Category:INSPECTION REPORT
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification IR 05000344/19900291990-11-0505 November 1990 Insp Rept 50-344/90-29 on 900902-1006.Violations Noted.Major Areas Inspected:Operational Safety Verification & Maint IR 05000344/19900201990-10-12012 October 1990 Revised Section 1, Persons Contacted, to Insp Rept 50-344/90-20 IR 05000344/19900251990-09-18018 September 1990 Insp Rept 50-344/90-25 on 900820-24.No Violations Noted. Major Areas Inspected:Inspector Followup Items,Lers & Gaseous Radwaste Sys IR 05000344/19900261990-09-0505 September 1990 Partially Withheld Enforcement Conference Rept 50-344/90-26 on 900830 (Ref 10CFR2.790).Major Areas Discussed: Description of Violation Associated w/900719-0817 Security Insp,Nrc Concerns & Corrective Action Planned & Implemented ML20056B2531990-08-20020 August 1990 Partially Withheld Security Insp Rept 50-344/90-23 on 900719-0817 (Ref 10CFR2.790).Violation Noted.Major Areas Inspected:Access Control of Personnel & Packages & Entry of Unauthorized Firearm Into Plant Protected Area ML20059C1991990-08-16016 August 1990 Insp Rept 50-344/90-21 on 900609-0721.Violation Noted Re Inattentive Fire Watch.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance,Event Followup,Sys Engineering & Open Item Followup IR 05000344/19900221990-07-20020 July 1990 Mgt Meeting Insp Rept 50-344/90-22 on 900615.Major Areas Discussed:Results of NRC SALP for 890101 Through 900331 ML20059A4051990-07-20020 July 1990 Insp Rept 50-344/90-17 on 900604-07.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions in Response to Issues Identified in Insp Rept 50-344/89-12 IR 05000344/19900191990-07-11011 July 1990 Insp Rept 50-344/90-19 on 900611-15.Violations Noted.Major Areas Inspected:Followup of Items of Noncompliance, Occupational Exposure During Outages & Keeping Occupational Exposure ALARA IR 05000344/19900161990-07-0606 July 1990 Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted.Major Areas Inspected:Safety Verification, Refueling Activities,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19900011990-02-12012 February 1990 Mgt Meeting Rept 50-344/90-01 on 900112.Major Areas Discussed:Licensee Improvement Plans for Plant IR 05000344/19890221989-08-31031 August 1989 Enforcement Conference Rept 50-344/89-22 on 890831.No Violation Noted.Major Areas Inspected:Nrc Concerns Developed as Result of Special Insp Rept 50-344/89-19 IR 05000344/19890091989-08-22022 August 1989 Insp Rept 50-344/89-09 on 890522-0609 & 0719-21.Violations Noted.Major Areas Inspected:Effectiveness of Licensee Programs in Identifying & Correcting Design Related Plant Vulnerabilities IR 05000344/19890191989-08-11011 August 1989 Insp Rept 50-344/89-19 on 890712-0808.Violations Noted.Major Areas Inspected:Licensee Actions Following Identification of Debris in Containment Recirculation Sump Prior to & Subsequent to Establishing Containment Integrity ML20245L1471989-08-0303 August 1989 Insp Rept 50-344/89-12 on 890522-0601.Violations Noted.Major Areas Inspected:Review of Licensee NDE Procedures,Nde Records,Radiographs & QA Documentation & NRC NDE Personnel Reperformed Sample NDE on Safety Related Sys & Components ML20245K2741989-08-0303 August 1989 Insp Rept 50-344/89-18 on 890712-14.Violations Noted.Major Areas Inspected:Uresolved Item Re Licensee High Pressure Hydrogen & Nitrogen Storage Facility at Plant & Review of Licensee Implementation of NRC Info Notice 87-020 1999-09-09
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000344/19990061999-09-0909 September 1999 Insp Rept 50-344/99-06 on 990630-0701,21 & 0404-08.No Violations Noted.Major Areas Inspected:Organization,Mgt & Cost Controls & Decommissioning Performance & Status Review, Insp of Transportation Activities & Maint & Surveillance IR 05000344/19990051999-05-0707 May 1999 Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Major Areas Inspected:Decommissioning Performance & Status Review IR 05000344/19990041999-05-0707 May 1999 Insp Repts 50-344/99-04 & 72-0017/99-02 on 0322-25 & 29- 0408.Non-cited Violations Noted.Major Areas Inspected: Licensee Readiness to Load Sf Into Independent ISFSI IR 05000344/19990031999-04-20020 April 1999 Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted.Major Areas Inspected:Site Tours & Review of Licensee Preparedness for ISFSI Operations IR 05000344/19990021999-04-13013 April 1999 Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Station & Communications & Access Control of Personnel & Packages IR 05000344/19980041999-01-21021 January 1999 Insp Repts 50-344/98-04 & 72-0017/98-01 on 981106-07 & 1202-10.Violations Noted.Major Areas Inspected: Decommissioning & Dismantlement Activities at Plant Site ML20202C2111999-01-21021 January 1999 Notice of Violation from Insp on 971207-10.Violation Noted: Licensee Did Not Perform Survey to Assure Compliance with 10CFR20.1902(d) IR 05000344/19982021998-10-30030 October 1998 Insp Rept 50-344/98-202 on 980831-0903.No Violations Noted. Major Areas Inspected:Safety Review Program Re Modular Sf Cooling Sys & Maint Program IR 05000344/19980031998-08-25025 August 1998 Insp Rept 50-344/98-03 on 980727-30.No Violations Noted. Major Areas Inspected:Sfp Safety,Ore,Decommissioning Performance & Status Review,Organization Mgt & Cost Controls & Solid Radioactive Waste & Transport IR 05000344/19980021998-07-0101 July 1998 Insp Rept 50-344/98-02 on 980601-04.No Violations Noted. Major Areas Inspected:Activities Including Spent Fuel Pool Safety,Occupational Radiation Exposure & Decommissioning Performance & Status Review IR 05000344/19980011998-05-22022 May 1998 Insp Rept 50-344/98-01 on 980504-07.No Violations Noted. Major Areas Inspected:Specific Areas of Licensee Physical Security Program IR 05000344/19982011998-04-29029 April 1998 Insp Rept 50-344/98-201 on 980223-26.No Violations Noted. Major Areas Inspected:Safety Review Program & Insp follow- Up ML20199D7511998-01-23023 January 1998 Cover Page for Insp Rept 50-344/97-05 on 971201-03, Inadvertently Omitted in Original Submittal ML20199F0361998-01-23023 January 1998 Insp Rept 50-344/97-05 on 971201-03.Violations Noted.Major Areas Inspected:Status of Dismantlement Activities,Changes to Util Emergency Exercise Plan Implementing Procedures & Decommissioning ML20199F0291998-01-15015 January 1998 Notice of Violation from Insp on 971201-03.Violation Noted: Licensee Failed to Ensure Adequate Survey of Certain Contaminated Tools IR 05000344/19970041997-11-21021 November 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1002.No Violations Noted.Major Areas Inspected:Fuel Debris Processing,Dry Cask Storage & Control of Radioactive Matl. Insp Repts Reissued Due to Omission of Pages 4 & 5 ML20198N3461997-10-31031 October 1997 Insp Repts 50-344/97-04 & 72-0017/97-04 on 970929-1010.No Violations Noted.Major Areas Inspected:Fuel Debris Processing Preparation for Pouring Concrete for Portion of ISFSI Pad & Control & Release of Contaminated Matl ML20210S7131997-09-0909 September 1997 Notice of Violation from Insp on 970721-24.Violation Noted: from 960923-970515,licensee Failed to Conduct Surveys Adequate to Evaluate Quantity of Radioactive Matl Released from Radiological Controlled Area IR 05000344/19970031997-09-0909 September 1997 Insp Repts 50-344/97-03 & 72-0017/97-03 on 970721-24. Violations Noted.Major Areas Inspected:Control of Radioactive Material,Spent Fuel Pool Debris Project,Dry Cask Storage,Spent Fuel Pool & Health Physics Activities IR 05000344/19970021997-05-0606 May 1997 Insp Repts 50-344/97-02 & 72-0017/97-02 on 970414-17.No Violations Noted.Major Areas Inspected:Health Physics, Training Program,Spent Fuel Pool,Independent Spent Fuel Storage Installation & Fuel Building Crane Tests IR 05000344/19970011997-02-25025 February 1997 Insp Repts 50-344/97-01 & 72-0017/97-01 on 970204-06. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program,Compliance W/Ts,Operations Involving Licensee Insp of Spent Fuel & Quality Assurance Program ML20135B7491997-02-25025 February 1997 Notice of Violation from Insp on 970204-06.Violation Noted: Licensee Had Not Audited Annual Radiological Environmental Report TS 6.9.1.5.1 Since 890519 IR 05000344/19960081997-02-13013 February 1997 Insp Repts 50-344/96-08 & 72-0017/96-02 on 961104-07.No Violations Noted.Major Areas Inspected:Decommissioning Activities Related to Ongoing Efforts to Decontaminate Facility & Place Spent Fuel in Storage at ISFSI IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept ML20059A1421993-12-15015 December 1993 Notice of Violation from Insp on 930930-1112.Violation Noted:Detailed Construction Package 1 Associated W/Request for Design Change 78-103,installed in May 1980,did Not Correctly Translate Design Basis Into Applicable Procedures IR 05000344/19930151993-12-14014 December 1993 Insp Rept 50-344/93-15 on 931115-18.No Violations Noted. Major Areas Inspected:Operational Status of EP Program & of Annual EP Exercise IR 05000344/19930141993-12-0606 December 1993 Insp Rept 50-344/93-14 on 930930-1112.Violations Noted.Major Areas Inspected:Resident Insp of Operational Safety Verification,Maintenance,Surveillance & follow-up of Previously Identified Items IR 05000344/19930121993-10-22022 October 1993 Insp Rept 50-344/93-12 on 930817-0929.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930131993-09-24024 September 1993 Insp Rept 50-344/93-13 on 930913-17.No Violations Noted. Major Areas Inspected:Listed Portions of Licensee Physical Security Program IR 05000344/19930111993-09-0303 September 1993 Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint,Surveillance & Followup of Previously Identified Items IR 05000344/19930101993-08-12012 August 1993 Insp Rept 50-344/93-10 on 930706-08.No Violations Noted. Major Areas Inspected:Chemistry & Radiation Protection Program Organization & Staffing & Solid Radwaste Storage IR 05000344/19930081993-06-25025 June 1993 Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint, Emergency Preparedness & Followup of Previously Identified Items PNO-V-93-002, on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased1993-01-13013 January 1993 PNO-V-93-002:on 930113,L Marbet Held Press Conference W/ Portland,Or Media & Alleged That NRC Had Inappropriately Authorized Feb 1992 Restart of Plant.Util Announced on 930104 That Operation of Plant Would Be Permanently Ceased IR 05000344/19920321993-01-0808 January 1993 Insp Rept 50-344/92-32 on 921027-1207.Violations Noted.Major Areas Inspected:Maintenance,Surveillance,Event Followup & Followup of Previously Identified Items ML20127E9461993-01-0808 January 1993 Notice of Violation from Insp on 921027-1207.Violation Noted:Licensees Corrective Actions Not Effective in That,On 921112 & 15,access Doors to Plant Issue Warehouse Not Controlled by Authorized Personnel PNO-V-93-001, on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media1993-01-0404 January 1993 PNO-V-93-001:on 930104,Licensee Notified Region V That Util Board Decided That Plant Will Not Be Restarted & Currently Shutdown for Insp & Repair of SG Tubes.Licensee Notified Media IR 05000344/19920341992-12-31031 December 1992 Meeting Rept 50-344/92-34 on 921201.Areas Discussed:Sg Tube Leak & Licensees Subsequent Insp of SGs IR 05000344/19920331992-12-29029 December 1992 Insp Rept 50-344/92-33 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee Erosion/ Corrosion Program Activities,Including Followup of Previously Identified Items IR 05000344/19920281992-12-21021 December 1992 Insp Rept 50-344/92-28 on 921109-1215.No Violations or Deviations Noted.Major Areas Inspected:Rev 7 to Emergency Plan Implementing Procedure EP-001, Emergency Classification PNO-V-92-038, on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety1992-12-0808 December 1992 PNO-V-92-038:on 921209,B Roberts Plans to Notify News Media of Request of or Energy Facility Siting Council to Hold Hearing on Utility Steam Generator Safety PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart1992-12-0101 December 1992 PNO-V-92-037:on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart ML20126E9101992-11-25025 November 1992 Notice of Violation from Insp on 920915-1026.Violation Noted:Supervisor Informed of Receipt of a Nonconforming Component,Chlorine Detector & Did Not Initiate an Ncr ML20126E9131992-11-25025 November 1992 Notice of Deviation from Insp on 920915-1026.Deviation Noted:Containment Air Locks Not Tested Using Pressure Decay Method IR 05000344/19920301992-11-25025 November 1992 Insp Rept 50-344/92-30 on 920915-1026.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance,Surveillance & Followup of Previously Identified IR 05000344/19920311992-11-10010 November 1992 Insp Rept 50-344/92-31 on 920928-1002.No Violations Noted. Major Areas Inspected:Environ Monitoring,Cr Ventilation & Control of Radwaste Activities PNO-V-92-004, on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 9202271992-02-25025 February 1992 PNO-V-92-004:on 920225,Trojan Power Plant Entered Mode 2 After Extended Outage.Plant Currently Critical at Less than 1 Percent Power & Licensee Conducting Low Power Physics Testing.Tests Expected to Be Completed by 920227 IR 05000344/19910161991-06-0404 June 1991 Insp Rept 50-344/91-16 on 910506-16.No Violations or Deviations Noted.Major Areas Inspected:Proposed Rev 6 to Emergency Procedure (EP)-001, Emergency Classification PNO-V-91-002, on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable1991-03-0505 March 1991 PNO-V-91-002:on 910303,Trojan Declared an Unsual Event & Initiated Plant Shutdown Due to Inability to Meet Requirements of TS 3.8.2.1,which Requires That Four 120 Volts AC Preferred Instrument Busses Be Operable ML20062F9301990-11-0808 November 1990 Notice of Violation from Insp on 900902-1006.Violation Noted:Temp of Train B Component Cooling Water Pump (ASME Code Class 3 Pump) Taken W/Instrument W/Scale More than Three Times Ref Value of Bearing Temp PNO-V-90-045, State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference1990-11-0707 November 1990 PNO-V-90-045:State of or Measure 4 Re Closure of Facility Defeated in 901106 Vote.Util Will Hold News Conference 1999-09-09
[Table view] |
Inspection Report - Trojan - 1999005 |
---|
|
|
Text
..
b ENCLOSURE U.S. NUCLEAR REGULATORY. COMMISSION
REGION IV
Docket No.: .50-344;72 17 License No.: NPF-1; SNM-2509 -
i
- Report No.: 50-344/99-05; 72-17/99-04 Licensee: Portland General Electric Company (PGE)
Facility: Trojan Nuclear Plant l i
Location: 121 S. W. Salmon Street, TB-17 Portland, Oregon
' Dates: April 19 - 22,1999 Inspector: J. V. Everett, Senior Health Physics inspector Fuel Cycle & Decommissioning Branch Division of Nuclear Materials Safety ,
Approved By: D. Blair Spitzberg, Ph.D., Chief Fuel Cycle & Decommissioning Branch Division of Nuclear Materials Safety Attachment: Supplemental Information
l
!
-l
)
9905120369 990507
,
i PDR ADOCK 05000344 '
O PDR ,
w
e .
,
p A
+ -1
_
. EXECUTIVE SUMMARY
- Trojan Nuclear Plant ..
NRC Inspection Report 50-344/99-05; 72-17/99-04 .I
~
Significant progress had been made toward the decommissioning and dismantlement of the Trojan nuclear facility. The reactor vessel removal project took another major step forward with
~
l the lifting of the reactor vessel. The reactor vessel will be lowered from containment in mid May -
. to be transported to Hanford, Washington, by the end of July.-
Preparations continue for the movement of spent fuel from the spent fuel pool to dry cask -
storage at the onsite independent spent fuel storage installation (ISFSI). The first basket is
~
expected to arrive onsite in early May. During modifications to the lifting yoke, cracks were -
~ found under several welds. The lifting yoke is used to lift and move the transfer cask loaded
- with spent fuel. lThe licensee initiated an evaluation of the cracking proble Decommissionina Performance and Status Review
1 A substantial amount of dismantlement work had been completed over the past several months.~ Tours of work areas found radiological controls, fire loading, housekeeping, and general area work conditions to be acceptable (Section 1).
Work relate' d to the lifting of the reactor vessel was observed. Work was being conducted safely related to positioning the vessel for removal from containment in
- mid-May, The reactor vessel weighed approximately 820 tons. Most of the work areas associated with the heavy lift had been decontaminated and covered._ This will simplify the release of the contractor's equipment at the end of the project (Section .1).
Pre-Ooerational Testino of an ISFSI a'
The licensee had performed an extensive inspection of the 780 fuel assemblies to document the status of each assembly. Twenty special failed fuel cans will be needed for dry cask storage of damaged fuel assemblies and fuel debris from the fuel debris processing project (Section 2).
- Procedures for handling unexpected or abnormal events that could occur during the fuel loading process were reviewed and found adequate. Procedures had been developed
.for a' number of situations involving fuel movement in the spent fuel pool, movement of
. the transfer cask, and loss of offsite power (Section 2).
During a modification to the lifting yoke to be used to lift the transfer casket and basket-loaded with spent fuel, cracks were found under several welds. The welds were not part of the structural design of the yoke. The licensee initiated an investigation of the
.
condition (Section 2).'
, +
l
..
!
[ -3-
Self Assessments. Auditino. and Corrective Actions '
-*
Review and acceptance of Revision 22 of the Quality Assurance (QA) Plan was j documented in the Safety Evaluation Report issued with the ISFSI license on March 31, 1999. Acceptance of the OA plan for the 10 CFR Part 72 license meets the requirement for approval of Revision 22 of the OA plan for use under the 10 CFR Part 50 license l (Section 3).
- Activities related to the Independent Review and Audit Committee were reviewed and -
found to comply with the requirements of Technical Specification 5.5.2. (Section 3).
I i
-
!
,
i q
l a
j
.
,
!
l- i n _ ._
I O
.
Report Details
- Summarv of Plant Status Dismantlement work continued to show significent progress. The licensee had removed over 190 per cent of the radioactive equipment and piping in the containment and turbine building and over.70 per cent in the fuel / auxiliary building. Numerous areas posted as contaminated zones -
during the January 1999 inspection had been cleaned and no longer required protective '
clothing for entry. Most large tanks, pumps, motors, and equipment from contaminated areas :
- have been removed from the plan The reactor removal project continued to progress safely. Plans to transport the reactor vessel i to Hanford, Washington, by the end of July,1999, are still on schedule. During this inspection, the reactor vessel was lifted from it's normal location and moved near the roll-up door of the -
containment.' The vessel will be removed from containment in mid-May. When the reactor vessel is removed from the site and the spent fuel is moved to the ISFSI,99 percent of the
'
. radioactive material will be removed from PGE's Part 50 licens Decommissioning Performance and Status Review (71801) Insoection Scooe -
Significant decommissioning work was underway at Trojan related to dismantlement of .
the facility and removal of the reactor vessel. The work activities related to these two major projects were observed to verify activities were being performed safel .2 - . Observation and Findinos-l A tour of the plant was completed to ovaluate general plant conditions.- Fire loading, safety hezards, progress of dismantlement work, contamination control, radiological posting, housekeeping, condition of the spent fuel pool concrete wall, and general area work conditions were observed. A substantial amount of work had been completed concerning removal of piping, equipment, cabling, and attachments to walls. The number of areas posted as radiation area or contaminated area were notably reduced since the January 1999 inspection. Contaminated material stored in work areas was
, also considerably reduced in volume. No fire hazarde safety concerns were identified during the tours. Ventilation systems were operatior . . .ind postings were observed in the appropriate areas. Ste . off pads were properly placed and protective clothing was available in adequate quar :ity for workers. Dismantlement work that had been
- performed around the sput fuel pool wall had not created any degraded structural i conditions that affected ' ye wall or created a new path for water to leak from the poo l The mctor vessel was lifted vertically on April 21,1999 and positioned to be laid on its sidt me following week. The reactor vessel weighed approximately 820 tons. The work activities associated with the lifting of the vessel were observed by the NRC. Work activities were conducted safely. No incidents or unexpected events occurred during the !
lifting process.' Most work areas associated with the equ:pment needed for the reactor I
y
>O-
.
5-lifting had been decontaminated and cleaned. The areas were covered with plastic or other material to reduce the potential for contaminating the lifting equipment and thereby
- reducing the effort to release the material back to the contractor. This also allowed for much of the work to be performed without wearing protective clothing. Radiological levels associated with the lifting effort were low, typically around 1-2 mR/hr. These low radiation levels were due to the shielding placed on the reactor vesse L The vessel will be lowered out of containment onto a transport trailer in mid-March, then barged to Hanford, Washington, for burial at the end of July. A Safety Analysis Report (SAR) had been submitted to the NRC by PGE. The latest version of the Safety Analysis Report was September 23,1998. The Safety Analysis Report provided a detailed description of the plans for removal of the reactor vessel. The Safety Analysis
-
Report was reviewed by the NRC and on October 29,1998, the NRC issued a letter to PGE approving the removal and shipment of the reactor vesse ' Conclusion A substantial amount of dismantlement work had been completed over the past several months. Tours of work areas found radiological controls, fire loading, housekeeping,
' and general area work conditions to be acceptabl Work related to the lifting of the reactor vessel was observed. Work was being
. conducted safely related to pcsitioning the vessel for removal from containment in mid May. Most of the work areas associated with the heavy lift had been decontaminated and covered. This will simplify the release of the contractor's equipment at the end of the projec .-
2 : Pre-Operational Testing of an ISFSI (60854)
2.1: Insoection Scooe The licensee planned to begin fuel loading of spent fuel into casks for storage at the ISFSI beginning in May. This inspection reviewed the effort completed by the licensee to categorize the fuel in accordance with criteria established by the Department of -
Energy for standard and failed fue .
Contingency procedures for unexpected events during the handling of the fuel assemblies were also reviewed; During this inspection, the licensee informed the NRC inspector that an examination of the lifting yoke for the transfer cask had resulted in the discovery of cracks in the bea .2 - Observations and Findinas An ' examination was completed of all fuel assemblies to classify the fuel in accordance with DOE criteria for spent nuclear fuel. Prior to loading the spent fuel into dry cask storages a final inspection will be conducted as the fuel is loaded into the basket. The
,
I
y
.
6-initial evaluation of the fue1 was conducted in January and February,1997. The examinations were conducted using Procedure FHP-15," Irradiated Nuclear Fuel inspection / Classification," Revision 14. The procedure established the process for conducting the examinations and for classifying the fuel. Over 60 video tapes were generated to document the condition of the fuel. Fuel examination consisted of moving the fuel past four undarwater cameras. All 780 spent fuel assemblies were examine The criteria for failed fuel defined in the ISFSI Technical Specifications, Section described damaged fuel as fuel assemblies which can be handled by normal means but
~ have known 'or suspected cladding defects greater than pinhole leaks or hairline cracks or have missing fuel rods that are not replaced with dummy fuel rods. Damaged fuel will be placed in special failed fuel cans inside the basket. The licensee plans to use 20
.
failed fuel cans for damaged fuel and fuel debris from the fuel debris processing project completed in late 199 The licensee also used the subcategories for failed fuel classification defined in DOE Contract DE-CR01-83NE 44406, " Contract for Disposal of Spent Nuclear Fuel and/or High Level Radioactive Waste." Failed fuel was subdivided into three types. Fuel with visual failure or damage was categorized as F 1. Fuel with small defects that could result in radioactive leakage was classified as F-2. Fuel that required encapsulation was categorized as F-3. In the early 1980 time frame, an incident occurred at the Trojan facility in which coolant flow in the reactor vessel jetted through a gap in the baffle plate and damaged a number of fuel assemblies. This problem resulted in several fuel elements being damaged to the point that fuel pellets were dislodged. For some of these damaged fuel assemblies, the good fuel elements were removed and placed into l
.a new bundle'. The failed elements were left in the original bundle and will be placed in a failed fuel can. Eight fuel assemblies met the criteria of the F-1 failed fuel. This 1 included several assemblies having breached and broken fuel elements with fuel pellets lodged in the matrix of the fuel assembly.- All of these fuel assemblies will be placed into failed fuel cans. . In addition, fuel assemblies F05 from the F-2 list and fuel assemblyi ;
A45 will be placed in failed fuel cans. Fuel assembly A45 was not a complete assembl Fuel elements had been removed from A45 and used to fill spaces in other fuel assemblies. < l
<
Seven fuel assemblies were classified as F-2 failed fuel. These had pin hole leaks or -
other defects observed during the visual examination. One had failed a fuel sipping examination and two had failed previous ultrasonic tests. Six of the seven assemblies were structurally intact and will not require special handling or storage. One fuel rod storage rack, FRS1,' consisting of 23 failed or suspected fuel rods taken from damaged ,
fuel assemblies will be stored in a failed fuel can. The remaining failed fuel cans will
, contain fuel debris from the fuel debris processing projec Selected segments of one of the videos recorded by the licensee of the fuel examinations were reviewed during this inspection. The video had good clarity sufficient to verify the adequacy of the visual examinations. The fuel assemblies that were damaged or contained lodged debris were readily recognized. The licensee generated a OA record for each fuel assembly examined using Attachment 2, " Fuel Assembly Inspection Sheet." from Procedure FHP-15. Selected records were reviewed and found J
p q
.
-7 to be complete including the necessary signatures and dates of examination. The records provided the assembly number, classification assigned, associated video tape documenting the visual examination, and specific criteria that the fuel was examined agains Contingency procedures for unexpected events during the handling of the spent fuel assemblies were reviewed. Procedures FHP-13, " Fuel Handling Emergency Procedures," Revision 22; ONI 50-04, " Response to Operational Events," Revision 0; j and FHP-14, " Limitations and Precautions for Handling Fuel Assemblies," Revision 13, l were reviewed.- ' Procedure FHP-13 provided instructions for response to a fuel handling accident or a situation that could lead to fuel damage. The procedure considered fuel j
'
handling accidents including a fuel assembly being dropped or damaged during movement or an object dropped onto a fuel assembly causing damage and abnormal radiation levels. Procedure FHP-14 provided information concerning the construction and limitations of the fuel assemblies that the operator needed to be aware of to safely handle the fuel assemblies. This included information and precautions on vertical and horizontal movement of the fuel assemblies, storage, axial and lateral load limitations, loading of assemblies into the PWR baskets, and spent fuel bridge crane handling operations. For situations involving the failure of the spent fuel bridge crane, the spent fuel assembly would be placed in as safe a configuration as possible, such as over an empty storage cell, and the shift manager notified. The shift manager and engineering would then evaluate the situation and develop a recovery pla Procedure ONI 50-04, " Response to Operational Events," provided information for response to a problem involving an ISFSI component. This included a drop, tipover, or mishandling of an ISFSI component inside the fuel building, failure of the fuel building crane, and loss of offsite powe During the inspection at Trojan, the licensee informed the NRC inspector that cracks
, were discovered in the beams of the lifting yoke to be used to lift the transfer cask from the fuel pool and lower the transfer cask to ground level. The transfer cask is used to move a basket loaded with spent fuel. During a modification of the lifting yoke, weld material was removed from the beam at the location where two small metal pieces, called keepers,'were welded in place to limit the movement of the hooks on the bea Upon removal of the welds and grinding the locations to remove all weld material, an
_
examination of the base metal found cracks in all four locations where welding had been performed to place the keepers onto the beams. The design of the transfer yoke consisted of two beams which hold the two hooks that connect onto the transfer cask trunnions.L There are a total of 8 keepers,2 keepers welded on the outside of each hook -
and 2 keepers welded on the inside of each hook. The welded metal keepers do not provide any structural purpose, but simply limit the movement of the hooks on the beams.~ The licensee issued Corrective Action Report C 99022 identifying the problem with the cracks. The licensee initiated an evaluation of the problem and planned to remove all 8 keepers to determine the extent of cracking. Followup on the yoke
. cracking issue will be conducted upon completion of the licensee's assessment of the
' cracks. This will be tracked as an inspection followup item (IFl 72-13/9904 01).
.
w
, ,
)<
x l
'
, -8-1 Conclusion -
-.The' licensee had performed an extensive inspection of the 780 fuel assemblies to document the status of each assembly. Twenty special failed fuel cans will be needed for dry cask storage of damaged fuel assemblies and fuel debris from the fuel debris processing projec Procedures for handling unexpected or abnormal events that could occur during the fuel
- loading process were reviewed and found adequate., Procedures had been developed
' for a number of situations involving fuel movement in the spent fuel pool, movement of.-
- the transfer cask, and loss of offsite powe During a modification to the lifting yoke to be used to lift the transfer casket and basket loaded with spent fuel, cracks were found under several welds. The welds were not par of the structural design of the yoke. The licensee initiated an investigation of the
' conditio :3 Self-Assessments, Auditing, and Corrective Actions (40801,40500) Insoection Scooe I The licensee submitted their 10 CFR Part 50 QA Plan to the NRC to meet the ;
requirements of 10 CFR 72, Subpart G for the ISFSt. The NRC included the QA Plan 1 in the 10 CFR Part 72 license application revie The activities of the independent review and audit committee were reviewed to evaluate
. the type of issues that were being reviewed by the committee and the level of review being performe .2 - Observation and Findinas On October 9,1995,' the licensee informed the NRC of their intent to apply the Trojan 10 CFR Part 50, Appendix B, OA program to the activities associated with the ISFS Revision 19 of the OA Plan was' submitted to the NRC for review under 10 CFR 72,
. Subpart G. During the review process, Revisions 20,21, and 22 were submitted and reviewed by the NRC. On March 31,1999, the NRC issued License SNM-2509 to PGE i
. for the ISFSI. Issued with the license was the Safety Evaluation Report which accepted ;
Revision 22 of the OA Plan. The acceptance of Revision 22 of the OA Plan is j considered applicable to both 10 CFR Part 72 and 10 CFR Part 50, Appendix '
Technical Specification 5.5.2 established the requirements for the Independent Review
.and Audit Committee. The committee was responsible for reviewing and advising the Plant General Manager on matters related to the safe storage of irradiated fuel. The
- committee was composed of five members. A quorum required attendance of at least three members or their alternatives. Quarterly meetings were require _
,
.'
J
.
a
. ~
Meeting minutes were reviewed for the past 12 months. Meetings were conducted more
' frequently than the required quarterly time period. All meetings were attended by the required minimum quorum. Meeting minutes documented the various activities conducted by the committee and included areas such as review of License Change Application 247, " Trojan Plant License Termination Plan"; License Change Application 246, " Spent Fuel Cask Loading in the Fuel Building-Contingency Fuel Unloading to the, Fuel Pool"; Revision 3 to License Change Application 237, " Spent Fuel
- Cask Loading," audit and surveillance schedules, and repair of a leak on the modular spent fuel pool cooling coil A considerable number of documents were reviewed by the committee including corrective action requests, NRC inspection reports, audits -
conducted by the OA department, license document change requests, NRC information notices, surveillances, and safety evaluation .3 Conclusion Review and acceptance of Revision 22 of the OA Plan was documented in the Safety Evaluation Report issued with the ISFSI license on March 31,1999. Acceptance of the OA Plan for the 10 CFR Part 72 license meets the requirement for approval of Revision 22 of the OA Plan for use under the 10 CFR Part 50 licens Activities related to the Independent Review and Audit Committee were reviewed and found to comply with the requirements of Technical Specification. 5. .
L4 Follow-up on Open items (92701) (Closed) IFl 50-344/9901-01: Movement of Concrete Cask Near the Edae of the ISFSI
- A walkdown of the ISFSI pad was completed. A groove had been cut around the pad of
_
appropriate size to prevent the concrete storage casks from being moving beyond the edge of the pad before the air pads would deflat L 4.2 - (Closed) IFl 50-344/9901-02: Emeroency Suoolies Emergency equipment identified in
~ the emergency plan had been placed in the building on the ISFSI pad and in the access control facility for response to an emergency conditio .3 (Closed) IFl 72-017/9902-01: Deficiencies with Protected Area Barriers and Detection bida The licensee had. modified the detection. system at the location where successful penetration had been achieved through the protected area. Demonstration of an
-
attempted entry was observed and confirmation was received that an alarm had
- occurred at the security alarm station. The detectors that were in continuous alarm during the previous NRC inspection had been repaired and were operational. The modification to the fence gate had been complete l (Closed) IFl 72-017/9902-02
- Deficiency with an Uninterruptible Fower Supolv System A test of the new battery was conducted for the uninterruptible power source that had-not met the required security criteria during the last NRC inspection. The battery exceeded the minimum criteria for providing back-up power, a
v.
l:
P P,
_
g 15' Exit Meeting The inspector presented the irispection results to members of licensee management at the conclu'sion of the inspection on April 22,1999. The licensee acknowledged the findings presented. The licensee identified as proprietary two drawings provided to, or
- reviewed.by, the inspector, which were not discussed in detail in this repor !
.
l
.
f (
_'
f!
,.
l'* ATTACHMENT i
,
PARTIAL LIST OF PERSONS CONTACTED
!
Licensee K. Allison, ISFSI Project Manager A. Bowman, Radiation Protection Supervisor H. Caballero, Industrial Safety J. Cooper, Emergency Planning Engineer L. Dusek, Nuclear Regulatory Affairs Manager T. Meek, Radiation' Protection Manager J. Mehelich, Engineering Manager S. Nichols, Decommissioning Project Manager B. Shoemaker, Security Supervisor C. Storms, ISFSI Specialist G. Zimmerman, Licensing Engineer State of Oreaon A Bless, Resident inspector, Oregon Office of Energy INSPECTION PROCEDURES USED 40500 Effectiveness of Controic in Identifying, Resolving, and Preventing Problems 40801 Self-Assessments, Auditing, and Corrective Actions 60854 Pre-operational Testing of an ISFSI 71801 Decommissioning Performance and Status Review i 92701 Follow-up of Open Items '
,
ITEMS OPENED, CLOSED, AND DISCUSSED:
Ooened 50-344/9905-01 IFl Cracks on the ISFSI Lifting Yoke
' Clgs9d 50-344/9901 01 IFl Movement of Concrete Cask near the Edge of the ISFSI Pad-50-344/9901 02 IFl Emergency Supplies Discussed None I
a
Il:
!
(-
l: 2 LIST OF ACRONYMS
'CFR Code of Federal Regulations FHP Fuel Handling Procedure 1Fl inspection Iollowup item ISFSI Independent Spent Fuel Storage Installation LER Licensee Event Report NRC Nuclear Regulatory Commission ONI Off NormalInstruction PGE' Portland General Electric Company SAR- Safety Analysis Report T. S. 1echnical Specification