05000416/LER-1982-103, Forwards Updated LER 82-103/01X-1

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 82-103/01X-1
ML20067A536
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/24/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20067A539 List:
References
AECM-82-570, NUDOCS 8212020058
Download: ML20067A536 (1)


LER-2082-103, Forwards Updated LER 82-103/01X-1
Event date:
Report date:
4162082103R00 - NRC Website

text

b MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi RAMIMiddB P. O. B O X 16 4 0, J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 November 24, 1982

  1. Esi[UN[OfsN'['

Office of Inspection & Enforcement .j

  • U. S. Nuclear Regulatory Commission 2

'y Region II  :;j

^

101 Marietta St., N.W., Suite 3100 y .a m

Atlanta, Georgia 30303 ,'

Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

a a

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Failure to Satisfy Requirements of T.S.3.8.1.1.f LER 82-103/01 X-1 AECM-82/570 During shutdown on October 22, 1982, while revicwing documentation declaring HPCS Division III Diesel Generator inoperative, it was discovered the requirements of Technical Specification 3.8.1.1.f were not satisfied. This report is being submitted as a follow-up to LER 82-103/01 T-0, dated November 5, 1982. Attached is LER 82-103/01 X-1 with supplementary information.

Jgurs ruly, ip

\tt c ent b 3' " )

cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desh (w/a)