeting handouts which presented the process for developing the LAR for McGuire 1 and 2.

Duke -2 Members of the public were in attendance . Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1119, or jon.thompson@nrc.gov.

Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-413, 50-414 ,

50-369, and 50-370

Enclosures:

1. List of Attendees
2. Licensee's Handout cc w/encls : Distribution via Listserv

LIST OF ATTENDEES MARCH 23, 2011, MEETING WITH DUKE ENERGY CAROLINAS (DUKE), LLC REGARDING UPCOMING SUBMITTAL OF LICENSE AMENDMENTS FOR IMPLEMENTATION OF NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA-805)

Name Organization J. Thompson Nuclear Regulatory Commission (NRC)

T. Basso Nuclear Energy Institute A. Driver Duke K. Ashe Duke D. Goforth Duke J. Paige NRC H. Barrett NRC A. Klein NRC P. Lain NRC D. Harrison NRC J. Robinson NRC S. Dinsmore NRC D. Pickett NRC S. Lee NRC G. Kulesa NRC A. Afzali Southern Nuclear Operating Company (SNC)

R. Hart Duke W. Cross NEXTera Energy

v. Rubano NEXTera Energy S. Dolcemascolo Southern California Edison (SCE)

G. Chung SCE B. Richter SCE P. Grissom SNC R. Gladney SNC Enclosure 1

Fire Protection License Amendment NFPA 805 National Fire Protection Association Duke Energy Updates David Goforth March 23, 2011 Enclosure 2

I Introduct ions . ~u."=-~ * ..~&aJ R~~!!~~~t ~

  • David Goforth - NFPA 805 Technical Manager
  • Adrienne Driver - Catawba Nuclear Station (CNS) Regulatory Compliance Engineer
  • Randy Hart - CNS Regulatory Compliance Manager
  • Ken Ashe - McGuire Nuclear Station (MNS)

Regulatory Compliance Manager 4/7/2011 "B::-rgy. 2

Agenda NFPA805 Fire Protection Project

MNS Status NFPA 805 Fire Protection Project

  • Traditional Fire Protection
  • Nuclear Safety Capability Assessment (NSCA)
  • Fire Probability Risk Assessment (FPRA)
  • Non-Power Operations
  • Radioactive Release

"~Y. 4

eNS Status NFPA805 Fire Protection Project

  • Traditional Fire Protection
  • Nuclear Safety Capability Assessment

. (NSCA)

  • Non-Power Operations
  • Radioactive Release

"=v. 6

z:

"~

co o

en

NFPA805 ONS Status ONS HIGH LEVEL TIMELINE Monday. January 31. 2011 Jun 11 Apr 12 Apr 11 805 monitoring Nov 11 &;,If Appr LAR Impl Mod Review Process I FPRA Peer Rev . complete

~:

Jun 12 Jul 12 Nov 11 - Mar 12 PSW Impl NSCA & DBD Updated Revi~ Calc

~

"....-_ _ _A ......_ _--..

r "

Ocl11 Jan 12 Apr 12 Ju.112* - Oct12 -

Jan-11 Dec~12

/ Nov 12 May 11 Jun 11 Approve Procedures Fire Imp.Log 805 Monitor edure Training Sep 12 Dec 12 Jul-12 Dec-12 page 1 4/7/2011 "H::::,Y. 8

n

~

n Q)

~

Q)

~

T

Scheduling Insights F~~!~O~!~I *

  • Completed CNS and MNS FPRA Peer Reviews
  • ONS RAI and SE period required realignment of FPRA resources to ONS
  • Every effort is being made to submit the MNS NFPA 805 LAR by June 29, 2011. IN 11-01 is pulling much needed resources from the project.
  • FPRA resources are not available to complete a CNS NFPA 805 LAR by June 29, 2011
  • Request staggered submittal of the CNS NFPA 805 LAR to Summer 2012 4/7/2011 "B:::;,VG 10

Nuclear Safety Review for Staggering of the eNS LAR NFPA805 Fire Protection Project

  • NFPA 805 VFDR's identified in all Fire Areas that have been reviewed (IV half the F/A's have been reviewed)
  • For those VFDR's that have been reviewed, compensatory actions in place as needed for outstanding VFDR's that violate the current license basis (NUREG 0800) 4/7/2011 lte::ergye 11

Nuclear Safety fot Staggering of the 'eNS LAR NFPA805 Fire Protection Project OPEN ITEMS

1. 1(2)NV-202B or 1(2)NV-203A may affect credited train NV Pump
2. Hemyc fire wrap may not provide one hour fire barrier
3. Missing 8-hour lighting to and at control stations used for Control Room evacuation
4. Cables from SSF Battery to 2KSI are routed through Unit 2 Battery Room which is SSF 550 Area
5. Potential 92-18 Valve Issues RESOLVED ITEMS
1. Improper Breaker Coordination could result in loss of 1(2)EDF : PIP C-07-2458.
2. Improper Breaker Coordination could result in loss of 1(2)EPD : PIP C-07-2458.
3. 1(2)NV-188A or 1(2)NV-189B may affect credited train NV Pump 4/7/2 011 "H:::;,Y. 12

SUMM"ARY F~f!.~o~~~ *

  • ONS Implementation Period to be completed by January 1, 2013
  • Request eNS NFPA 805 LAR due date be extended to the summer of 2012 4/7/2011

"~ITW. 13

os::

to r+

'"o-.

J

ML11097A027 OFFICE DORULPL2-1/PM DORULPL2-1/LA DORULPL2-1/BC DORULPL2-1/PM NAME JThompson MO'Brien GKulesa (PBoyle for) JThompson DATE 04/13/11 04/13/11 04/14/11 04/14/11