05000416/LER-1982-133, Forwards LER 82-133/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-133/03L-0
ML20079J913
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/17/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20079J915 List:
References
AECM-82-616, NUDOCS 8212280402
Download: ML20079J913 (1)


LER-2082-133, Forwards LER 82-133/03L-0
Event date:
Report date:
4162082133R00 - NRC Website

text

. n e

k MISSISSIPPIHelpingPOWER & LIGHT COMPANY Build Mississip'p'l: '

P. O. B OX 164 0. J AC K SO N. MIS SIS SIP PI 3 9 205 December 17, 1982

, R.

' [

jay,S P ,

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 Licepeo No. NPF-13 File 6260/L-835.0 Stippression Pool Drained Making RHR (LPCI Mode) and LPCS Inoperable LER 82-133/03 L-0 AECM-82/616 While in Operational Condition 4 the suppression pool was drained resulting in RHR (LPCI Mode) and LPCS being inoperable. An LCO was entered in accordance with T.S.3.5.2. This LER is late because an incident report was not written concurrently with the LCO report. Failure to submit the incident report was discovered while reviewing the LCO report on December 1, 1982.

Attached is LER 82-133/03 L-0.

Yours truly, JPM: sap /*y J. [ N T wj Attachment cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o) i i

Mr. Richard C. DeYoung. Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Ob$b\b.Cg>y.)'

Washington, D. C. 20555

~ '

D 8212280402 821217 PDR ADOCK 05000416 s PDR fh Member Middle South Utilities System