05000416/LER-1982-183, Forwards LER 82-183/99X-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-183/99X-0
ML20070U870
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/03/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20070U872 List:
References
NUDOCS 8302140053
Download: ML20070U870 (1)


LER-2082-183, Forwards LER 82-183/99X-0
Event date:
Report date:
4162082183R00 - NRC Website

text

.

a .

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi h ERRtuddB P. O. B O X 1840, J AC K S O N, MIS SIS SlP PI 3 92 0 5 February 3, 1983 JAMES P. McGAUGHY, JR.

AS$13T ANT VICE PRE $lDENT Office of Inspection & Fnforcement U. S. Nuclear Regulatory Commission C Region II e .

101 Marietta St., N.W., Suite 3100 - -

Atlanta, Georgia 30303 _

Attention: Mr. J. P. O'Reilly, Regional Administrator },'

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station -

Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Smoke Detection Zone Alarmed and Would Not Reset LER 82-183/99 X-0 AECM-83/76 On December 22, 1982, the smoke detection zone covering the Auxiliary Building corridor area (elevation 139 feet) alarmed and would not reset. A fire watch was established pursuant to Technical Specification 3.3.7.9.

Attached is Special Report LER 82-183/99 X-0.

Yours truly, JPM: sap .j(y f f jf % )

Attachment cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8302140053 830203

, PDR ADOCK 05000416 -

l S PDR g FICIAL COPY

! Member Middle South Utilities System E--

WM

.