05000416/LER-1982-152, Forwards LER 82-152/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-152/03L-0
ML20064F459
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/30/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20064F462 List:
References
AECM-82-639, NUDOCS 8301060362
Download: ML20064F459 (1)


LER-2082-152, Forwards LER 82-152/03L-0
Event date:
Report date:
4162082152R00 - NRC Website

text

- ,-

MISSISSIPPI PO\NER & LIGHT COMPANY

] Helping Build Mississippi P. O. B O X 164 0, J AC K S O N, MIS SIS SIP PI 3 9 205 December 30, 1982 JAMES P. McGAUGHY, JR.

ASSISTANT VICE PREllDENT Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II f

g -

101 Marietta St., N.W., Suite 3100 2 Atlanta, Georgia 30303 w ,

Attention: Mr. J. P. O'Reilly, Regional Administrator 2 ca

Dear Mr. O'Reilly:

eO

SUBJECT:

Grand Gulf Nuclear SE' tion Unit 1 Docket No. 50-416 .

License No. NPF-13 File 0260/L-835.0 Q. A. Audit Reveals Required Diesel Fuel Oil Insolubles Test Not Performed LER 82-152/03 L-0 AECM-82/639 A Quality Assurance audit revealed that a diesel fuel oil insolubles test required by Technical Specification 4.8.1.1.2.c was not performed. The event i

is being reported pursuant to Technical Specification 6.9.1.13.c. Attached is LER 82-152/03 L-0.

Yours truly,

,k 7 '

l f&

JPM: sap .

%:sV Attachment cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o) i Mr. Richard C. DeYoung, Director (w/a) l Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555

+ r IC:1AL COPY 1

~.

l 8301060362 821230 PDR ADOCK 05000416 'f

-6 ~A1 f S PDR Member Middle South Utilities System