MONTHYEARML20235K2511987-07-0909 July 1987 Requests Addl Info to Assess Safe Operation of Facility Following 1987 Refueling Outage.Concerns Expressed Re Supports Inadequate to Meet Design Loads & Original Design Loads Derived Inappropriately.Submittal of Fee Not Required Project stage: Other IR 05000344/19870271987-07-0909 July 1987 Insp Rept 50-344/87-27 on 870622-26.No Violations or Deviations Noted.Major Areas Inspected:Usi A-26 & Followup & Closure of Previous Insp Findings Project stage: Request ML20235J9241987-07-10010 July 1987 Forwards Summary of Secondary Piping Inspected/Replaced During 1987 Trojan Refueling Outage.Insps Identified Numerous Locations Where Pipe Wall Thinning Occurred in Secondary Piping Project stage: Other ML20235J3961987-07-10010 July 1987 Responds to NRC on Concerns Re safety-related Supports at Plant,Including Original Design,Derivation of Original Design Loads & Original Design Calculation for Main Steam Sys Designed for Plant Project stage: Other IR 05000344/19870241987-07-10010 July 1987 Insp Rept 50-344/87-24 on 870524-0725.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Piping Support & Restraint Sys & Followup on Previously Identified Items Project stage: Request ML20235R8801987-07-15015 July 1987 Forwards Revised Pages to Util 870710 Response to NRC Re safety-related Piping Supports at Facility.Changes Do Not Affect Results or Conclusions of Verification Program in Project stage: Other ML20235W2921987-07-16016 July 1987 Forwards Questionnaire Re Erosion/Corrosion in Feedwater Pipes & Requests That Util Complete & Return within 60 Days of Ltr Receipt.Questionnaire Supports Forthcoming NRC Rept Re Surry Pipe Erosion/Corrosion Incident in Dec 1986 Project stage: Other ML20236H8371987-07-20020 July 1987 Forwards 870716 Request for Info Re Plant Erosion/Corrosion Program.Encl Inadvertently Omitted Project stage: Other ML20236F1071987-07-27027 July 1987 Forwards Addl Info Requested During NRC 870721-23 Review of Util Support Design Verification Program.Util Response to NRC Concerns Re Inadequate Supports,Original Design Loads & Documentation of Design Calculations Discussed Project stage: Other ML20236H9721987-07-31031 July 1987 Forwards Addl Info Clarifying Util 870727 Response to NRC Concerns Re Design Adequacy of Piping Supports.Util Concludes That Heatup Commencement & Return to Power Operation Safe Although All Activities Not Complete Project stage: Other ML20237H2081987-08-10010 August 1987 Rev 0 to 01-0300-1629, Independent QA Audit & Technical Quality Review of Trojan Nuclear Power Plant Pipe Support Verification Program Project stage: Other ML20237J6311987-08-13013 August 1987 Trip Rept of 870722-23 Site Visit to Gather First Hand Info Re Main Feedwater Line Pipe Wall Thinning Problem,Review Licensee Pipe Wall Thinning Monitoring Program & Evaluate Results of Licensee Failure Analysis Project stage: Other ML20237H1881987-08-18018 August 1987 Forwards Info Including Independent Audit Re Scope of Pipe Support Design Verification Program,Per 870710,15,27 & 31 Submittals.Supports Verified & short-term Program Complete. Util Will Provide Details of long-term Program by 870930 Project stage: Other ML20237J0451987-08-19019 August 1987 Forwards Trip Rept & Informs That Assurance Provided by Licensee for Safe Operation of Facility Feedwater Sys Through End of 1988 Operating Cycle Project stage: Other ML20237G6261987-08-21021 August 1987 Informs That Based on Info Provided,Nrc Finds That Util Adequately Evaluated Design Adequacy of Pipe Supports & Supports Will Fulfill Requirement,As Stated in Updated Fsar. NRC Concludes That Power Operation May Be Resumed Project stage: Other ML20237H2911987-08-21021 August 1987 Forwards Completed Questionnaire Re Erosion & Corrosion Experience at Plant,Per NRC 870716 Request Project stage: Other ML20238A5661987-09-0101 September 1987 Advises That Reasonable Assurance Provided for Safe Operation of Plant Feedwater Sys Based Upon Task Force Observations & Review of Util 870731 Submittal Project stage: Approval ML20238C6691987-09-0404 September 1987 Forwards Revised Pages of Util Re Pipe Support Design Verification Program.Ltr Revised Due to Typos Re Std Deviations in Min Rock Bolt Depth Assumption & Revised Chi- Squared Values Project stage: Other ML20235G8061987-09-25025 September 1987 Summary of 870715 Meeting W/Util,Bechtel & Gao Re Main Steam Support Adequacy & Main Feedwater Pipe Thinning.List of Attendees & Util Presentation Encl Project stage: Meeting ML20235Q8051987-09-30030 September 1987 Forwards Pipe Support Design Verification long-term Plan,Per 870818 short-term Plan,For safety-related,large-bore Piping. Encls Include Responses to Remaining short-term Concerns, Evaluation Plan for Ae Design Activity & Ae Audit Response Project stage: Other ML20236A8971987-10-13013 October 1987 Forwards Safety Evaluation Re Pipe Support Design Verification.Issues & Details of Pipe Support Design Verification long-term Plan Discussed in Will Be Addressed in Future Correspondence Project stage: Approval ML20195G9861988-06-22022 June 1988 Forwards Results of Metallurgical Evaluation of Piping Removed from Feedwater Sys,Per Commitment Made at 870715 Meeting on Feedwater Piping Erosion/Corrosion Project stage: Meeting 1987-08-10
[Table View] |
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:UTILITY
MONTHYEARIR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 IR 05000344/19890161989-06-28028 June 1989 Insp Rept 50-344/89-16 on 890514-0617.Unresolved Item Noted Re Appropriate Level of Review Necessary for Lower Tier Procedures.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Refueling Activities ML20245E6811989-06-0505 June 1989 Insp Rept 50-344/89-10 on 890326-0513.Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Followup & Open Item Followup ML20245D5851989-06-0202 June 1989 Insp Rept 50-344/89-14 on 890508-12.Violations Noted. Major Areas Inspected:Occupational Exposure During Extended Outage & in-office Review of Licensee Records IR 05000344/19890111989-05-30030 May 1989 Mgt Meeting Rept 50-344/89-11 on 890413.SALP Results for Dec 1987 - Dec 1988 Reviewed & Recent Plant Transient & Activities in Fire Protection & Outage Mgt Discussed IR 05000344/19890151989-05-26026 May 1989 Enforcement Conference Rept 50-344/89-15 on 890510.Major Areas Discussed:Concerns Identified in Security Team Insp Rept 50-344/89-02,Chemistry Team Insp Rept 50-344/89-07 & Special Insp Rept 50-344/89-13 IR 05000344/19890071989-05-23023 May 1989 Insp Rept 50-344/89-07 on 890417-21.No Violations Noted. Major Areas Inspected:Plant Chemistry Related Areas, Including Organization & Mgt,Qa Training & Qualifications, Water Chemistry Control & Analysis & Facilities IR 05000344/19890131989-05-19019 May 1989 Insp Rept 50-344/89-13 on 890409-29.Violations Noted.Major Areas Inspected:Licensee Activities Re Failure of Permissive & Interlock Features for RHR Sys Shutdown Cooling Suction Isolation Valve ML20246D8961989-04-19019 April 1989 Insp Rept 50-344/89-05 on 890212-0325.Violations Noted.Major Areas Inspected:Safety Verification,Maint,Surveillance,Event Followup,Design Engineering & Open Item Followup IR 05000344/19890061989-04-18018 April 1989 Insp Rept 50-344/89-06 on 890320-24.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Review of Lers,Followup on IE Info Notices,Mgt & Organization,Training & Qualification & Facility Tours IR 05000344/19890041989-03-23023 March 1989 Insp Rept 50-344/89-04 on 890228-0303.Violations Noted. Major Areas Inspected:Follow Up on Two Open Items & One Unresolved Item Identified During Previous Emergency Preparedness Insps & Emergency Preparedness Program ML20247G2151989-03-13013 March 1989 Insp Rept 50-344/89-01 on 890101-0211.Violations Noted.Major Areas Insepcted:Operational Safety Verification,Maint, Surveillance,Event Followup & Followup on Previously Identified Items IR 05000344/19890031989-02-10010 February 1989 Enforcement Conference/Mgt Meeting Rept 50-344/89-03 on 890126.Major Areas Discussed:Nrc Concerns Developed as Result of Insp of Commercial Grade Procurement,Per Insp Rept 50-344/88-46 & Licensee Efforts in Areas of QA Program IR 05000344/19880401988-11-0303 November 1988 Insp Rept 50-344/88-40 on 880807-1001.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19880441988-10-25025 October 1988 Mgt Meeting Insp Rept 50-344/88-44 on 881004.Major Areas Discussed:Concerns Developed as Result of Sept 1988 Reactor Trip & Subsequent Forced Outage Activities ML20154P6391988-09-16016 September 1988 Insp Rept 50-344/88-36 on 880808-12.Deviation Noted.Major Areas Inspected:Licensee Conformance to Reg Guide 1.97,Rev 3 ML20154N8951988-08-31031 August 1988 Insp Rept 50-344/88-39 on 880808-12.One Unresolved Item on Purchase & Use of Commercial Grade Items in safety-related Sys Identified.Major Areas Inspected:Commercial Grade Procurement & Pipe Support Design Verification IR 05000344/19880291988-08-31031 August 1988 Insp Rept 50-344/88-29 on 880619-0730.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Maint,Surveillance,Event Follow Up & Open Item Follow Up IR 05000344/19880311988-08-23023 August 1988 Insp Rept 50-344/88-31 on 880718-22.No Violations or Deviations Noted.Major Areas Inspected:Unresolved, Enforcement & Followup Items ML20151T4361988-07-29029 July 1988 Insp Rept 50-344/88-27 on 880627-0701.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Chemistry Controls,Control of Radioactive Matls & Contamination,External Exposure Control & Internal Exposure IR 05000344/19880261988-07-28028 July 1988 Insp Rept 50-344/88-26 on 880606-10 & 14-17.Violations Noted.Major Areas Inspected:Commercial Grade Procurement & Inservice Insp Activities IR 05000344/19880281988-07-25025 July 1988 Insp Rept 50-344/88-28 on 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Followup on Previous Insp Findings,Review of Emergency Facilities,Equipment, Instrumentation & Supplies & Exam of Training Program IR 05000344/19880321988-07-25025 July 1988 Insp Rept 50-344/88-32 on 880711-15.No Violations Noted. Major Areas Inspected:Followup of Open Items & Written Repts of Nonroutine Events ML20151K5411988-07-12012 July 1988 Insp Rept 50-344/88-24 on 880508-0618.Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Surveillance,Event Follow Up & Open Item Follow Up IR 05000344/19880231988-06-30030 June 1988 Insp Rept 50-344/88-23 on 880510-26.No Violations or Deviations Noted.Major Areas Inspected:Specs for Emergency Operating Procedures IR 05000344/19880251988-06-16016 June 1988 Insp Rept 50-344/88-25 on 880516-31.No Violations Noted. Major Areas Inspected:Licensee Activities in Resolving Reactor Plant Pipe Whip Restraint Design Vs as-built Gap Discrepancies & Inservice Insp Ultrasonic Test Activities IR 05000344/19880201988-06-10010 June 1988 Insp Rept 50-344/88-20 on 880516-20.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & Occupational Exposure During Extended Outages IR 05000344/19880151988-05-25025 May 1988 Insp Rept 50-344/88-15 on 880425-29.No Violations Noted. Major Areas Inspected:Evaluation of Design Bases of Diesel Generators,Review of Tests & Experiments Program & Review of QA Program of Measuring & Test Equipment IR 05000344/19880171988-05-23023 May 1988 Insp Rept 50-344/88-17 on 880418-21.Violation Noted.Major Areas Inspected:Licensee Fire Protection Program Implementation & Action on Previous NRC Insp Findings IR 05000344/19880181988-05-18018 May 1988 Insp Rept 50-344/88-18 on 880425-29.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Activities & Insp Procedures 30703,73051,37052,73753 & 73755 IR 05000344/19880211988-05-13013 May 1988 Mgt Meeting Rept 50-344/88-21 on 880422.Major Areas Reviewed:Salp Results for 861101-871130 & Discussion of Recently Developed Issues on Containment Isolation Valves IR 05000344/19880111988-04-27027 April 1988 Insp Rept 50-344/88-11 on 880329-31 & 0404-05.No Noncompliance Noted.Major Areas Inspected:Plant Water Chemistry Control & Chemical Analysis,Qa of Plant Chemistry Activities,Radiochemical Analysis & post-accident Sampling IR 05000344/19880121988-04-21021 April 1988 Mgt Meeting Rept 50-344/88-12 on 880325.Areas Discussed: Procedure & Maint Improvement,Outage Activities & Barton Pressure Transmitter Troubleshooting IR 05000344/19880101988-04-0707 April 1988 Insp Rept 50-344/88-10 on 880314-18.No Violations or Deviations Noted.Major Areas Inspected:Annual Review of Licensee Program to Handle Info Notices,Review of Procedures & Onsite Followup of Written Repts of non-routine Events ML20151C4741988-03-28028 March 1988 Insp Rept 50-344/88-04 on 880208-12 & 0229-0304.No Violation Noted.Major Areas Inspected:Licensee Action on Previous Findings,Organization & Mgt,Training & Qualifications,Solid Wastes,Transportation & Facility Tours IR 05000344/19880061988-03-0909 March 1988 Insp Rept 50-344/88-06 on 880222-26.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training & Followup Items & Followup Items of Noncompliance 1990-09-05
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site ML20202C2111999-01-21021 January 1999 Notice of Violation from Insp on 971207-10.Violation Noted: Licensee Did Not Perform Survey to Assure Compliance with 10CFR20.1902(d) IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning ML20199F0291998-01-15015 January 1998 Notice of Violation from Insp on 971201-03.Violation Noted: Licensee Failed to Ensure Adequate Survey of Certain Contaminated Tools IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl ML20210S7131997-09-0909 September 1997 Notice of Violation from Insp on 970721-24.Violation Noted: from 960923-970515,licensee Failed to Conduct Surveys Adequate to Evaluate Quantity of Radioactive Matl Released from Radiological Controlled Area IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program ML20135B7491997-02-25025 February 1997 Notice of Violation from Insp on 970204-06.Violation Noted: Licensee Had Not Audited Annual Radiological Environmental Report TS 6.9.1.5.1 Since 890519 IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept ML20059A1421993-12-15015 December 1993 Notice of Violation from Insp on 930930-1112.Violation Noted:Detailed Construction Package 1 Associated W/Request for Design Change 78-103,installed in May 1980,did Not Correctly Translate Design Basis Into Applicable Procedures IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items PNO-V-93-002, on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased1993-01-13013 January 1993 PNO-V-93-002:on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items ML20127E9461993-01-0808 January 1993 Notice of Violation from Insp on 921027-1207.Violation Noted:Licensees Corrective Actions Not Effective in That,On 921112 & 15,access Doors to Plant Issue Warehouse Not Controlled by Authorized Personnel PNO-V-93-001, on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media1993-01-0404 January 1993 PNO-V-93-001:on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification PNO-V-92-038, on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety1992-12-0808 December 1992 PNO-V-92-038:on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart1992-12-0101 December 1992 PNO-V-92-037:on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart ML20126E9101992-11-25025 November 1992 Notice of Violation from Insp on 920915-1026.Violation Noted:Supervisor Informed of Receipt of a Nonconforming Component,Chlorine Detector & Did Not Initiate an Ncr ML20126E9131992-11-25025 November 1992 Notice of Deviation from Insp on 920915-1026.Deviation Noted:Containment Air Locks Not Tested Using Pressure Decay Method IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities PNO-V-92-004, on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 9202271992-02-25025 February 1992 PNO-V-92-004:on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 920227 IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification PNO-V-91-002, on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable1991-03-0505 March 1991 PNO-V-91-002:on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable ML20062F9301990-11-0808 November 1990 Notice of Violation from Insp on 900902-1006.Violation Noted:Temp of Train B Component Cooling Water Pump (ASME Code Class 3 Pump) Taken W/Instrument W/Scale More than Three Times Ref Value of Bearing Temp PNO-V-90-045, State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference1990-11-0707 November 1990 PNO-V-90-045:State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference 1999-09-09
[Table view] |
Inspection Report - Trojan - 1987024 |
---|
|
|
Text
{{#Wiki_filter:-_____-_-_ _- ._ .- - - _ _ _ _ - _ - _ - _ _ _ _ _ _ - _ _ - . _ - _ - _ - _ -
1 !
.
.
,
l l
, U.S. NUCLEAR REGULATORY COMMISSION 1 REGION V !
Report No. 50-344/87-24 Docket Wo. 50-344 License No. NPF-1 Licensee: Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 L Facility Name: Trojan Inspection at: Rainier, Oregon Inspection conducted: May 24 - July 25, 1987
,
Inspectors: A 7-M 7//* h '
R. C. Barr / Date Signed Senior Resident Inspector n
G. Y. Suh
-
#
/& y//o/P'
Date Signed Resident Inspector
' Approved By: 7//# O 7 M. M. Mendonca, Chief Date Signed Reactor Projects Section 1
, Summary:
Inspection on May 24'- July 25, 1987 (Report 50-344/87-24)
Areas Inspected: Routine inspection of operational safety verification, maintenance, surveillance, piping support and restraint systems, and follow-up on previously identified item Inspection procedures 30703, 61701, 61726, 62703, 70370, 71707, 71710, 71881, 92700, 92701 and 93702 were used as guidance during the conduct of the inspectio Results: Of the areas inspected, one violation involving failure te make a timely notification to the NRC of a reportable occurrence per 10 CFl! 50.72 was identified (paragraph 4).
8708260012B70Bdh PDR ADOCK 050 p G
. - _ . -- _ . _ . = _ _ _ _ _ _ - _ _ _ _ _ _ - _ - - _ - _ _ - _ - _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ .
_ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _
.
.
DETAILS Persons Contacted
*C. A. Olmstead, Plant General Manager
*R. P. Schmitt, Manager. Operations and Maintenance
*D. W. Swan, Manager, Technical Services
*J. K. Aldersebacs, Manager, Plant Modifications
*J. D. Reid, Manager, Plant Services R. L. Russell, Operations Supervisor R. Budzeck, Assistant Operations Supervisor D. L. Bennett, Maintenance Supervisor R. A. Reinart, Instrument and Control Supervisor T. O. Meek, Radiation Protection Supervisor R. W. Ritschard, Security Supervisor T. Bushnell, Manager, Civil Engineering Branch M. Gandert, Supervising Engineer, Nuclear Plant Engineering C. H. Brown, Operations Branch Manager, Quality Assurance E
The inspectors also inte'Jviewed and talked with other licensee employees during the course of the inspection. These included shift supervisors, reactor and auxiliary operators, maintenance personnel, plant technicians and engineers, and quality assurance personne * Denotes those attending the exit intervie . Operational Safety Verification i During this inspection period, the inspectors observed and examined activities to verify the operational safety of the licensee's facilit The observations and examinations of those activities were conducted on a daily, weekly, or biweekly basi On a daily basis, the inspectors observed control room activities to verify the licensee's adherence to limiting ccnditions for operation as prescribed in the facility technical specifications. Logs, instrumentation, recorder traces, and other operational records were examined to obtain information on plant conditions, trends, and compliance with regulations. On occasions when a shift turnover was in progress, the turnover of information on plant status was observed to determine that all pertinent information was relayed to the oncoming shift personne During each week, the inspectors toured the accessible areas of the facility to observe the following items: General plant and equipment condition Maintenance requests and repair Fire hazards and fire fighting equipmen Ignition sources and flammable material contro Conduct of activities in accordance with the licensee's administrative controls and approved procedure Interiors of electrical and control panel Implementation of the licensee's physical security pla Radiation protection controls.
L___-_____________-_
. _
_ - _ - _
, . 2- . Plant housekeeping and cleanlines ' Radioactive waste system Proper. storage of compressed gas bottle The licensee's equipment clearance control was examined weekly by the l inspectors to determine that the licensee complied with technical specification limiting conditions for operation with respect to removal of l equipment from service. -Active clearances were spot-checked to ensure that their issuance was consistent with plant status and maintenance' '
evolution During each week, the inspectors conversed with operators in the control room, and with other plant; personnel. The discussions centered on pertinent topics relating to general plant conditions, procedures, security, training, and other topics aligned with the work activities involve The inspectors examinej the licensee's nonconformance reports (NCR) to confirm that deficiencies were identified and tracked by the syste Identified _nonconformances were being tracked and followed to the completion of corrective actio Logs of jumpers, bypasses, caution, and test tags were examined by the inspectors. Implementation of radiation protection controls was verified by observing portions of area surveys being performed, when possible, and by examining radiation work permits currently in effect to see that prescribed clothing and instrumentation were available and use Radiation protection instruments were also examined to verify operability and calibration-statu Routine inspections of the licensee's physical security program were performed in the areas of access control, organization and staffing, and detection and assessment systems. The inspectors observed the access control measures used at the entrance to the protected area, verified the integrity of portions of the protected area barrier and vital area barriers and observed, in several instances, the implementation of compensatory measures upon breach of vital area barriers. Portions of the isolation zone were verified to be free of obstructions and the functioning of the central and secondary alarm stations, including the use of CCTV monitors, was observed. On a sampling basis, the inspectors verified that the required minimum number of armed guards and an individual authorized to direct security activities were on sit The inspectors verified the operability of selected engineered safety features. This was done by direct visual verification of the correct position of valves, availability of power, cooling water supply, system -
integrity and general condition of equipment, as applicable. ESF systems verified operable during this inspection period included the Containment
,
Spray System.
l No violations of NRC requirements or deviations were identified.
l l
. ._ - _ _ . _ - _ _ _ _ - -____ ___-_-__ _ - - _ _
,
.
3; Maintenance The inspectors observed portions of preventive maintenance being performed for the fire ~ pump diesel engine. The work was performed.under Maintenance Requests 87-4286 and 87-1842 which covered the. quarterly, semi-annual, and annual inspections specified in Maintenance Procedure MP-12-8. The inspectors observed portions of the annual inspection which included the inspection of the turbocharger, the measurement of the' turbocharge bearing clearance and work on the cooling system. The work was performed in.accordence with MP-12-8, and the current revision of the procedure was on hand. Required equipment tagouts were in place, and quality control
. coverage. required by the procedure was provide No. violations of NRC requirements or deviations were identifie . " Surveillance The surveillance testing of safety-related systems was witnessed by the-ins pectors'... Observations by the inspectors included verification that-proper procedures ~were used, test instrumentation was calibrated and that the system or component being tested was properly removed from service if required by the test procedure. Following completion of the surveillance tests.-the inspectors verified that the test results met the appropriate-
-acceptance criteria. Any necessary corrective maintenance was completed during the conduct of-the tests in accordance with approved maintenance request (s). Surveillance tests witnessed during this period included:
TPT-189, " Centrifugal Charging Pump Total Flow and Injection Flow Balance."
During this inspection period, the inspectors also reviewed and witnessed portions of the-licensee's surveillance test of loss of offsite power with and without the presence of a safety injection signal. The test is performed at least once per 18 months during shutdown and is controlled under Periodic Operating Test P0T-12-2 titled, " Emergency Diesel Performance, Loss of Off-site Power, Diesel Automatic Start, and Auxiliary Feedwater Valve Actuation." P0T-12-2 addresses several surveillance test requirements in the technical specifications (T.S.), including specific portions of T.S. 4.8.1. The inspectors reviewed P0T-12-2 and verified that the procedural test requirements were consistent with the indicated parts of T.S. 4.8.1.1.2. The inspectors witnessed portions of the test including various system lineups in preparation for the test and the automatic start of the west emergency diesel generator with a safety injection signal present. Upon manual initiation of a safety injection signal, the diesels started from ambient condition, energized the emergency busses, energized the auto-connected emergency loads through the load sequencer, and operated for longer than five minutes. The test also verified load shedding from the emergency busses upon simulation of a loss of offsite power. The inspectors verified the completion of a sample of
'
the test prerequisites, the calibration of the performance monitor recorder, and that the appropriate revision of the test procedure was in l use by test personnel. The completed data sheets and test results were
! reviewed to verify that the appropriate acceptance criteria were me .
_._-.__m_ . _ - - - _ _ _ - . _ - - - _ - _ - - _ - . - - - _ - . - - - - - - - - - - - - . - - -
.
.
During the performance of P0T-12-2, a reactor trip signal was received at 9:02 p.m. on June 29, 1987, resulting in the open11g of reactor trip breakers RTA and RTB 'and bypass breaker BYB. The plant was in mode 5 with all control. rods fully inserted and with the rod-drive motor generator sets off. An inspector was present in the control room during this portion of the test. The licensee has initially determined the cause of the reactor trip signal to be the existence of general warnings on both solid state protection system trains. Train A had one 48 volt DC power supply breaker open. This general warning was not responded to by the operators even though the corresponding annunciator had apparently alarmed, and when they closed bypass breaker B as part of P0T-12-2, a general warning was achieved on Train B. General warnings on both trains resulted in a reactor trip signal. This event including the cause of the
. Train A 48 volt DC breaker being open is being investigated by the licensee as Event Report 87-12 This occurrence constitutes an actuation of the Reactor Protecticn System; and thus, 10 CFR 50.72 and the licensee's Nuclear Division Procedure NDP-600-3, titled " Event Reports," require that this occurrence be reported to the NRC within four hours. On June 30, 1987, the inspectors discussed the need to report this event with a licensee representative, and subsequently a report to the NRC was made at 7:05 p.m. on June 30, 1987. Failure to report an actuation of the RPS in accordance with 10 CFR 50.72 is considered a violation (87-24-01).
A review of records including the control room log, shift supervisor turnover checkoff lists, and P0T-12-2 documentation, appears to indicate that prior to this discussion with the inspectors, no written record was made of the receipt of a general warning reactor trip signal. Coincident with the report to the NRC, the event was logged in the control room log; a reactor shutdown / trip form and post-trip review form were completed; and Event Report 87-121 was initiate Although the actual safety significance of the reactor trip breakers opening was low given plant conditions at the time of occurrence, this event appears to indicate a need for increased awareness of the reporting requirements of NDP-600-3 and 10 CFR 50.72. As stated in NDP-600-3, events need to be reported to ensure that lessons learned from operating experience result in corrective actions to improve plant safety and reliability. This event indicates at least three areas where corrective actions and/or improvements need to be considere First, it appears based on the licensee's initial determination of the cause of the opening of the reactor trip breakers that Annunciator F(K13), Window A-2 labeled
" Protection System Train A Trouble," alarmed prior to the operators closing bypass breaker BYB, which resulted in a general warning reactor trip. According to the Annunciator Response Guide (ARG), Revision 12, the appropriate action is to determine and correct the cause. The ARG lists several potential causes, including loss of 48 volt DC power suppl Failure to properly respond to an annunciator alarm appears to have contributed to this event. Second, the cause of the 48 volt DC power supply breaker being open should be investigated to identify if improvements to the solid state protection system power supply are neede Third, it appears that the immediate diagnosis of the cause of the reactor
'
trip signal was made more difficult because general warning on a solid state protection system is not displayed on the reactor trip status panel.
l
[
-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
,
. 5 In addition, this event raises again the issue of procedural adherence '
discussed in recent inspection reports (e.g., 50-344/87-18 and 50-344/87-07). The required telephone notification reports per NDP-600-3 =
were not made in a timely manner as described above. NDP-600-3 also requires that PGE Nuclear Division employees shall be alert for and report ~
t all abnormal events, which as defined includes this event. Although a time limit for initiation of an event report is not specified, Event Report 87-121 was initiated subsequent to a discussion with the inspectors. Administrative Order A0-3-7, titled " Post-Trip Review and Permission for Reactor Trip Recovery and Mode Changes," requires that a Reactor Shutdown / Trip form and Post-Trip Review form be initiated following a reactor trip. Although a time limit for initiation of these forms is not specified and " reactor trip" as defined in A0-3-7 could be interpreted to not include a general warning reactor trip, the need to initiate these forms was apparently not considered prior to a discussion with the inspectors. After the discussion, both forms were initiate . Piping Support and Restraint Systems I=L
'--
An inspection was performed to verify proper installation and operation of
,
pipe and component support and restraint systems in accordance with the Technical Specifications and licensee procedures. The inspectors also reviewed the licensee's program for the surveillance of pipe supports and ,
restraints and associated record The inspectors visually examined twenty dynamic and fixed piping supports on safety-related portions of the "A" and "C" main steam lines. The inspection verified that hydraulic fluid leaks, deterioration, corrosion, physical damage and deformation were not evident. The integrity of the support plates, extension rods, and connecting joints was also examine As discussed in paragraph 6, the licensee determined that the allowable anchorage capacities of the supports for the hydraulic snubbers on each of the main steam lines was exceeded by stated design loads. As part of its response, the licensee conducted an inspection of main steam line supports. A review of this inspection program was performed, including a review of NPE Civil Guide EG-010, dated June 7, 1987, which outlined the a fa pection procedure; a review of the inspector qualification files; and a review of the inspection record For a sampling of the supports, the inspectors independently verified the inspection result In addition, the inspector performed an as-built inspection of the following hanger supports for compliance with the civil drawings and code requirements: EBB-1-2-SS-88 and 92 on the main steam lines and EBB-3-1-SR-8 on a main feedwater line. The support configuration, weld type and size were as specified on the applicable drawing The licensee's inspection program resulted in twenty-two Nonconformance Reports (NCRs). Four NCRs were related to the hydraulic snubbers on each line (EBB-1-1-SS-81 and SS-86, EBB-1-2-SS-88 and SS-92) and identified the presence of cracks between the support baseplate and grout, and between the grout and supporting wall. The remaining NCRs dealt primarily with the identification of discrepancies between the as-found condition and design drawings. These discrepancies were dispositioned by performing calculations to determine if adequate design margin could be assured for
.
_ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ . _ _ _ _ ___________ __ . _ _ _ - _ _ _ _ _ _ _ _ _ _ . _ _ _ _ __ ___________ _ _ ___.__ _
-
,
. 6
,
the as-found condition. In those cases where adequate design margin was not assured, the determination was made to restore the design margin by modifying the supports. This process resulted in identifying the need to repair three supports during this outage period in addition to the seven supports which required modifications based on a review of tiic dynamic load analyses as discussed in paragraph 6. In addition, maintenance requests were prepared to make adjustments to various hangers and supports in the main steam support structure and turbine building. The significance of these inspection findings is discussed in paragraph The Technical Specifications set forth snubber surveillance requirements consisting of a visual inspection program, functional test program, and
- service life monitoring program. The licensee's program is controlled by l
the following procedures: PET-7-2, " Hydraulic Snubber Visual Examination"; PET-9-7, " Hydraulic Snubber Functional Testing"; and PET-9-6, " Mechanical Pipe Snubber Visual Examination and Functional ,
Testing." A review of the test records for PET-9-6 verified that a visual '
inspection of an initial sample of 82 mechanical snubbers was performe One mechanical snubber failed the visual inspection, but was tested to be operable in functional testing. A 100% visual inspection of hydraulic snubbers was performed. Functional testing of mechanical snubbers
'
revealed six failures which required and resulted in, for each failure, testing of an additional 10% of the snubber units of that type. The test records of functional testing, per PET-9-7, of hydraulic snubbers on the main steam lines were reviewed. Nonconformance reports were written, as appropriate, in response to test failures. Testing of reworked snubbers demonstrated that the Technical Specifications and procedural requirements for activation velocity, bleed rate, and drag force were met. The service life monitoring program for a sample of mechanical and hydraulic snubbers was reviewed. The inspection verified records were being maintained of the installation and maintenance records for these snubber No violations of NRC requirements or deviations were identiff a . Event Follow-Up "A" Accumulator Fill Line Failures On May 12, 1987, with the plant in Mode 6, the A accumulator fill line failed immediately upstream of the socket weld to the accumulator tank nozzle. At the time, the operators were in the process of transferring water from the A accumulator to the D accumulator using the accumulator fill line Upon receiving a report of water spraying inside conta.nment, the operators shut the valves on the fill lines of both accumulators in an attempt to isolate the leakage. The operators had earlier unsuccessfully attempted to transfer water using the accumulator sample lines.
l On May 23, 1987, with the plant in Mode 6, a second failure of the A accumulator fill line was experienced at the same location. The fill line piping had been replaced per MR 87-2922. A hydrostatic test per procedure SPT-87-054 had been performed. To decrease the volume of l water in the A accumulator following the test, the operators started transferring water from the A to D accumulators through the fill
- _ _ _ _ - _ _-
,
. 7 lines. On receiving reports of loud noises in containment, the operators stopped the operation, investigated, and upon finding no apparent problems with either the A or D accumulator, the operators restarted the water transfer from A to D accumulators. Reports of l' loud noises in containment were again received. The operation was stopped and then restarted. The fill line then failed, and reports of water in containment were received. An entry in the control room log the following day instructed the operators to not use the accumulator fill lines or the accumulator sample lines to transfer water between accumulators pending evaluation of the failures. At the time of the second failure, NCR 87-163 was still outstanding on the first failure of May 1 The noise reported in containment lasted on the order of 10 seconds
!. and resembled that of a jack hammer. The source of the reported noise in containment was determined to be caused by backflow through
,
a packless metal diaphragm (PMD) manual isolation valve in the fill line which is normally held open by the force of a spring on the disc assembly. Subsequent to the second failure, the licensee's immediate actions included investigating the effect of r2 verse flow through the PMD valve, which is designed for unidirectional flow; metallurgical examination of the second failure; inspections of the PMD valves and control valves on all four accumulator fill lines; and inspections of seismic supports on the fill lines. As part of its response to the accumulator fill line failures, the licensee performed nondestructive examination testing of the welds immediately adjacent to the four accumulator tanks for all lines and subsequently on selected pipe welds on the fill and sample lines. The inspectors witnessed liquid penetrant testing of several welds and verified that the QC inspectors were following the appropriate procedures: QCP 6, titled
" Liquid Penetrant Inspection," and QCP 5, titled " Visual Examinations." Completed liquid penetrant testing reports were reviewed. Testing identified four surface indications, two on the B accumulator outlet line, one on the B accumulator fill line, and one on the D accumulator outlet line. These indications were removed by surface conditioning; and upon re-examination by liquid penetrant testing, the surfaces showed no indications. In response to NRC concerns, the licensee measured the wall thickness and performed calculations to verify that minimum allowable wall thickness remained after surface conditionin The licensee pursued the possibility of chattering and system pressure pulses caused by the manual PMD valves upon imposition of reverse flow and large pressure drops across the valve. Bechtel was asked to develop a dynamic analyses model to determine the magnitude of the forces on the line. This included modeling the fill line from the accumulator nozzle to the control valve to determine the forces imposed on the failure location. The licensee contacted the valve manufacturer and other utilities for information on experience with reverse flow through PMD valves. Subsequently, the licensee ran a bench test using a PMD valve on a one inch line to duplicate accumulator line conditions in an attempt to duplicate the chattering that was thought to have occurred. The bench test results showed chattering and onset of failure of the fill line at a flow rate
. _ _ _ _ _ . _ _ .
.
.
greater than would be expected through the sample lines and less than would be expected through the fill lines. Inspection of a sampling of PMD valves and control valves on the accumulator fill and sample l lines showed no indication of chattering except for the A accumulato Results of the licensee's dynamic analysis of the accumulator fill l line were reviewed. A thermal hydraulic analysis model of the piping I between the A and D accumulators was developed, and computer analysis runs indicated that significant pressure pulses and forces were generated due to the closure of the PMD valve when subjected to back j flow conditions. Sensitivity analyses were performed to determine I the effect of PMD valve closure time, sequence of control valve operations, and fill line flow rate. The analyses results indicated that reverse flow through the PMD valve resulted in. fluid forces of sufficient magnitude to have caused the low cycle fatigue failures that were experienced. The analyses also indicated that calculated piping stress levels under normal conditions were well within the allowable value After the first failure of the fill line, MR 87-2922 was prepared ,
which provided for retrieving portions of the failed piping on both sides of the fracture for metallurgical examination, as well as the installation of replacement piping. The licensee's metallurgical examination of the failed portions from both failures was documented in report ASD 2806 87M, dated June 1, 1987. The examination concluded that both failures were a result of low cycle, high stress fatigue cracking. The examination revealed no metallurgical or chemistry related causes whicn contributed to the failure Examination of the heat affected zone's grain boundaries and microstructure did not show indication of excessive welding hea The two failures were determined to have the same failure mode based on an examination of the location of the cracks, crack progression, and fracture surfaces characteristic The inspectors verified both failed pipes met applicable material specifications. For the first failure, a review of the material test report verified that pipe was ASME A312, Type 304 material. For the second failure, the inspectors reviewed the applicable storeroom material issue sheet, receipt inspection report, purchase order package and material test certificate and verified the pipe was of ASME A312, Type 316 material. The design material specification requires either ASTM A312, Type 304 or Type 31 The licensee's evaluation included a review of other plant systems to determine susceptibility to failures from back flow through PMD {
valves. All applications of these valves were reviewed, and about thirty instances were identified which had potential for back flow conditions. Although most had minimal expected flowrates of less i than 10 gpm, the licensee planned to prohibit back flow through these I valves until further evaluation was complet Based on the inspection described above and a review of the licensee's evaluation, it appears that the licensee has identified l
l l
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ - _ _
_ _
- -. __ . _ _ _ - - - _ - _ _ _ _ - - _ - _ - _ _ _ _ - - _ _ _ - _ _ _ _ _ _ - _ - _ . _ _ _ _ _ . . - - _ _ - - _ _ . - _ _ _
j i
, . .
i
!
'
the root cause, developed a technically strong explanation for the failure. occurrence and has taken actions to assure that similar -{
failures will not occur. . The licensee's evaluation as discussed- 1 above included dynamic analyses, metallurgical examinations and bench
' flow testing. Failure'_.to-obtain a deviation from Trojan operating procedures and failure to establish adequate controls using QC hold tags or' danger and caution tags as discussed in inspection report 87-18 will continue to be followed as open items 87-18-02 and 87-18-0 !
l Main Steam Line Support i Upon completion of functional testing of. hydraulic snubber EBB-1-1-SS-81 on main steam line "B", a visual inspection of the associated support identified separation between the grout and
' baseplate and the grout and bioshield wall. Nonconformance Report NCR 87-214 was written for the observed condition. Inspection.of the corresponding hydraulic snubber supports on the other three main-steam lines showed similar grout separation. As part of the evaluation of NCR 87-214, design load demands were compared to support capacities- Preliminary evaluations indicated that dynami .
loads for a turbine trip transient as indicated on the SS-81 pipe-support detail were two to three times greater than the support allowable anchorage capacities. ' Event Report 87-108 was initiated to
-
evaluate the apparent design discrepanc The licensee's corrective actions included a design review of all supports designed by the group within the Architect-Engineer's organization that was responsible for SS-81; a review of the dynamic-load analyses for all safety-related supports; and field inspections of main steam line supports. For the main steam system, the review of the~ dynamic load analyses identified seven supports as needing modifications to restore desired design margins. Field inspections identified an additional three supports for modification. The modifications are being performed under Request for Design Change 86-001. The field inspections identified an additional thirteen supports which required minor adjustments to clamps, shim packs and hanger spring cans'.
The results'of the field inspections were verified by the inspectors as discussed in paragraph 5. The review of support design and dynamic load calculations is being performed by NRR. A preliminary ,
review of the ' dynamic load calculations resulted in several concerns
'
and a July 9,1987, letter to the licensee requesting information pursuant to 10 CFR 50.54 (f) to provide assurance that the original
,
design of piping and. supports in various safety-related systems, including the main steam system, meet the licensing design base The licensee responded in letters dated July 10 and July 15, 198 The resolution of these concerns, as well as operability concerns of the as-found condition of the main steam system will be addressed =in the evaluation of Event Report 87-108, and will be followed as an
!
open item (50-344/87-24-02).
No violations of NRC requirements or deviations were identified.
w __ _ ____ _
. . _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ _ - . _ _ - _ _ _ - - _
l
.
-
10 Steam and Feed System Pipe Wall Thinning (1986 Surry Event Follow-up) ,
As followup to the December 1986 Surry feedline rupture and planned 1987 )
Trojan outage activities, the inspectors examined the licensee's program i for determining wall thickness of piping subject to erosion / corrosio The inspectors concluded the licensee's program accomplished the j following: i I
-
Identified piping experiencing accelerated wall thinning due to I erosion / corrosio Appropriately and correctly established repair and replacement criteria for piping experiencing accelerated wea Was maintained current with industry practices. Additionally, the licensee attended-the Surry event lessons learned symposium attended a training session on the EPRI CHEC Program, and is planning to implement the EPRI CHEC Progra 'The inspectors examined the licensee's response to INP0 SER's 1-87 and 6-87 and NRC ins 86-106, 86-106 Supplement 1 and 87-19. The licensee through various internal memorandums identified the need to examine piping with moderate flow velocity; however, these examinations were not included in the revised 1987 outage UT program to identify wall thinning. They were added when unexpected erosion was identified in the feedpump discharge piping. Additionally, the licensee identified safety related !
components whose function could be compromised if a failure of the feed piping were to occur. This analysis will be conducted following the 1987 i outag !
The inspectors made the following observations while evaluating the licensee's program for determining wall thinning:
-
In evaluating 1985 wall thinning data, the licensee, without documenting departure from accepted engineering practice, non-conservatively based wall thinning analysis on operating pressure vice design pressure. The licensee felt justified in their actions since the Code is generally conservativ In evaluating 1986 wall thinning data, the licensee failed to identify, due to an individual's oversight, a portion of the main steam system piping being less than minimum well thicknes The 1986 wall thinning data analysis of the 30" feedwater header was nonconservative because wall thickness values for 24" pipe vice 30" pipe were use l
-
Plant Engineering Procedure (PEP) 30-9, Rev. O dated 6/26/86, l Secondary Piping Erosion / Corrosion Monitoring Program did not
! establish detailed criterit for establishing sample selectio In spite of these errors and potential deficiencies, the 1987 Outage program for determining wall thinning eventually identified sections of
-_ __-
_ _ _ _ - _ __ _ _ _ _
_ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ - _ -_ . _ _ _ _ _ - _ _ .
)
...
-
feedwater piping that were experiencing substantial unexpecte erosion / corrosion. The licensee has committed as a result of their findings during the 1987 outage, to take action to implement program enhancements such as upgrading PEP 30-9. Additionally, during the 1987 outage,.the licensee repaired or replaced all safety and non-safety piping and welds that were less than minimum wall thickness or projected to be less than minimum wall thickness prior to the 1988 outag Due to the licensee's thorough ultrasonic testing (UT) of feedwater piping after detecting unexpected erosion / corrosion at the feed pump discharge piping, sections of piping previously predicted by recent industry
' criteria not to be vulnerable to accelerated erosion / corrosion were foun As a result of the licensee's. findings, further industry examination of erosion / corrosion effects on carbon steel piping is being pursued. NRR has the lead on the plant specific and generic aspects on this topi As part of the, inspection, the inspector observed in-process welding being performed on Weld No. P25884 of the "D" Feedwater lin The welding at
'this joint, a pipe-to-elbow connection, was examined for welding
' technique, weld joint geometry, weld type and identification, correct j filler material and proper filler metal control. The inspector also visually examined the completed weld. joints performed on several 90 elbows of the "A" and "C" feedwater lines. These were examined for size, shape, surface condition, arc strikes, weld spatter, and surface defect All weld activities were in compliance with applicable procedures and codes. The inspector noted that each section of pipe welded, or to be welded, was properly identified, which allowed the inspector to identify the purchase order (P0 No. 2245), and to review the applicable CMTR The inspector observed the storage of welding materials utilized in the welding operations. All filler material located in holding ovens and in opened containers were correctly identified. Each holding oven contained one classification of electrode, and were calibrated and operating within the required temperature rang No violations of NRC requirements or deviations were identfie . Quality Hotline On July 14, 1986, the Quality Hotline was implemented via Nuclear j Department Procedure (NDP) 600-4. The PGE Quality Hotline was modeled after the Arizona Public Service Quality Hotline. The Quality Hotline, via direct phone access to the Vice President Nuclear, provides the )
employee the opportunity to identify quality concerns to the highest '
levels of corporate management. Employee awareness of the Quality Hotline is achieved through General Employee Training and Quality liotline poster Dispositioning of employee concerns made via the hotline has been within the guidelines established in NDP-600-4. In all cases the employee quality concerns identified areas where clarification or improvements were warrante !
__ _ - _ _ - _ _ - _
,
. 12
.
The licensee attributes low usage of the Quality Hotline to increased employee utilization of the other quality reporting systems (Event Reports, Nonconformance Reports and Nonconforming Activity Reports)
and effectively managing employee concerns at all supervisory and management level No violations of HRC requirements or deviations were identifie . Training of Contract Quality Control (OC) Personnal .
The inspector examined the training records of the QC contract personnel employed by the licensee during the 1987 refueling outage. The training 1 records thoroughly documented the training received by the contract personnel. Training required for temporary QC personnel is delineated in Quality Control Procedure QCP-25, Revision 1. Contract personnel received the training required by procedure QCP-25, Revision 1. The training delineated in QCP-25 requires knowledge of various plant Administrative, Nuclear Department and Quality Control Procedures. In addition NRC fi Inspection Report No. 50-344/86-24 is part of required reading serving as lessons learned. Following completion of all QCP-25 requirements an examination is administered. If the minimum grade is not achieved, the temporary QC person receives retraining and is again examined. The inspectors noted only one examination was generated for each disciplin The readministered examination as a result of a failure was the same as the initial examination. The licensee committed to changing this practice for all future temporary QC personne No violations of NRC requirements or deviations were identifie . Exit Interview The inspectors met with the licensee representatives denoted in paragraph 1 on July 31, 1987, and sunmarized the scope and findings of the s inspection activitie ,