MONTHYEARML22325A3142022-11-30030 November 2022 November 30, 2022, Pre-Submittal Presentation Slides TSTF-505 and 10 CFR 50.69 (L-2022-LRM-0084) ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML21236A2862021-08-30030 August 2021 License Amendment Request for Revision 1 of DPC-NE-1007-P, Conditional Exemption of the End-of-Cycle (EOC) Moderator Temperature Coefficient (Mtc) Measurement Methodology ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18239A3682018-08-27027 August 2018 License Amendment Request Pre-Submittal Conference Call August 29, 2018 ML18089A0532018-03-30030 March 2018 Summary of Public Meeting with McGuire Nuclear Station ML17278A1342017-10-0404 October 2017 Duke Presentation for Public Meeting 09-20-17 ML16242A2382016-08-30030 August 2016 Catawba/Mcguiproposed Changes to Technical Specification 3.8.1, AC Sources - Operating. ML16082A0682016-03-21021 March 2016 Summary of Meeting with the Public Concerning the Annual Assessment of McGuire Nuclear Station, Units 1 and 2 ML15106A0222015-04-15015 April 2015 Summary of Meeting with Public to Discuss Annual Assessment of McGuire Nuclear Station, Units 1 and 2, in Huntersville, North Carolina ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14136A1302014-05-15015 May 2014 End of Cycle Meeting Summary Memo ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13218B2272013-08-0606 August 2013 Vital Battery Replacement, 08-05-13 ML13210A3002013-07-30030 July 2013 Proposed Relief Request 13-MN-002 Risk-Informed/Safety Based (Ris_B) ISI Alternative for Class 1 and 2 Piping ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12128A0522012-05-0303 May 2012 Annual Assessment Meeting, Slides ML11125A0122011-05-0404 May 2011 Summary of Public Meeting with Duke Energy Carolinas, LLC, McGuire, to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for the Period of 01/01/10 - 12/31/10 ML11097A0272011-04-14014 April 2011 Summary of Meeting with Duke Energy Carolinas, LLC, on Upcoming Submittal of License Amendments Regarding Implementation of National Fire Protection Association Standard 805, (TACs ME5767 & ME5768, Catawba 1 & 2 ME5769 & ME5770 Mcguire 1 & ML0927304602009-10-0707 October 2009 09/01/2009 Summary of Conference Call with Duke Regarding Responses to Generic Letter (GL) 2004-02. Meeting Handouts ML0833000612008-11-24024 November 2008 Meeting Slides for Category 1 Public Meeting with Duke Energy Carolinas, Regarding a Request for Additional Information on Duke'S Response to GL 200-04 ML0826708642008-09-18018 September 2008 Regulatory Conference - Service Water Strainer Backwash System ML0819903672008-07-15015 July 2008 Handouts from Duke Energy & NRC Meeting - NQA-1 Based QA Program Conversion ML0719903572007-04-30030 April 2007 EOC Meeting Slides ML0611601322006-04-25025 April 2006 Slides from McGuire Nuclear Station Annual Assessment Meeting ML0519902612005-04-19019 April 2005 NRC Cy 2004 Annual Assessment Meeting, McGuire Nuclear Station ML0510103142005-04-0101 April 2005 Attachment 1, ASME Wall Tap Flow Nozzles for Mur Uprate Summary of Meeting with Duke Energy Corp on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240) ML0510103232005-04-0101 April 2005 Attachment 2, Bill of Material - QA Condition 4, Drawing D-4737-2A,18-900# Sch ASME PIC-6 Primary Feedwater Flow Sectionsummary of Meeting with Duke Energy Corp on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240) ML0502501572004-12-0606 December 2004 Meeting Presentation Slides to 12/06/2004 Summary of Meeting with Duke Energy Corporation to Discuss Appendix R Reconstitution and Transition to NFPA 805 ML0421903532004-07-30030 July 2004 Summary of 07/27/2004 Meeting with Duke Energy Corp. Re. Modification to Quality Assurance Program for Catawba, McGuire, and Oconee Nuclear Station, Attachment 2 - Meeting Handouts ML0421501022004-07-20020 July 2004 Presentation of 07/20/2004, Plant Performance Update Meeting (Mcguire) ML0411105312004-04-0808 April 2004 Duke Energy Corporation Meeting Handouts, Enclosure 2, Meeting Summary ML0327206212003-09-24024 September 2003 Examiner - Vendor Matrix with Phone Number ML0327206112003-09-22022 September 2003 Exam Process ML0309806272003-04-0404 April 2003 Annual Assessment Meeting for McGuire Nuclear Station ML0308002472002-12-10010 December 2002 Meeting Handouts December 10-11, 2002 Duke-FPL-NRC Meeting Racksaver Licensing ML0232403132002-11-22022 November 2002 Meeting Summary Enclosure 2 Handouts. Includes NEI Presentation Industry Comments on NRC Program Plan. ML0233301042002-10-0101 October 2002 Enclosure 2 to the 10/01/2002, Summary of Public Meeting with Duke Energy Corporation, Informal Response to McGuire Units 1 & 2 and Catawba Units 1 & 2 Safety Evaluation Report with Open Items ML0215403652002-05-23023 May 2002 Stations Meeting Handouts to Discuss Topical Report DPC-NE-1005P, Nuclear Design Methodology Using CASMO-4/SIMULATE-3 MOX, Submittal by Duke ML0213404582002-05-16016 May 2002 Training Managers Conference Handouts ML0206300272002-02-0505 February 2002 K. Lindquist Northeast Technology Corp 02/05/2002 Meeting Presentation Badger & Racklife. ML0205303982002-01-0808 January 2002 Attachment to the 01/08/2002 Mtg with NEI, Southern Nuclear Operating Company (Snc), Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), and Exelon Generation Company (Exelon) 2022-09-14
[Table view] Category:Performance Indicator
MONTHYEARML0421501022004-07-20020 July 2004 Presentation of 07/20/2004, Plant Performance Update Meeting (Mcguire) 2004-07-20
[Table view] |
Text
Duke e
1 Power@
e Organization Update - G ~ VP ~ ~ W S O ~
Plant Performance Review - G ~ V P ~ ~ W S O ~
Site Initiatives - TO^ H E J I T ~ ~ ~
Dose and Contamination Control - TOP^ Harrail
@ Fire Protection - SCO~~BRNV~
@ Security Update - sim ~ a m m e r
e Duke ir [I Power, OK§ VP Bi!l Mccc116ln: CkizR Jarnil Ron............
Jones Station Manager Engineering RSatiager Scott Brown
.. .~. , _ _ .I_ .. . . .. ..-~
Duke Power, 100%
s v
t P
lEOC16 136.92 EFPD) m m d d s s d
cr)
?
3
?
0 e
WI s?
s 0
s 0 3 3
3 3
4 0
m 0 0 4
Duke 1 Power, ZI:CCTS (RO.6FEPD)
I
...... x.,_ji.~.A....~.4
......... I.....
~
.... ......~., .. .. .... ...
Duke Power, 50 00%
0.00% I Jan Feb Mar APr Msy Jun Jui 2004YTD - 93.14'/0 2003 Actual - 98.3%
2002 Actual - 93.5%
6
Duke Power, 100.00% 100.00% .. .- .....
80.00%
60.00%
40.00%
20.00%
0.00%
Jan Feb Mar APr M Y Jun Jul 2004 YTD - 100.00"/0 2003 Actual - lOO.0Oo/o 2002 Actual - 95.00'/0
Duke Power, I
98.30%
100.00%
80.00%
60.00%
40.00%
20.00%
0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2004 UTD - 98.30%
2003 Actual - 100.00%
2002 Actual - 98.57%
8
Duke Power, FP : ISF Perlormancr DiilllE~et~ 96 4% 96.4% 90 O'h LP.2 ERO Drill PartmMlion I 98 8% I 98.8% I 80 o x
Duke
- Power,
\.,
\.;.;.:......
i..:
- .:..:.;y
..... J 1 I..
<m+r2-.:.:<.:
e I! ea Duke Power, Goal
- Continuously improve McGuires focus on industrial safety by reducing injuries The Plan
- Strengthen safety attitude
- Improve field observations
- Improve safety awareness
Duke Power, 2004 YTB - 0.600 2003 Actual - 2.99 2002 A&.d - 1.23
Duke Power,
@ Goal
- To improve McGuires performance by reducing Procedure Use & Adherence (PU&A) and Correct Component Verification (CCV) events due to human error
@ The Plan Improve performance by decreasing PU&A and CCV errors Identify / eliminate/ protect against error-likely situations Improving human factors in procedure development I3
Results Human performance error rate 15 2.8 Avg number of days between HP events 228 122
Duke m Power, Goat
- Significantly improve McGuire's outage performance The Plan
- Improve / expand Outage Control Center
- Develop a high-level critical path schedule
- Improve bulk work management
- Levelize / resource work load
Results
- Improved core damage probability
- No License Event Reports
- Improved execution time in 4 of 9 outage windows
- Major Activities Reactor vessel lower head inspection Reactor Coolant Pump shaft inspection e Steam generator 100% ddy Current on A&D testing Steam generator 50% Eddy Current on B&C testing 0 127 modifications successfully implemented e Repair of MSlV 1SMQQQ7
- Duration of 36 days, 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />
.,. . .. ... . . . . .. .. . . ~ ,~..
1 Duke Power, Goal
- Improve our system 1 equipment reliability while maintaining high availability The Plan
- Improve Plant Health Committee process
- Improve PM task oversight process
- Find and fix single point vulnerabilities
i.
... '.,d,x ....
Duke Power,
@ Results
- Lost generation days due to equipment failures Current: 7.35 Days
- Lost generation events due to equipment failures Current: 1
- Safety system unavailability Current: NRC Performance Indicators Mitigating Systems - all green
Y -..~.
Duke Power, Dose 1 Contamination Issues - 1EOC16 Mar 04 outage Event Investigation Team (EIT) formed - Broad based team including INPO, EPRI, and Industry Experts Findings and Results Number of Reactor Coolant (NC) Pumps run during CRUD burst cleanup affected contamination levels in SGs Major contribution to dose rates appears due to adherent CRUD on fuel Probe scrubbers were inadequate 49
. ..), ."
.....,....... .. .....~......
_i %. ."._..
........i.... . ...... '.;.*..'-&
Duke Power, McGuire Design
- Safe Shutdown Facility (SSF)
- Armore
- Fire Barrier Configuration Management
@ lssu
- Six non-cited violations in 2004
- Six open URls
Duke Power@
@ Actions to Restore Health
- Reorganized approach; separate Fire Protection and Appendix R Program Working Groups
- Working Groups are developing a fleet-wide strategy to address and resolve program deficiencies
- McGuire-specific Fire Protection and Appendix R recovery plans have been developed
- Recovery plans to be actively monitored by Senior Management