05000416/LER-1982-122, Forwards LER 82-122/99X-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-122/99X-0
ML20070E352
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/13/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20070E356 List:
References
AECM-82-591, NUDOCS 8212170222
Download: ML20070E352 (1)


LER-2082-122, Forwards LER 82-122/99X-0
Event date:
Report date:
4162082122R00 - NRC Website

text

.,-

.= .

MISSISSIPPI POWER & LIGHT COMPANY

]

metetuddB Helping Build Mississippi P. O. B O X 184 0, J AC K S O N, MIS SIS SIP PI 3 9 2 05 December 13, 1982 , ,

'k

  1. $EsiEr$$Ns70I'/r"  % ,

n .

Office of Inspection & Enforcement -

U. S. Nuclear Regulatory Commission Region II 3-101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 c:D Attention: Mr. J. P. O' Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Inoperable Fire Rated Assembly LER 82-122/99 X-0 AECM-82/591 During shutdown on November 4, 1982, it was found that the cover to the HVAC chase in the Control Building Lower Cable Spreading Room, elevation 148 feet, had been removed. This report is submitted as a special report, pursuant to Technical Specification 3.7.7.a. Attached is LER 82-122/99 X-0.

Yours truly,

,/

JPM: sap /pp 3 4 inc &a 4 , *) ( .

Attachment cc: Mr. N. L. Stampley (w/a)'

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. C. B. Taylor (w/o)

Mr. Richard C. DeYoung Director (w/a)

Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Comnission Washington, D. C. 20555 Document Control Desk (w/a)

U. S. Nuc1 car Regulatory Commission Washington, D. C. 20555 r212170222 821213 b.N

'PDR ADOCK 05000416PDR S .

Member Middle South Utilities System 8M