05000416/LER-1982-077, Forwards LER 82-077/01T-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-077/01T-0
ML20069H188
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/13/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20069H192 List:
References
AECM-82-481, NUDOCS 8210190417
Download: ML20069H188 (1)


LER-2082-077, Forwards LER 82-077/01T-0
Event date:
Report date:
4162082077R00 - NRC Website

text

,

,~  %

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O . BOX 1640. J AC K SO N, MIS SIS SIP PI 3 9 2 05 October 13, 1982 JAMES P. McGAUGHY JR A$$13 TANT VICE PRESIDENT Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Regional Administrator 'D

'J 4

m ,.

Dear Mr. O'Reilly:

] ,.m 10

SUBJECT:

GrandGulfNuclearSt5 bon . W Unit I cl3 Docket No. 50-416 License No. NPF-13 h

1 z

File 0260/L-835.0 3 .,

Secondary Containment c -

Integrity - Two 2" Penetratibns Not Sealed -

Reference:

LER 82-077/01 T-0 AECM-82/481 On September 30, 1982, it was discovered that two 2" penetrations were not sealed from the Auxiliary Building to the Control Building. T.S.3.6.6.1 and 3.0.4 were applicable when operational condition 3 was entered during non-nuclear heatup. Attached is LER 82-077/01 T-0.

Yours,truly, h cbe, JPM: sap g, ,

Attachment 7 g 4 gf,,/j ,

cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission g' Washington, D. C. 20555 gof,lp

.._ OY 8210190417 821013 DR ADOCK 05000 (=11 Member Middle South Utilities System

.