Category:INSPECTION REPORT
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site ML20202C2111999-01-21021 January 1999 Notice of Violation from Insp on 971207-10.Violation Noted: Licensee Did Not Perform Survey to Assure Compliance with 10CFR20.1902(d) IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning ML20199F0291998-01-15015 January 1998 Notice of Violation from Insp on 971201-03.Violation Noted: Licensee Failed to Ensure Adequate Survey of Certain Contaminated Tools IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl ML20210S7131997-09-0909 September 1997 Notice of Violation from Insp on 970721-24.Violation Noted: from 960923-970515,licensee Failed to Conduct Surveys Adequate to Evaluate Quantity of Radioactive Matl Released from Radiological Controlled Area IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program ML20135B7491997-02-25025 February 1997 Notice of Violation from Insp on 970204-06.Violation Noted: Licensee Had Not Audited Annual Radiological Environmental Report TS 6.9.1.5.1 Since 890519 IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept ML20059A1421993-12-15015 December 1993 Notice of Violation from Insp on 930930-1112.Violation Noted:Detailed Construction Package 1 Associated W/Request for Design Change 78-103,installed in May 1980,did Not Correctly Translate Design Basis Into Applicable Procedures IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items PNO-V-93-002, on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased1993-01-13013 January 1993 PNO-V-93-002:on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items ML20127E9461993-01-0808 January 1993 Notice of Violation from Insp on 921027-1207.Violation Noted:Licensees Corrective Actions Not Effective in That,On 921112 & 15,access Doors to Plant Issue Warehouse Not Controlled by Authorized Personnel PNO-V-93-001, on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media1993-01-0404 January 1993 PNO-V-93-001:on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification PNO-V-92-038, on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety1992-12-0808 December 1992 PNO-V-92-038:on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart1992-12-0101 December 1992 PNO-V-92-037:on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart ML20126E9101992-11-25025 November 1992 Notice of Violation from Insp on 920915-1026.Violation Noted:Supervisor Informed of Receipt of a Nonconforming Component,Chlorine Detector & Did Not Initiate an Ncr ML20126E9131992-11-25025 November 1992 Notice of Deviation from Insp on 920915-1026.Deviation Noted:Containment Air Locks Not Tested Using Pressure Decay Method IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities PNO-V-92-004, on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 9202271992-02-25025 February 1992 PNO-V-92-004:on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 920227 IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification PNO-V-91-002, on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable1991-03-0505 March 1991 PNO-V-91-002:on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable ML20062F9301990-11-0808 November 1990 Notice of Violation from Insp on 900902-1006.Violation Noted:Temp of Train B Component Cooling Water Pump (ASME Code Class 3 Pump) Taken W/Instrument W/Scale More than Three Times Ref Value of Bearing Temp PNO-V-90-045, State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference1990-11-0707 November 1990 PNO-V-90-045:State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference 1999-09-09
[Table view] |
Inspection Report - Trojan - 1999002 |
---|
|
|
Text
.
.
ENCLOSUR U.S. NUCLEAR REGULATORY COMMISSION :
REGION IV
Docket No.: 50-344 License No.: NPF-1 Report No.: 50-344/99-02 Licensee: Portland General Electric Company Facility: Trojan Nuclear Plant Location: 21 S. W. Salmon Street, TB-17 Portland, Oregon Dates: March 29 through April 1,1999 Inspector: Dennis W. Schaefer, Physical Security Specialist Plant Support Branch Approved By: D. Blair Spitzberg, Ph. D., Chief Fuel Cycle and Decommissioning Branch Attachment: SupplementalInformation
.DR D [
.
~~
,
,
.
.
s
-
.
2- -
EXECUTIVE SUMMARY - .
. Trojan Nuclear Plant l NRC Inspection Report 50-344/99-02 ,.
~
This was an announced inspection of the licensee's physical security program. ' The areas inspected included access authorization, alarm station and communications, access' control of .-
personnel and packages, testing and maintenance, protected area barriers and detection aidsf assessment aids, compensatory. measures, security system power supply, security program :
plans and procedures, security event log, personnel training and qualitication, management:
support, staffing' levels, and security program audit.- During this inspection, the reactor was shut down and defuele Plant Support
- Overall, performance in the security program was very good. Effective alarm station :
and security radio communication systems were maintained. A thorough program for searching , rsonnel and packages entering the protected area was maintained. The testing and maintenance of security equipment were completed in a timely manner and -
were properly documented. A very good protected area barrier and detection system
_
was in place that would provide delay and detection of individuals attempting unauthorized entry. Additionally, the protected area barrier and detection system effectively limited access to only authorized personnel. Assessment aids provided ver good assessment and produced a clear image on monitors in the security alarm statio The compensatory measures program was effectively implemented. The security backup power supply system performed very well. - A good lock and key control program was maintained and implemented. Security plan changes were submitted in accordance with NRC requirements, and the changes had not decreased the effectiveness of the :
plans. A properly maintained records and reports program was in place. The security staff was correctly reporting security events. Security training was conducted in accordance with the security training plan and procedures. Management support for the licensee's security p ogram was excellent. On-shift security staffing of armed security officers was properl; maintained. Audits of the security, fitness-for-duty, and access authorization progran Yd been completed every 12 months. These audits were performance based, and the audits overall quality was excellent (Sections S1.2, S1.3, S2.1, S2.2, S2.3, S2.4, S2.5, S2.6, S3.1, S3.2, SS.1, S6.1, S6.2, and S7.1).
- Performance in the access authorization program was very good. An effective access -
authorization program was established to grant individuals unescorted access to the industrial and protected areas (Section S1.1).
4 A very good fitness-for-duty program was in place (Section S8.1).
y
,
3_':N.',+
-
y i
' -
g .
.
.
3-Report Details IV. Plant Support S1 Conduct of Security and Safeguards Activities S Access Authorization Inspection Scope (81700)
The access authorization program was inspected to determine compliance with the requirements of 10 CFR 73.56, the security plan, and Regulatory Guide 5.66. The areas inspected included the review of seven background investigation files for individuals presently granted unescorted access. The inspector reviewed records and conducted interviews to determine the adequacy of the program. The inspector also reviewed information concerning the licensee's verification of identity, employment history, educational history, credit history, criminal history, military service, and the character and reputation of the applicants before granting individuals unescorted access to the protected are Observations and Findinas Background investigation screening files were complete and thorough. Personnel administering the program performed their duties in an excellent manner. Through a review of the licensee's policies and procedures, the inspector determined that the access authorization program contained specific guidance necessary to implement the ,
progra Conclusions Performance in the access authorization area was very good. An effective access authorization program was established to grant individuals unescorted access to the industrial and protected area S1.2 Alarm Station and Communications Insoection Scope (81700)
The alarm station and the security communication capabiliti,es were inspected to determine compliance with the requirements of the security plan. The areas inspected included the requirements and capabilities of the alarm station, protection of the alarm station, systems security, operability of the radio and the telephone systems, and the capability to effectively communicate with the local law enforcement agencies through both communication system .
"
.,.
,
,
L
-
,
?.4 Observations and Findinos :
Through observations and interviews, the inspector determined that the central alarm i station located in the Access Control Facility was equipped with appropriate alarm, .
surveillance, and communication capability.- The alarm station was continually manned by an alarm station operator whose duties did not interfere with the execution of -
assessment and response functions. The inspector determined that the alarm station ;
operators were alert,'well trained, capable of maintaining continuous communicationf with each security officer on duty, and also capable of calling for assistance from_ the; local law enforcement authority._ The inspector. verified that the licensee had effective radio and telephone systems capable of meeting communication requirements.iThe licensee maintained an adequate number of portable radios for use by members of the -
security organization. Communication checks with the local law enforcement authority were conducted at least once each 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ; Conclusions '
An effective alarm station ~and security radio communication system was maintained.'
Alarm station operators were alert and well trained. An adequate number of portable ,
radios were available for members of the security organizatio S1.3 Erotected Area Access Control of Personnel. Packaaes. and Vehicign insoection Scope (81700)
The access control program for personnel and packages was inspected to determine compliance with the requirements of the security plan. (Note: It is not possible for vehicles to enter the protected area.) . Observations and Findinas Through observations and interviews, the inspector determined that upon entering the industrial area, authorized persons inserted their security photo identification key card into a biometric (hand geometry) card reader system. - Persons not authorized a key card were escorted within the industrial are Additionally, through observations, the inspactor determined that personnel access to -
the protected area was effectively controlled by a separate security photo identification key card. Prior to entering the protected area, authorized personnel exchanged their industrial area key card for a protected area key card. The inspector verified that the licensee's search program for firearms, explosives, incendiary devices, and other ;
_
unauthorized. material met the requirements of the security plan. The fixed metal -
detector,' explosive detector, and X-ray machine at the entrance to_the fuel building ;
, operated in an; effective manner. Further, the inspector verified that unescorted access :
Lwas limited to authorized personnel;
~
_,
a is I
rw
"
-5-In addition to the protected area at the spent fuel building, the licensee also controlled access into the control room. Authorized personnel utilized their industrial area security photo identification key card to access this area. Conclusions A thorough program for searching personnel and packages entering the protected area was maintained.
S2 Status of Security Facilities and Equipment S Testina and Maintenance Inspection Scope (81700)
The testing and maintenance program was reviewed to determine compliance with the requirements of the security plan. Observations and Findinas Thro 0gh interviews with security officers and supervisors, the inspector determined that repairs to security equipment were completed in a timely manner. Through review of testing records, the inspector verified that security equipment and tamper alarms were performance tested as required by the securdy plan. All equipment performed as designed. Conclusions The testing and maintenance of security equipment were completed in a timely manner and were properly documented.
S Protected Area Barrier anci Detection Aids S2.2 Protected Area Barrier and Detection Aids Insoection Scope The protected area physical barriers and detection aids were inspected to determine compliance with the physical security plan. The areas inspected included the features of the protected area barrier and the design and capabilities of the detection aids syste (Note: The licensee had no vital areas or vital equipment as defined in 10 CFR 73.2.) Observations and Findinas Through observations, the inspector determined that doors in the protected area (the fuel storage building) barrier were locked and alarmed, and the doors were installed and maintained as described in the physical security plan. The inspector also determined
'
.
6-that the protected area barrier provided penetration resistance to both forced and surreptitious entry and was adequate to ensure delay of a potential adversar The inspector observed the licensee perform functional tests of locked and alarmed .
protected area doors. All attempts to intrude into the protected area were detected, and all alarms annunciated in a continuously manned alarm station. The inspector verified that the licensee's weekly tests of the protected area barrier were performance based to ensure that system failures were discovered and correcte Conclusion A very good protected area barrier and detection system were in place that would'
provide delay and detection to individuals attempting unauthorized entry. Additionally, the protected area barrier and detection system effectively limited access to only authorized personne S2.3 Assessment Aids Inspection Scope (81700)
The assessment aids were inspected to determine compliance with the physical security plan. The areas inspected included the closed-circuit television monitors located in the alarm station Observations and Findinas The inspector observed the assessment aids and determined that the system was effective. Through observations, the inspector verified that the closed-circuit television cameras were properly positioned and that each closed-circuit television camera produced a c' ear image on a monitor in the security alarm station. Through interviews, the inspector determined that prompt maintenance support was provided to ensure that system problems were corrected in a timely manne Conclusions Assessment aids provided very good assessment and produced a clear image on monitors in the security alarm statio S2.4 Compensatory Measures Inspection Scope (81700)
~
The compensatory measures were inspected to determine compliance with the requirements of the physical security plan. The areas inspected included deployment of compensatory measures and the effectiveness of those measure . .
.-
-7- Observations and Findinas Through interviews and a review of the licensee's quick reaction lists, the inspector confirmed that the licensee deployed compensatory measures in a manner consistent with the requirements in t?. .. physical security plan. Through interviews, the inspector determined that the securit, oersonnel available for assignment to compensatory security posts were properly trained for those dutie Conclusions The compensatory measures program was effectively implemented. Security personnel
, were well trained on program requirert.ent S Security System Power Supolv Inspection Scope (81700)
The security system power supply was inspected to determine compliance with the physical security pla Observations and Findinas The security plan requires that sufficient backup power for c specific period of time be provided to the security computet, aiarm system, and the radio communications syste The licensee has provided this backup power through multiple uninterruptible power supply (UPS) systems. During the inspection, the licensee conducted load testing of several of its UPS systems. These systems performed as designe Conclusions The security backup power supply system performed very wel S2.6 Security Locks. Kevn and Combinations Insoection Scope (81700)
The licensee's locks, keys, and cor'ibinations were inspected to aetermine compliance with the physical security plan, Observations and Findinas Through a review of lock and key procedures and records, the inspector determined that inventories were completed as required. The records indicated that the locks and keys were rotated annually, or changed when employees who had access to security locks
. and keys were terminated. Security of the additional sets of lock cores and keys was effective in preventing compromise. Records of keys, locks, core sets, and all changes were being maintained.
L -
_
< -8- Conclusion A good lock and key control program was maintained and implemente S3 Security and Safeguarde Procedures and Documentation S Security Procram Plans and Procedures Inspection Scope (81700)
The licensee's physical security plan for long-term defueled condition, amendment 51, dated November 10,1998, and implementing procedures were inspected to determine compliance with the requirements of 10 CFR 50.54(p),10 CFR 50.90, and 10 CFR 73.55(b)(3). Observations and Findinas The inspector determined from a review of security plans and procedures and interviews with licensee security personnel that changes to the licensee's NRC-approved security, contingency, and training and qualification plans did not decrease the effectiveness of the respective plans. Plan changes were submitted in accordance with NRC requirements. The inspector determined that the licensee maintained an effective management system for the development and administration of procedures and verified that changes to the procedures did not reduce the effectiveness of the licensee's security progra Conclusions Security plan changes were submitted in accordance with NRC requirements, and the changes had not decreased the effectiveness of the plans. Security procedures were consistent with the security plan S3.2 Security Event Loas Insoection Scope (81700)
The safeguards event logs and security incident reports were inspected to determine l
compliance with the requirements of 10 CFR 73.71(b) and (c), and the physical security plan. The inspector reviewed the safeguards event logs from March 1998 to March 5,~
199 Observations and Findinas- )
~!
The inspector determined that tha licensee conformed to the regulatory requirements i'
regarding the reporting of security events. The necessary records were available for review and were maintained for the time required by regulation !
c
f, *
.
9 Conclusions A properly maintained records and reports program was in place. The security staff was correctly reporting security event SS Security and Safeguards Staff Training and Qualification
'
S Personnel Trainina and Qualification Inspectign Scope (81700) -
The licensee's security training and qualification program was inspected to determine compliance with the requirements of the training and qualification pla Observations and Findings The inspector observed security officers during the performance of their duties. The observed security officers demonstrated good knowledge of the procedural requirements for the task they were performin The security organization conducted all required training in accordance with its approved security, training, and contingency plans. The inspector confirmed, by a review of the composite security training records, that the required training was conducted every 12 months. The inspector also reviewed seceity officers' medical recoras and determined that the medical evaluations were conducted every 12 montns as required by the training and qualification pla Conclusions Security training was conducted in accordance with the security training plan and procedures. Security officers demonstrated good knowledge of the procedural requirements for the task they were performing. Medical evaluations were curren S6 Security Organization and Administration S Manaaement Suocort Inspection Scope (81700)
The effectiveness and adequacy of management support for the physical security program were inspecte Obseryations and Findinas The inspect:r interviewed security officers on shifts and determined from their comments
' that licensee management of the security organization was very good. The inspector determined that the security program was implemented by a trained and qualified a .
.
-10-security staff. All members of the security organization had a clear understanding of their duties and responsibilitie Conciusions Management support for the licensee's security program was excellen S Staffina Levels Insocction Scoce (81700)
Staffing levels of the secunty shifts was inspected to determine compliance with the physical security pla Observations and Findinas The inspector determined from discussions with security su'parvisors and reviewing the security shift personnel rosters that there was an adequate number of security officers always available to meet the number specified in the physical security plan, Conclusion On-shift security staffing of armed security officers was properly maintaine S7 Quality Assurance in Security and Safeguards Activities S Security Procram Audit Inspecion Scope (81700)
The annual audits of the physicsl security, titness-for-duty, and access authorization programs were inspected to determine campliance with the requirements of 10 CFR 26.80,10 CFR 50.54(p),10 CFR 73.55(g),10 CFR 73.56, and the security pla Observations and Findinas The inspector reviewed the 1998 security and fitness-for-duty Audit Report No. AP-743, dated May 12,1998. The inspector confirmed that members of the audit team were independent of plant security management. It was determined that audit team personnel were well qualified, and the audits were performance based. The security department promptly resolved allidentified deficiencies / findings. This audit was comprehensive and of excellent qualit The inspector also reviewed Audit Report No. 98-09, dated December 7,1998. This report determined that the licensee's pathology laboratory had properly screened and provided confirmatory testing of all urine specimens for required drugs. Further, the inspector reviewed Audit Report No. 98-06, dated June 15,1998. This report
>.____ _ _ _ - .
.
.
-11-determined that the licensee's access authorization program had been properly .
conducted. Both of these audits were comprehensive and of excellent qualit Conclusions
,
Audits of the security, fitness-for-duty, and access authorization programs had been completed every 12 months. These audits were performance based, and their overall quality was excellen S8 Miscellaneous Security and Safeguards issues (81502 and 92904)
S Fitness-for-Duty (81502) Inspection Scope A partial review of the licensee's fitness-for-duty program was conducted to determine compliance with 10 CFR Part 2 Observations and Findinos The inspector reviewed the fitness-for-duty testing facility and interviewed the individual on-duty at the facility. The inspector determined that the licensee's collection facility was being operated in accordance with 10 CFR Part 26 and that precautions had been taken to insure that all individuals tested could not circumvent the test with false specimens and that all testing was properly conducted and monitored. The licensee's program was very goo Conclusions A very good fitness for-duty program was in plac S8.2 Information Notice 98-35: Threat Assessments and Consideration of Heiahtened Physical Protection Measures information Notice 98-35, dated September 4,1998, was issued to inform licensees of factors considered by the NRC when assessing threats and disseminating that information to the licensees. Additionally, the notice advised licensees about additional physical protection measures that should be considered for specific threat condition The notice discussed threat levels and appropriate response levels in an effort to avoid any misunderstandings concerning NRC threat advisories and to facilitate an appropriate and comparable leve of physical protection response throughout the nuclear industr During this inspection, the licensee stated they had recently received tha notice and -
were reviewing it for applicabilit .'
. ..
. 12-S8.3 . Year-2000 Comoliance Testina -
During this inspection, the licensee stated that on March 26,1999, Matrix Systems. In had completed their Y2K (Year-200) testing of the following types of security systa equipment installed at the Trojan Nuclear Plant:
- Controlled Access Test Readers (MX 540, MS 570, MS 125 Input / Output .
Reader, and the Biometrics Hand Reader)
As a result of testing, Matrix Systems, Inc., determined that all equipment, except the -
LAN Workplace 5.0 for Windows, was Y2K compliant. Matrix Systems Inc., provided the licensee a Y2K update disk for this LAN Workplace. The licensee's installation of this disk will make the LAN Workplace 5.0 compliant with Y2K concerns. The licensee intends to install this disk prior to July 199 S Information Notice 99-08: Urine Specimen Adulteration Information Notice 99-08: " Urine Specimen Adulteration," dated March 26,1999, was issued to remind licensees of a recent attempt by an employee at a nuclear power plant to circumvent fi'. ness-for-duty (FFD) testing. During pre-access FFD testing, a contract employee unsuccessfully attempted to adulterate his urine. specimen with a commercially available substance containing pyridium chlorochromate. This licensee now requires its contracted HHS-certified laboratory to test for adulterants in all specimens that it forwards for confirmation. T his infoimation notice also reminded licensees of 10 CFR 26.24 which requires, in part, that chemical testing programs -
provide a means to deter and detect substance abus During this inspection, the licensee stated they had recerdly rec ' % notice and were reviewing it for applicabilit V. Manaaement Meetinos X1 Exit Meeting Summary The inspector presented the inspection results to members of licensee management at the conclusion of the inspection on April 1,1999. The licensee acknowledged the findings presented.
p
'
.
a n d ' .. . . . . . . . . . . .. _ . . . . , . . . . . . .m ,. - . < . _ _ _ . . . . .
,
.
.
ATTACHMENT SUPPLEMENTAL INFORMATION PARTIAL LIST OF PERSONS CONTACTED Licensee S. Quennoz, Vice President of Thermal Operations K. Allison, Project Manager, independent Spent Fuel Storage Installation (ISFSI)
A. Bowman, Radiation Protection C. Brown, Training Specialist J. Burke, Security Watch Supervisor C. Casciato, Licensing K. Cox, Manager, ISFSI L. Dusek, Licensing R. Eder, ISFSI Specialist S. Fallt, Engineer M. Gatlin, Manager, Nuclear Security D. Gildow, Manager, Decommissioning Planning (ISFSI Project Manager)
M. Lackey, General Manager, Engineering / Decommissioning R. Magnuson, Security Supervisor, Access Authorization and Fitness-for Duty T. Meek, Manager, Radiation Protection J. Mihelich, Manager, Engineering D. Nordstrom, General Manager, Technical Functions and Plant Support J. Perrin, Shift Manager, Operations L. Rocha, Health Physics Engineer G. Shoemaker, Security Supervisor S. Schneider, Manager, Operations C. Storms, ISFSI Specialist J. Viagerud, Manager, Maintenance J. Westvold, Manager Nuclear Oversight G. Zimmerman, Licensing Specialist Others A. Diess, Oregon Office of Energy D. Howard, Licensing Engineer, RIO Technical Senbs D. March, Auditor, Duke Engineering C. Steohenson, Licensing Engineer, RIO Technical Services N_uclear Reaulatory Commission H. Gray, Region I T. Kobetz, NMSS
/
- - . _
0'
.
-2-LIST OF INSPECTION PROCEDURES USED IP 81700 Physical Security Program for Power Reactors IP 92700 Onsite Followup of Written Reports of Non-Routine Events at Power Reactor Facilities (Information Notice)
LIST OF ITEMS OPENED CLOSED AND DISCUSSED ltems Ooen None items Closed
'
None Items Discussed Information Notice 98-35: Threat Assessments and Consideration of Heightened Physical Protection Measures information Notice 99-08: brine Specimen Adulteration LIST OF DORUMENTATION REVIEWED Portland General Electric Audit 98-09 of Dy,iacare Laboratory of Pathology, dated December 7, 1998 Port!and General Electric Audit 98-06 of Bailey, Hinchy, Downs and Associates, Inc. (access authorization), dated June 15,1996 '
l l'
Portland General Electric Audit AP-743 of Security and Fitness-for-Duty, dated May 12,1998 Security Event Logs for the period March 1,1998, through March 5,1999 !
Security training and quaafication records on five security officers i
Annual medical qualification records on 14 security officers Trojan Plant Procedure,21-1," Security Operations Administration," Revision 4 Trojan Plant Procedurc 21-4, " Security Operations F.quipment," Revision 4 Trojan Plant Procedure 21-8, Security Oparations Access Control," Revision 8 i
, . . .
s: 1
.
-3-
- Trojan Plant Procedure 21-12, " Security Screening for Access Authorization," Revision 5 Trojan Plant Procedure 23-3, "Trojnn Fitness-for-Duty Program," Revision 4 4 Trojan Security Plan'(Defueled Condition), Revision 51, dated November 10,1998 -
. Quarterly UPS Testing Records for the period of June 199 through March 199 Annual Tamper Switch Test for security system records dated November 24,1998 '
Weekly Biometric Hand Geometry Reader Testing Records for the period of January through r March 1999 Weekly Door Test Records for the period of January through March 199 I