Category:INSPECTION REPORT
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20240042024-10-0303 October 2024 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 05000261/2024004 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) IR 05000261/20210042022-01-25025 January 2022 Integrated Inspection Report 050000261/2021004 ML21342A2122021-12-0808 December 2021 Security Baseline Inspection Report 05000261/2021404 IR 05000261/20214032021-11-29029 November 2021 Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20210032021-11-0404 November 2021 Integrated Inspection Report 05000261/2021003 IR 05000261/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000261/2021402 IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) IR 05000261/20210022021-08-0303 August 2021 Integrated Inspection Report 05000261/2021002 IR 05000261/20214012021-07-0808 July 2021 Cyber Security Inspection Report 05000261/2021401 (Public) IR 05000261/20210012021-05-10010 May 2021 Integrated Inspection Report 05000261/2021001 IR 05000261/20210102021-03-22022 March 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 IR 05000261/20200042021-02-0909 February 2021 Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 IR 05000261/20200112020-12-21021 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 ML20351A2682020-12-15015 December 2020 Requalification Program Inspection Notification Letter W Materials List IR 05000261/20200032020-10-30030 October 2020 Integrated Inspection Report 05000261/2020003 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20289A6362020-10-21021 October 2020 Security Inspection Report 05000261/2020420 - Cover Letter 2024-09-11
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000261/19990041999-07-30030 July 1999 Insp Rept 50-261/99-04 on 990523-0703.One Violation of NRC Requirements Occured & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19990031999-06-16016 June 1999 Insp Rept 50-261/99-03 on 990411-0522.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19990021999-05-11011 May 1999 Insp Rept 50-261/99-02 on 990228-0410.One NCV Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19990101999-05-0606 May 1999 Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 & & 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified:Failure to Review & Evaluate Background Info for Persons Granted Unescorted AA IAW 10CFR73.56(b)(3) IR 05000261/19990011999-03-29029 March 1999 Insp Rept 50-261/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980121999-02-12012 February 1999 Insp Rept 50-261/98-12 on 981206-990116.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980131999-01-0808 January 1999 Partially Withheld Insp Rept 50-261/98-13 on 981207-11 (Per 10CFR73.21).No Violations Identified.Major Areas Inspected: Physical Security Program for Power Reactors IR 05000261/19980111998-12-23023 December 1998 Insp Rept 50-261/98-11 on 981025-1205.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980091998-11-23023 November 1998 Insp Rept 50-261/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19980081998-10-0909 October 1998 Insp Rept 50-261/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980061998-07-16016 July 1998 Insp Rept 50-261/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980101998-06-29029 June 1998 Insp Repts 50-261/98-10,50-324/98-12,50-325/98-12 & 50-400/98-12 on 980601-04.No Violation Noted.Major Areas Inspected:Plant Support.Areas Specifically Evaluated,Access Authorization & Fitness for Duty Programs IR 05000261/19980021998-04-27027 April 1998 Insp Rept 50-261/98-02 on 980215-0328.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980041998-03-24024 March 1998 Partially Withheld Insp Rept 50-261/98-04 on 980223-25 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000261/19970141998-02-10010 February 1998 Errata to Insp Rept 50-261/97-14,transmitted on 980202.Typo Was Discovered on Pages 9 & 12 of Rept ML14181A9781998-02-0202 February 1998 Insp Rept 50-261/97-14 on 971123-980103.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML14181A9591997-11-0707 November 1997 Insp Rept 50-261/97-10 on 970831-1011.Violations Noted But Not Cited & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19970081997-08-18018 August 1997 Insp Rept 50-261/97-08 on 970608-0719.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19972011997-08-14014 August 1997 Insp Rept 50-261/97-201 on 970407-0523.No Violations Noted. Major Areas Inspected:Si & AFW Sys & Support Sys ML14181A9331997-07-0707 July 1997 Insp Rept 50-261/97-07 on 970427-0607.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970041997-04-18018 April 1997 Insp Rept 50-261/97-04 on 970209-0322.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970051997-04-18018 April 1997 Insp Rept 50-261/97-05 on 970317-21.No Violations Noted. Major Areas Inspected:Plant Support & Security Program Plans IR 05000261/19970011997-03-24024 March 1997 Pages 1 & 29 to Insp Rept 50-261/97-01 ML14181A8811997-02-28028 February 1997 Insp Repts 50-261/97-02,50-324/97-01 & 50-325/97-01 & 50-400-97-02 on 970113-0206.Violations Noted.Major Areas Inspected:Access Authorization & Fitness for Duty Programs ML14181A8551996-12-16016 December 1996 Insp Rept 50-261/96-12 on 960928-1116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19960081996-08-0101 August 1996 Insp Rept 50-261/96-08 on 960526-0706.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19960071996-06-28028 June 1996 Insp Rept 50-261/96-07 on 960603-14.No Violations Noted. Major Areas Inspected:Integrated Performance Assessment to Development Perspective of Plant Strengths & Weaknesses; Operations,Maint,Engineering,Plant Support,Safety,Security IR 05000261/19960051996-06-24024 June 1996 Insp Rept 50-261/96-05 on 960414-0525.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000261/19960041996-05-10010 May 1996 Insp Rept 50-261/96-04 on 960303-0413.No Violations Noted. Major Areas Inspected:Plant Operations,Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems & Close Out of Items & Fire Protection Program ML14181A8161996-04-23023 April 1996 Insp Rept 50-261/96-03 on 960311-0404.Violations Noted. Major Areas Inspected:Security Program for Power Reactors, Mgt Support,Security Program Plans & Procedures;Safeguards Info,Audits & Security Lighting IR 05000261/19960021996-03-27027 March 1996 Insp Rept 50-261/96-02 on 960121-0302.No Violations Noted. Major Areas Inspected:Plant Operations,Close Out of Open Issues,Maint & Surveillance,Physical Security Program, Internal & External Exposure Controls & Training IR 05000261/19950301996-01-26026 January 1996 Insp Rept 50-261/95-30 on 951126-1231.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Surveillance,Engineering & Plant Support IR 05000261/19950291995-12-20020 December 1995 Insp Rept 50-261/95-29 on 951022-1125.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Function IR 05000261/19950281995-12-14014 December 1995 Insp Rept 50-261/95-28 on 951030-1103.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000261/19950261995-10-0404 October 1995 Insp Rept 50-261/95-26 on 950827-0916.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Functions IR 05000261/19950211995-08-10010 August 1995 Insp Rept 50-261/95-21 on 950618-0715.Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Functions IR 05000261/19950201995-07-10010 July 1995 Insp Rept 50-261/95-20 on Stated Date.No Violations or Deviations Noted.Major Areas Inspected:Licensee Efforts Re Violations & Open Items Noted During SW Operational Performance Insp IR 05000261/19950151995-06-28028 June 1995 Insp Rept 50-261/95-15 on 950530-0602.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Occupational Radiation Protection Program During Extended Outages IR 05000261/19950171995-06-26026 June 1995 Insp Rept 50-261/95-17 on 950605-09.No Violations Noted. Major Areas Inspected:Emergency Operating Procedures & CA for Previously Identified Deficiencies IR 05000261/19950111995-05-0202 May 1995 Insp Rept 50-261/95-11 on 950403-07.No Violations Noted. Major Areas Inspected:Emergency Response Training,Emergency Notifications & Communications & Protective Action Decision Making IR 05000261/19950101995-04-28028 April 1995 Insp Rept 50-261/95-10 on 950327-31.No Violations Noted. Major Areas Inspected:Insp Conducted in Areas of Risked Based Operational Safety Including Control Room Observation & Review of Corrective Action Taken on Previous Insp Items IR 05000205/20030181995-04-17017 April 1995 Insp Rept 50-261/95-06 on 950205-0318.Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Observation,Maint Observation & follow-up IR 05000227/20030031995-04-0909 April 1995 Insp Rept 50-261/95-07 on 950227-0303.Violations Noted. Major Areas Inspected:Design Changes & Plant Mods, Engineering & Technical Support & Follow Up on Previous Insp Findings IR 05000103/20020111995-03-0606 March 1995 Insp Rept 50-261/95-03 on 950103-0211.Noncited Violations Identified.Major Areas Inspected:Plant Operations,Maint Observation,Engineering Evaluation & Plant Support Activities IR 05000261/19950041995-02-24024 February 1995 Insp Rept 50-261/95-04 on 950123-27.No Violations or Deviations Noted.Major Areas Inspected:Semiannual Radiological Effluent Release Rept,Radiological Environmental Program & Process & Effluent Monitoring IR 05000261/19940281995-01-20020 January 1995 Insp Rept 50-261/94-28 on 941204-950102.Violations Noted. Major Areas Inspected:Operational Safety Verification, Maintenance Observation,Plant Safety Review Committee Activities & Followup IR 05000261/19940251994-10-13013 October 1994 Insp Rept 50-261/94-25 on 940912-16.No Violations or Deviations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities ML14181A6151994-10-0505 October 1994 Insp Rept 50-261/94-23 on 940821-0924.Violations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Operator Overtime & Followup ML14181A6101994-10-0404 October 1994 Insp Rept 50-261/94-24 on 940912-16.Violations Noted.Major Areas Inspected:Review of Licensee Status Re Implementation of SBO Rule & Corrective Actions for Previous Inspection Findings in Electrical Area IR 05000261/19940191994-09-0707 September 1994 Insp Rept 50-261/94-19 on 940724-0820.No Violations Noted. Major Areas Inspected:Plant Operations,Surveillance Operations,Maint Observation,Plant Support & Followup 1999-07-30
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-99-039, on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected1999-09-30030 September 1999 PNO-II-99-039:on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected IR 05000261/19990041999-07-30030 July 1999 Insp Rept 50-261/99-04 on 990523-0703.One Violation of NRC Requirements Occured & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19990031999-06-16016 June 1999 Insp Rept 50-261/99-03 on 990411-0522.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19990021999-05-11011 May 1999 Insp Rept 50-261/99-02 on 990228-0410.One NCV Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19990101999-05-0606 May 1999 Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 & & 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified:Failure to Review & Evaluate Background Info for Persons Granted Unescorted AA IAW 10CFR73.56(b)(3) IR 05000261/19990011999-03-29029 March 1999 Insp Rept 50-261/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980121999-02-12012 February 1999 Insp Rept 50-261/98-12 on 981206-990116.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980131999-01-0808 January 1999 Partially Withheld Insp Rept 50-261/98-13 on 981207-11 (Per 10CFR73.21).No Violations Identified.Major Areas Inspected: Physical Security Program for Power Reactors IR 05000261/19980111998-12-23023 December 1998 Insp Rept 50-261/98-11 on 981025-1205.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980091998-11-23023 November 1998 Insp Rept 50-261/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19980081998-10-0909 October 1998 Insp Rept 50-261/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980061998-07-16016 July 1998 Insp Rept 50-261/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980101998-06-29029 June 1998 Insp Repts 50-261/98-10,50-324/98-12,50-325/98-12 & 50-400/98-12 on 980601-04.No Violation Noted.Major Areas Inspected:Plant Support.Areas Specifically Evaluated,Access Authorization & Fitness for Duty Programs IR 05000261/19980031998-06-0909 June 1998 Errata to Notice of Violation of Insp Rept 50-261/98-03, Conducted on 980105-09.Correction Reflects More Accurately That Licensee Actions Taken to Correct Violation Were Ineffective in Correcting Condition IR 05000261/19980021998-04-27027 April 1998 Insp Rept 50-261/98-02 on 980215-0328.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980041998-03-24024 March 1998 Partially Withheld Insp Rept 50-261/98-04 on 980223-25 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors ML14181A9961998-03-12012 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:As of 970407,licensee Failed to Revise UFSAR to Include Following Effects of Changes Made in Facility or Procedures as Described in UFSAR ML14181A9911998-03-0404 March 1998 Notice of Violations from Insp on 980105-09.Violations Noted:Licensee Failed to Verify Adequacy of Design to Substantiate Final Design Documents Met Design Inputs & Adequate for Design Change Affecting Pumps B & C IR 05000261/19970141998-02-10010 February 1998 Errata to Insp Rept 50-261/97-14,transmitted on 980202.Typo Was Discovered on Pages 9 & 12 of Rept ML14181A9811998-02-0606 February 1998 Notice of Violation from Insp on 980105-09.Violation Noted: as of 970407,licensee Failed to Correct Conditions Adverse to Quality Associated W/Instrument Sensing Line Slope Deficiencies Documented in Ltrs & 960221 ML14181A9781998-02-0202 February 1998 Insp Rept 50-261/97-14 on 971123-980103.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 07100012/20110221997-12-22022 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Accomplish Mod Related Activities as Evidenced.On 971007,licensee Did Not Evaluate Post Mod Test Acceptance Criteria for Measuring Total Air Flow ML20197E4841997-12-12012 December 1997 Notice of Violation from Insp on 970831-1011 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Failed to Establish Measures to Assure That Conditions Adverse to Quality Promptly Identified ML14181A3961997-12-0909 December 1997 EN-97-111:on 971212,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Re Failure to Identify Promptly & Correct Mispositioned EDG Output Breaker Switch ML14181A9591997-11-0707 November 1997 Insp Rept 50-261/97-10 on 970831-1011.Violations Noted But Not Cited & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML14181A9481997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:Reactor Trip Channels Had Not Been Calibrated IAW Formula Specified in TS 2.3.1.2.e IR 05000261/19970081997-08-18018 August 1997 Insp Rept 50-261/97-08 on 970608-0719.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19972011997-08-14014 August 1997 Insp Rept 50-261/97-201 on 970407-0523.No Violations Noted. Major Areas Inspected:Si & AFW Sys & Support Sys ML14181A9331997-07-0707 July 1997 Insp Rept 50-261/97-07 on 970427-0607.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970041997-04-18018 April 1997 Insp Rept 50-261/97-04 on 970209-0322.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A9001997-04-18018 April 1997 Notice of Violation from Insp on 970209-0322.Violation Noted:On 970224,during Performance of Special Process Procedure SPP-002,freeze Plugging of Piping Not Requiring Brittle Fracture Steps 7.3.3,7.3.8 & 7.3.9 Not Followed IR 05000261/19970051997-04-18018 April 1997 Insp Rept 50-261/97-05 on 970317-21.No Violations Noted. Major Areas Inspected:Plant Support & Security Program Plans IR 05000261/19970011997-03-24024 March 1997 Pages 1 & 29 to Insp Rept 50-261/97-01 ML14181A8811997-02-28028 February 1997 Insp Repts 50-261/97-02,50-324/97-01 & 50-325/97-01 & 50-400-97-02 on 970113-0206.Violations Noted.Major Areas Inspected:Access Authorization & Fitness for Duty Programs ML14181A8541996-12-16016 December 1996 Notice of Violation from Insp on 960928-1116.Violation Noted:On 961016,operations Surveillance Test Procedure OST-160 Pressure Isolation Check Valve Back Leakage Test, Rev 23,inadequate,did Not Provide Adequate Instructions ML14181A8551996-12-16016 December 1996 Insp Rept 50-261/96-12 on 960928-1116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A8461996-10-25025 October 1996 Notice of Violation from Insp on 960818-0928.Violation Noted:Between 960917-19,shift Supervisors Assigned to Shifts Failed to Ensure That FMEA Controls Were Maintained in SFP Bldg While Fuel off-load Was Ongoing IR 05000261/19963011996-09-20020 September 1996 Exam Rept 50-261/96-301 on 960816-24.Exam results:14 SROs Passed & 1 Failed IR 05000261/19960081996-08-0101 August 1996 Insp Rept 50-261/96-08 on 960526-0706.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19960071996-06-28028 June 1996 Insp Rept 50-261/96-07 on 960603-14.No Violations Noted. Major Areas Inspected:Integrated Performance Assessment to Development Perspective of Plant Strengths & Weaknesses; Operations,Maint,Engineering,Plant Support,Safety,Security IR 05000261/19960051996-06-24024 June 1996 Insp Rept 50-261/96-05 on 960414-0525.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000261/19960041996-05-10010 May 1996 Insp Rept 50-261/96-04 on 960303-0413.No Violations Noted. Major Areas Inspected:Plant Operations,Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems & Close Out of Items & Fire Protection Program ML14181A8151996-04-25025 April 1996 Notice of Violation from Insp on 960311-0404.Violation Noted:From 951128 to 960309,licensee Allowed Access to Protected Area Using Hand Geometry Sys W/O Having Conducted Tests to Ensure Equipment Met 90% Detection Probability ML14181A8161996-04-23023 April 1996 Insp Rept 50-261/96-03 on 960311-0404.Violations Noted. Major Areas Inspected:Security Program for Power Reactors, Mgt Support,Security Program Plans & Procedures;Safeguards Info,Audits & Security Lighting IR 05000261/19960021996-03-27027 March 1996 Insp Rept 50-261/96-02 on 960121-0302.No Violations Noted. Major Areas Inspected:Plant Operations,Close Out of Open Issues,Maint & Surveillance,Physical Security Program, Internal & External Exposure Controls & Training ML14182A2821996-03-12012 March 1996 Notice of Violation from Exam on 960209-15.Violation Noted: Licensee Failed to Take Adequate Corrective Action to Correct Deficiency Previously Identified ML14181A8041996-02-16016 February 1996 Notice of Violation from Insp on 960101-20.Violation Noted: Operating Procedure OP-402 Was Not Properly Implemented in That AFW-110 & AFW-111 Were Not Maintained Fully Open IR 05000261/19950301996-01-26026 January 1996 Insp Rept 50-261/95-30 on 951126-1231.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Surveillance,Engineering & Plant Support ML14181A7991996-01-26026 January 1996 Notice of Violation from Insp on 960126-31.Violation Noted: PIC-012 Did Not Provide Adequate Instructions for Ensuring That Accumulator Level Properly Calibr IR 05000261/19950291995-12-20020 December 1995 Insp Rept 50-261/95-29 on 951022-1125.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Function 1999-09-30
[Table view] |
Text
UNITED STATES o
1NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, ATLANTA, GEORGIA 30323 Report No.: 50-261/92-09 Licensee: Carolina Power and Light Company P. 0. Box 1551 Raleigh, NC 27602 Docket No.: 50-261 License No.: DPR-23 Facility Name: H. B. Robinson Inspection Con cted: April 13-17, 1992 Inspector:
A z
enahan Date Signed R ctor Inspector Accompanying Personnel:
G. Bagchi, Chief, Structural and Geosciences Branch, NRR Y. Kim, Structural Engineer, Structural and Geosciences Branch, NRR H. Wang, Structural Engineer, Special Inspection Branch, NRR J. Braverman, Research Engineer, Brookhaven Natural Laboratory R. Morante, Senior Research and Development Engineer, Brookhaven National ory Approved by:
_
_
_
Blake, Chief Date Signed
/terials and Processes Section Engineering Branch Division of Reactor Safety SUMMARY Scope:
This special, announced inspection was conducted in the areas of a structural design criteria audit and a site inspection of structures by a team from the NRR Structural and Geosciences Branch. The inspector also reviewed the instrument maintenance progra PDR ADOCK 05000261 G
PDR
Results:
In the areas inspected violations or deviations were not identified. Two inspector follow up items were identified - paragraph 2.c. A strength was identified in the licensee's piping improvement program and cooling pond dam inspection program paragraph 2.a. The following weaknesses in material conditions were identified:
missing/loose nuts, bolts and washers in structural connections; lack of full thread engagement; defects in coatings on the containment building basement floor slab; and miscellaneous other structural defects. Some of these items had been identified and evaluated by the licensee, but repairs had not been made to restore the original design margin - paragraph 2.c. In addition the lack of written procedures to cover the installation and inspection of compression fittings is considered a weakness -
paragraph REPORT DETAILS Persons Contacted Licensee Employees
- C. Baucom, Acting Manager, Regulatory Compliance
- R. Beverage, Manager, Quality Control
- S. Billings, Technical Aide, Regulatory Compliance
- J. Bradshaw, System Engineer
- R. Chambers, Plant General Manager
- G. Comer, System Engineer
- R. Crook, Senior Specialist, Regulatory Compliance
- J. Curley, Manager, Robinson Engineering Support, Nuclear Engineering Department (NED)
- D. Dyksterhouse, Project Engineer, NED W. Farmer, ISI Engineer, Technical Support
- C. Jones, Senior Onsite Civil Engineer, NED E. Lear, Manager, Maintenance Support
- M. Payne, Manager, Technical Support
- L. Williams, Chief Civil Engineer, NED Other licensee employees contacted during this inspection included engineers, technicians, and administrative personne NRC Resident Inspector
- L. Garner, Senior Resident Inspector
- Attended exit interview NRR Structural Audit and Inspection of Site Structures - 37701 The inspector accompanied three structural engineers from the Office of Nuclear Reactor Regulation (NRR) and two consultants from the Brookhaven National Laboratory while they performed an audit of structural design criteria and inspected site structures. Details of the audit/inspection are stated belo Structural Audit NRC structural engineers and consultants met with licensee engineers and discussed the following topics:
-
Design criteria, including seismic, wind, flood protection, pile
foundation design, and load combinations
-
Containment building design parameters including the results of the five year tendon surveillance testing, and discussion of the preliminary results from the 20 years structural integrity test, completed the week prior to this inspectio Support Anchorage Spent fuel pool rack Intake structur Masonry wall design, including original IEB 80-11 program review, and the update pertaining to discovery and repair of penetrations in safety-related structures which were found to be filled with masonry block and/or bric Ground wate Buried pipin Settlement issues and seismic instrumentatio Safety related water storage tank Design and construction of the cooling water dam. Results of periodic inspections performed on the da CFR 50.59 evaluations and major structural modification Plant safety procedures for dealing with hurricanes, tornados and seismic event USI A-46/IPEEE, Seismic Qualification of Equipmen The licensee discussed their piping improvement program with the team. This program is an enhancement of IEB 79-14, which will result in improved piping drawings, updated piping calculations, and additional hanger modifications were required to restore the original design margin, improve pipe support configuration, and reduce stresses in supports and piping. This program was rated as a strength by the NRR audit tea The inspector reviewed the results of the cooling pond dam inspections conducted in 1980, 1985, and 1990. These inspections were performed in accordance with Regulatory Guide 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants. The inspector reviewed the following reports which document the dam inspection results:
-
Safety Investigation of Cooling Lake Dam and Appurtendent Structures, dated October, 1980
-
Safety Inspection of Cooling Pond and Ash Dam, dated September, 1985
-
Safety Inspection of Cooling Pond and Ash Dam, dated December, 1990 The inspector noted that the inspections were performed by qualified engineers experienced in the design and construction of dams. The inspector also noted that recommendations contained in the reports for remedial measures and maintenance have been implemented by the licensee. The licensee's dam inspection program was identified as a strengt Inspection of Safety Related Structures NRC personnel and consultants, accompanied by licensee civil engineers and operations personnel, walked down the structures listed below, and inspected those structures for any signs of deterioration, including concrete cracking/spalling, corrosion of steel, or.other defects, e.g. missing or loose nuts and bolts, etc. A summary of the areas inspected and preliminary findings are as follows:
-
Cooling Pond Dam - Overall the structure is in good conditio Small voids were identified at the water line in the concrete in upstream retaining wall, on the left abutment of the spillwa The vertical seals on the spillway tainter gates are leaking, permitting water to flow onto the structural supports for the gates. If this problem is not corrected, deterioration/corrosion of the supports may occu Class 1 Bay of the Turbine Building - Minor steel corrosion was noted on a few beams/column Control Room - No defects were note Roofs of control and auxiliary buildings - Corrosion was noted around the foundation of one diesel generator air intak Auxiliary Building and Diesel Generator Rooms - Numerous examples were noted of lack of full thread engagement on nuts on concrete expansion anchors and missing or loose washers, bolts, and nuts on baseplates and supports for some plant equipment. Licensee engineers indicated that the majority of these deficiencies had been previously evaluated and found to be acceptable. The audit team also noted numerous instances where drilled holes in concrete surfaces for concrete anchors, which had been abandoned, had not been patched. Some minor cracking in concrete walls was also note Containment Building Exterior Walls - The audit team examined concrete crack mapping areas for the structural integrity test on the exterior walls of containment building. No significant cracks were observed. The team identified approximately 12 holes in the exterior wall concrete which should be patched (dry packed). The team also examined areas along a horizontal construction joint which had been repaired during the last refueling outag Containment Building Interior - The coating on the floor of the basement was deteriorated in several areas. The coating was cracked, flaking, and chipping off. Licensee's engineers indicated that the coating would be repaired in accordance with Corrective Maintenance Procedure CM-613, Application of Protective Coatings Inside Containment. The audit team identified, and reported to licensee engineers, a section of a four inch diameter service water piping which was severely corrode Intake Structure - Lack of full thread engagement on two of four anchor bolts for the "north" service water strainer was noted. The studs and nuts on the friction clamp on the south service water header were corroded. Rod hangers supporting the fire water supply line were corroded, bent, and had missing or loose nuts. Abandoned anchor bolt holes in the walls require patching. The service water piping adjacent to the pumps show signs of corrosio Piping Penetration Area, Containment/Auxiliary Building Interface (Pipe Alley) Two pipe support baseplates anchored using concrete expansion anchors span the seismic gap between the auxiliary and containment buildings. The plates are anchored in both structures. Also three pipe supports which support piping adjacent to the containment wall are mounted on baseplates on the auxiliary building side of the seismic gap. The team questioned the design of these feature Safety-Related Water Storage Tanks - No defects were note Conclusions/Findings NRR will issue a summary report, in letter form, to the license, which list the audit findings, conclusions and recommendations. In addition to those stated above, other observation by the NRC team were:
-
The plant is well maintained from a structural standpoint, although it appears that some repairs were completed only when those repairs were absolutely necessar The licensee is considering the performance of periodic inspection of structure A design guide, number DG-III.15, Periodic Structural Inspection of Seismic Category I Structures, has been prepared to implement this program. This program, if implemented, would provide baseline data useful in identifying pre-existing conditions in case of a seismic event, and would monitor the integrity of safety-related structures. The NRC audit team concluded that this program would serve to improve the overall condition of site structure Repairs should be made to minor structural defects, such as those noted in paragraph 2.b, above, to restore the original design margin of the affected equipmen The final NRR report may contain additional findings, and in addition some of the findings listed above may be revised. The minor defects listed in paragraph 2.b above, were identified to licensee management as a weakness in the material condition of the plant and in the maintenance program implementation. Two inspector followup (IFI)
items were opened to track two of the more significant conditions observed by the team. These were as follows:
Pumps Due to Effect of Corrosion on Exterior Piping Surface The team noted that there appeared to be pits on the surface of the service water piping. However since the piping had been recently painted, it was difficult to verify. The NRC Audit team discussed the above pattern with the licensee, who indicated that they had performed inspections in this area and the effect of pipe wall thinning had been evaluated. A report had been prepared to document the results of the licensee's service water line inspections. This report will be reviewed by a Region II NDE specialist inspecto (2)
IFI 261/92-09-02, Adequacy of Pipe Support Baseplates Which Span Seismic Gap. Two pipe support base plates are supported on both the auxiliary building basemat and the containment building basemat spanning the seismic gap between the buildings. The inspector questioned the seismic response spectra used in analyzing these supports. The concrete in the containment basemat was cracked adjacent to one 4 bolt baseplate (two anchor bolts in auxiliary building basemat and two in containment building basemat. The crack width was approximately 1/8 inch, which makes these two anchors ineffective. Three additional supports which support valves on piping adjacent to containment wall penetrations are fixed to baseplates mounted on the auxiliary building side of the seismic gap. The support calculations will be reviewed by a Region 11 specialist inspecto No violations or deviation were identifie.
Instrument Maintenance Program (62704)
The requirements for installing and maintaining instrument tube compression fittings were discussed with licensee maintenance and quality control supervisory personnel. These discussions disclosed that the licensee does not have detailed written procedures to cover work and QC inspection activities for the installation of compression fittings. The licensee depends on the "skill of the craft" who receive training on the requirements for installing compression fittings. The specific work skill is covered in the craft training and development program. The licensee has also conducted special on-site training for this activity. The QC Manager stated that there were no specific requirements for QC personnel to inspect compression fitting Discussion with maintenance personnel disclosed that holdpoints are not normally established in work packages for QC inspection of compression fitting installation. Licensee compliance personnel stated that they were
fitting installation. Licensee compliance personnel stated that they were reviewing Information Notice 92-15, Failure of Primary System Compression Fitting, and will evaluate the need for written procedures for compression fitting installation. The lack of detailed written procedures for installation and inspection of compression fittings was identified to the licensee as a weakness in their instrument maintenance progra No violations or deviations were identifie.
Exit Interview The inspection scope and results were summarized on April 17, 1992, with those persons indicated in paragraph 1. The inspector described the areas inspected and discussed in detail the inspection results listed belo Proprietary information is not contained in this report. Dissenting comments were not received from the license IFI 261/92-09-01, Evaluate Service Water Lines Adjacent to Pumps Due to Effect of Corrosion on Exterior Piping Surface IFI 261/92-09-02, Adequacy of Pipe Support Baseplates Which Span Seismic Gap