05000416/LER-1982-091, Forwards LER 82-091/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-091/03L-0
ML20066B693
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/04/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20066B695 List:
References
AECM-82-526, NUDOCS 8211090144
Download: ML20066B693 (1)


LER-2082-091, Forwards LER 82-091/03L-0
Event date:
Report date:
4162082091R00 - NRC Website

text

'

s

- MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi ElbilitilddB P. O. B OX 1640, J AC K S O N, MIS SIS SIP PI 3 9 2 05 November 4, 1982 JAMES P. Mi$AUGHY, JR.

AS$15 TANT VICE PRESIDENT Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 3100 ,,

a Atlanta, Georgia 30303 r

Attention: Mr. J. P. O'Reilly, Regional Administrator 5$ gjy en 4a

Dear Mr. O'Reilly:

3; D  :, i "

SUBJECT:

Grand Gulf Nuclear Station -

Unit 1 ',

Docket No. 50-416 cn License No. NPF-13 CC File 0260/L-835.0 Only One of Two Required ECCS Systems Operable Due to RHR Associated Standby Diesel Generator Out of Service

Reference:

LER 82-091/03 L-0 AECM-82/526 I With the plant in Cold Shutdown, the LPCS System was taken out of service to perform Surveillance Procedure 06-ME-1M61-V-0001. This resulted in only one of the two required ECCS Systems being operable. This event is being l

reported per T.S.3.5.2 and T.S.6.9.1.13.b. Attached is LER 82-091/03 L-0.

Yours truly, 1

l

! / y/

JPM: sap l

Attachment cc: Mr. N. L. Stampley (w/a) l Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission

Washington, D. C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555

~

' ~~B2i1090144 8211d4' $ C PDR ADOCK 05000416 S PDR _ OVFICN.pOP X  %/

Member Middle South Utilities System